Loading...
Report • Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Car son Testing Inc • Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330-9155 FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163 Special Inspection FINAL SUMMARY LETTER June 16, 2004 T0405233A City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department Re: Hawks Beard Townhomes- Lot# 1 10965 SW 130 Avenue- Tigard, OR Permit No.: MST2003 -00274 Dear Sir or Madam: This is to certify that in accordance with Section 1701 of the Uniform Building Code, Title 24, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there ar- - ny further questions regarding this matter, please do not hesitate to contact this office. Respe • ly submitted, CARL: • TESTING, INC. J �� * F. Hietpas O • ations Manager J H /ks cc: Derek L Brown & Associates- Bruce Cone Froelich Consulting Engineers- Todd Nagle Mentrum Architecture- Bayard Mentrum P:\WORD'REPORTSW INLTR\T _06/11/04 FRI 15:02 FAX 503 870 9147 CARLSON TE5T1N6 �....� Bend • Carlson Geotech_ .. cal Po ,q 406.. a1�0 a , NE P.O. Box x7 i 91 8 A Wigan of Carlson Testing. Inc. Tigard, Ore 97281 Salem, OR 97301 Bend, OR 97708 Phone (503) 884,3480 Phone (503) 569.1252 Phone (541) 330-9155 Geotechnital Consulting Construction Inspection and Related Tests FAX (503) 6709147 FAX (503) 5891309 FAX (541) 330-9163 Final Summary Letter M.57 2d73 - Cu 2-7 `f September 10, 2003 - revised November 19, 2003 / O °/ 5 5 c-,/ J 3 O � Mr. Mart Hansen LOT ' Derek L. Brown & Associates, Inc. 9500 SW Barbur Blvd., Suite 220 Portland, Oregon 97219 Re: . Final Letter of Geotechnical Observations Hawks Beard Townhomes SW Hawks Beard Street Tigard, Oregon CGT Project G0202050A Carlson Geotechnical (CGT) served as geotechnical Engineer -of- Record (EOR) for the Hawks Beard Townhomes project, located at the intersection of SW 130 Avenue and SW Hawks Beard Street in Tigard, Oregon. We performed a geotechnic al investigation of the site, the results of which were presented in our report of Geotechnical Engineering Services dated December 10, 2002, and performed geotechnical observation during construction. Our observations were completed on an on -call, part -time basis between the dates of November 19, 2002 and July 17, 2003. • Site Stripping: Prior to construction, the site contained surface vegetation in structural areas. Roadways and lots were stripped of vegetation between November 19 and 25'', 2002. Based on our field observations, the site was stripped of organic topsoil in general accordance with our recommendations. • Subgrade Conditions: After stripping had been completed, the site subgrade soil was cement treated for planned construction activities in the winter. Based on our field observations, the subgrade soil has been prepared in general accordance with our recommendations. • Roadway Fill Placement and Compaction: Up to 2 feet of fill was placed and compacted on roadways in the southeast corner of the site. CGT conducted 6 in- place relative compaction tests on the native brown silt fill. Based on our field observations and in place density testing the native silt fill for roadways was placed and compacted in general accordance with our recommendations (92 percent of ASTM D- 1557). • Roadway Aggregate Base Rock: CGT conducted 12 in - place relative compaction tests on the roadway aggregate base rock on May 2, 2003. The roadway aggregate base rock was prepared in general accordance with the recommendations given by the City of Tigard (95 percent of AASHTO T-99). _06/11/04 FRI 15:03 FAX 503 670 9147 CARLSON TESTING •vv Hawks Beard Townhomes Tigard, Oregon September 10, 2003 • Roadway Pavements: Asphalt was placed on the South Alley, North Alley, Hazelwood, Briarwood, Woodridge, Huntington, and Hawks Beard on May 13, 2003. CGT conducted 17 in -place relative compaction tests on the asphalt Test results ranged from 91 to 93.1 percent of ASTM D -2950. • Lots: Based on ow field observat ions, lots 8 through 13. and lots 1 through 3 were cut and are on native silt. The remaining 53 lots are on structural fill up to 3 feet deep. Based on our observations and in -place relative compaction testing, lots 1 through 62 have been prepared in general accordance with our recommendations. • Foundation Bearing Surfaces: Foundation bearing surfaces were not prepared at the time of this report; therefore, we have not observed any of the foundation subgrade soils for the proposed residences. -,. • .: i•. - . - , • . - - - -- - - . ,• - . .I. L'. . 3 . ••• , . . •• i. ponringooncrete. We understand that the City of Tigard will not require individual lot foundation subgrade observations. • Utility trench backfill compaction. CGT conducted 28 in -place relative compaction tests on utility trench backfill material for the sanitary sewer and storm sewer trenches. Based on our density testing, the utility trenches backfill has been compacted in general accordance with the recommendations given by City of Tigard (95 percent of AASHTO T -99). Based on our observations, as documented in our field reports, and to the best or our knowledge, within our scope of work, the above geotedhnical summaries accurately reflect our observations. • Our services were provided on an on-call basis, in which we relied on the contractor to contact our office for the scheduling of our services. We cannot be held contractually responsible for those items. if any, that we did not observe or test. Sincerely, CARLSON GEOTECHNICAL /5 Jared M etti Geotechnical Staff R7► � c i l7 � EM.14 nne M Hie , P.E. Pn cipal eote. nical Engineer �•�t 1D: P:IG OTECH PROJECTS'2002 Pmgmfs 1awks Beard Townhanes - COSIFInaI l euer.DOC Carlson Geatechnicel Page 24:42 06/17/04 THU 08:12 FAX 503 884 0954 CARLSON TESTING 0003 Maw Office item Office Bend Office P.O. Box 23814 4080 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1232 Phone (541) 330.9155 FAX (503) 684-0954 FAX (503) 589.1309 FAX (641) 330 -9163 Special Inspection FINAL SUMMARY LETTER June 16, 2004 T0405233A City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department Re: Hawks Beard Townhomes- Lot# 1 10965 SW 130 Avenue- Tigard, OR Permit No.: MST2003 -00274 Dear Sir or Madam: This is to certify that in accordance with Section 1701 of the Uniform Building Code, Title 24, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there arJ , ny further questions regarding this matter, please do not hesitate to contact this office, Res • - ;f ly submitted, CAR : • TESTING, INC. J F. F. Hietpas O ' ations Manager J ' H/ks cc: Derek L Brown & Associates- Bruce Cone Froelich Consulting Engineers- Todd Nagle Mentrum Architecture- Bayard Mentrum P.IWORD REPOR7SWINLTRIT Mar 30 04 08:47a 2 03/30/2004 07:53 50325245 HEATING ATING anus us FORECAST HEATING AND AIR CONDITIONING CORP. • Datc: 03 -29 -04 Project Unit Type "A ", SW 130d' Avenue, Tigard Customer Autumn Pads, LLC Return Air Calculation Funtace / CFM: 900 Ducting Installed / Size: 9" x 14" x 17' Friction per 20' of ducc 0.25 CFM per 20': 1230 (abavc CFM of Furnace installed) Return Air Grill: 24" x 12" x 900 CFM Location of Air Return Grill Center Location / Stair way / Hal] may (Best location for this application) Calculation Danny tiluzcs 503•- 793 -515 p.0. RAX 4a89 • PUaT .nN R . (503) 252 S93 PHONE (503) 253 -1020