Loading...
Correspondence 95 73 6- 4 -# 0 .z0//- 2 (0 / // e_ Zo // - o0 5CD PAUL J. FORD AND COMPANY l'! C OF TIG� STRUCTURAL ENGINEERS b ARD 250 East Broad Street • Suite 500 • Columbus, Ohio 43215 JAN 3 j i i January 24, 2012 CITY BUILDING DIVIS ION Shremshock Architects 6130 Sunbury Road Suite 100 Columbus, OH 43081 Attn: Dennis Richard Re: Washington Square Limited Tigard, Oregon Response to Building Department Comments Building Permit No. BUP2010 -00261 (PJF Job No. A35011 -0084) Dear Dennis: We have reviewed the attached Building Department Comments dated December 20, 2011, and offer the following response (Only Comments 2 and 3 are the responsibility of Paul J. Ford and Company): Response to Comments 2 and 3. Structural Calculations for the storefront framing and interior partitions are enclosed. The Plans, Sections and Details shown on the architectural and structural drawings have been revised to reflect the metal framing design required by the structural calculations. Please let us know if you have any questions. Sincerely, PAUL J. FORD AND COMPAN Q.pt Gregory D. Klapheke, P.E. Department Manager rs COLUMBUS, OHIO • ATLANTA, GEORGIA • ORLANDO, FLORIDA (614) 221 -6679 (404) 266 -2407 (407) 898 -9039 Fax (614) 221 -2540 Fax (404) 869 -4608 Fax (407) 897 -3662 www.pjfweb.com • December 20, 2011 RE: TENANT IMPROVEMENT Project Information Building Permit: BUP2010 -00261 Construction Type: 2 -B Address: 9573 SW Washington Sq. Occupancy Type: M Area: 5506 Sq. Ft. Stories: 1 Name: The Limited Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2010 edition; 2010 Oregon Fire Code. Please respond to conditions below. 1) Construction requirements for suspended ceiling systems are found in the Oregon Building Codes Division website under Statewide Code Interpretations dated 4/20/2007. (see interpretations {structural} at >. www.bcd.oregon.gov) PJF 2) Provide calculations and construction details (including seismic bracing details for non full height partitions) for all walls. Note: The roof structure may be approximately 30' above the finished floor. OSSC 106.1 PJF 3) Please provide calculations and construction details for the soffits and storefront construction. Every structure, and portion thereof, including non structural components that are permanently attached to structures and their supports and attachments, shall be designed and constructed to resist the effects of earthquake motions in accordance with ASCE 7 as modified by Section 1613.7. The seismic design category for a structure is permitted to be determined in accordance with Section 1613 or ASCE 7. OSSC 1613.1 plpp 4) Please submit plans and calculations for steel storage racks that comply with the design requirements of ASCE7 (15.5.3). GC/ 5) Please provide a permit valuation based on the total work being performed. LTD Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical plumbing equipment, flooring, ceilings and any fixture attached to the building. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailedestimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Dan Nelson Senior Plans Examiner (503) 718 -2436 dann @tigard- or.gov &-aoil- ea/ , 446 zo /l- 9 3 ( R SHREMSHOCK Architects & Engineers 6130 S. Sunbury Rd. Westerville, OH 43081 t 614 545 4550 888 373 4130 f 614 545 4555 www.shremshock.com REVISION DOCUMENT PROJECT BULLETIN No. 1 01/23/2012 The Limited Washington Square Store #800 9585 S.W. Washington Square Rd. Tigard, OR 97223 ARCH PROJECT No.: 110645.801 To the Contractor: This bulletin, issued after the execution of the contract, describes proposed revisions of the contract documents and requests from contractor the amount of change, if any, in contract sum to accomplish the work described. It is assumed no change in contract time will be necessary unless contractor submits written request for time extension, including justification, with his proposal for work described in this bulletin. Except, as otherwise described herein, or as shown on drawings issued with this, current contract documents apply to proposed work. This bulletin is not an order to do work. After receipt and review of the proposal requested, a change order will be issued to authorize execution of the work, or portion thereof, if the owner so directs. REASON FOR REVISION: Building Department Comments Submit proposals for the change described herein on Contractor's letterhead. List each item individually as listed below. DRAWINGS INCLUDED WITH THIS BULLETIN: DRAWING REVISION PROPOSALS: A00.0, A04.1, A10.1, A10.2, A10.3 & Al2.1 A00.0 - COVERSHEET • Revised sheet index. A04.1 — REFLECTED LIGHTING PLAN • Added Suspended Ceiling Note A10.1 — HANGBAR WALL DETAILS • Revised details K -1 and L per structural engineer changes A10.2 — FIXED SHELF DETAILS • Revised detail E -2 per structural engineer changes A10.3 — CABINET DETAILS • Revised details H and K per structural engineer changes Al2.1 — PARTITION & FLOORING DETAILS • Revised details A, B, J, and M per structural engineer changes • Void details C and K END OF REVISIONS INITIALS: DGR 2 of 2 r -- -- - - - - - - " /4 �� 9573 1,J , ., � I/ — i 1 e_ 2 7 //- oro5(p r -. . SHREMSHOCK Architects & Engineers 6130 S Sunbury Rd Westerville, OH 43081 t 614 545 4550 888 373 4130 f 614 545 4555 %%%%ww• shrcroshock coin 01/23/2012 State of Oregon Structural Specialty Code Division 1535 Edgewater St. NW Salem, OR 97304 513 - 718 -2436 Attn: Dan Nelson Sr. Plans Examiner RE: The Limited Washington Square Store #800 9573 SW Washington Square Rd Portland, OR 97223 Permit #: BUP2010 -00261 • SAI Project No.: #11643.R01 Dear Mr. Nelson, Itemized below are responses to the review comments, dated 12/20/2011: 1) Construction requirements for suspended ceiling systems are found in the Oregon Building Codes Division website under Statewide Code Interpretations dated 4/20/2007. (see interpretations( structural) at www.bcd.oregon.gov) Response — Please refer to sheet A04.1. Note added directing the GC to comply with NWCB Technical Bulletin (TB) 401 - Suspended Ceiling Systems requirements 2) Provide calculations and construction details (including seismic bracing details for non full height partitions) for all walls. Note: The roof structure may be approximately 30' above the finished floor. OSSC 106.1 Response — Please refer to Structural Engineer BD response letter, revised structural drawings, enclosed structural calculations and revised architectural details A &B /Al2.1. 1 • 1 3) Please provide calculations and construction details for the soffits and storefront construction. Every structure, and portion thereof, including non structural components that are permanently attached to structures and their supports and attachments, shall be designed and constructed to resist the effects of earthquake motions in accordance with ASCE 7 as modified by Section 1613.7. The seismic design category for a structure is permitted to be determined in accordance with Section 1613 or ASCE 7. OSSC 1613.1 Response — Please refer to Structural Engineer BD response letter, revised structural drawings and the following revised architectural details: • A10.1 — details K -1 and L • A10.2 — detail E -2 • A10.3 — details H and K 4) Please submit plans and calculations for steel storage racks that comply with the design requirements of ASCE7 (15.5.3). Response — Please refer to the enclosed non -sales storage rack shop drawings and calculations. 5) Please provide a permit valuation based on the total work being performed. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment, flooring, ceilings and any fixture attached to the building. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. Response — Below are the values received from the awarded General Contractor: • Electrical $37,000 • Gas $0 • Mechanical $16,969 • Plumbing equipment $6,500 • Flooring $13,205 • Ceilings $15,500 • Total $328,037.00 Please do not hesitate in contacting me should you have any questions or concerns. Sincerely, Dennis G Richard Shremshock Architects, Inc. 2 of 2 � ---- -- - .-- - - - - -1