Loading...
Correspondence (2) r _ ce2/A.( — 66260 ct 6,3 61 .6 t i r So > ft ® Consulting En,glneeis RECEIVED DEC 8 20 December 5, 2011 CITY OF TIGARD BUILDING DIVISION Mr. Bryan Boggs PDMS Design Group 3100 East Randol Mill Road Arlington, TX 76011 RE: Plan Review Comments Buckle Tenant Improvement — Washington Square Permit No. BUP2011 -00200 Dear Bryan, This letter is in response to the Plan Review Comments, dated October 3, 2011. This letter follows the same order as the Plan Review and incorporates the revisions to the storefront framing. For your convenience, we have r - included the reviewer's comments in italics followed by our response. RESPONSES TO PLAN REVIEW 1. Provide calculations and construction details (including seismic bracing details for non full height partitions) for all walls and ceiling bracing. Note: The roof structure may be approximately 30' above the finished floor. OSSC 106.1 KPFF Response: See the attached sketch SK -16 for construction details of the partition walls and bracing. See the attached calculation page PR -16 that verify the adequacy of the partition walls and bracing. 2. Please provide calculations and construction details for the soffits and storefront construction. Every structure, and portion thereof, including non structural components that are permanently attached to structures and their supports and attachments, shall be designed and constructed to resist the effects of earthquake motions in accordance with ASCE 7 as modified by Section 1613.7. The seismic design category for a structure is permitted to be determined in accordance with Section 1613 or ASCE 7. OSSC 1613.1 KPFF Response: See the attached sketches SK -1A thru SK -15 for construction details for the soffits and storefront. See the attached calculations PR -01 Thru PR -15 that verify the adequacy of the soffit and the storefront. 117 SW Fifth Avenue, Suite 2500 Portland, Oregon 9 7204 -3 628 (503) 227 -3251 Fax (503) 227 -7980 Seatt /n ra : orna Pottrand Eunrno San l'anrrs::o Sar Los Angeles Irvine San Diego Phoenix Danker St L:m,s New York • Mr. Bryan Boggs PDMS Design Group RE: Plan Review Comments Buckle Tenant Improvement — Washington Square Permit "No. BUP2011 -00200 December 5, 2011 Page 2 of 2 3. Please submit plans and calculations for steel storage racks that comply with the design requirements of ASCE7 (15.5.3). KPFF Response: See the attached sketch SK -17 for the construction detail of the steel storage rack anchorage. See the attached calculation PR -17 that verifies the adequacy of the steel storage rack anchorage. If you have any questions or require further information, please call me. Sincerely, Ian K. Eikanas, P.E., S.E., LEED AP 1, SM•IKE kw 211599/plan review 12.05-11 docx pPR® t ;. 1577 • 0 0HZa01 V . k. 21.i 14 ' 4 IO.L - . • E)QIIRES: t -.l . • it