Permit CITY OF TIGARD BUILDING PERMIT
• COMMUNITY DEVELOPMENT Permit #: BUP2013 -00009
T j GAR D 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 03/07/2013
Parcel: 1 S 134AA02100
Jurisdiction: Tigard
Site address: 10300 SW NIMBUS AVE P -A
Project: FMC Subdivision: IKOLL BUSINESS CENTER, TIGARD Lot: 3
Project Description: TI demo existing office suite for new outpatient dialysis treatment center (12 treatment bays and 1 separation)
Contractor: JHC COMMERCIAL LLC Owner: FRESENIUS MEDICAL CARE, NA
11125 SW BARBUR BLVD BLD C 5251 DTC PARKWAY
PORTLAND, OR 97219 GREENWOD VILLAGE, CO 80111
PHONE: 503 - 624 -7100 PHONE: 303 - 712 -1814
FAX: 503 - 684 -5295
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB DC Provision Review, COM TI - Ping 03/07/2013 $256.00
Occupancy Grp: B Occupancy Load: 73 DC Provision Review, COM TI - LRP 03/07/2013 $38:00
Dwelling Units: 0 Permit Fee - Additions, Alterations, 03/07/2013 $4,265.09
Demolition
Stories: 1 Height: 0 ft - 12% State Surcharge - Building
03/07/2013 $511.81
Bedrooms: 0 Bathrooms: 0 Plan Review 03/07/2013 $2,772.31
Value: $645,952 Plan Review - Fire Life Safety 03/07/2013 $1,706.04
Park - Commercial and Industrial 03/07/2013 $668.68
TDT - Transportation Development Tax 03/07/2013 $1,468.00 • •
Floor Areas: Info Process /Archiving - Lg $2.00 (over 03/07/2013 $86.00
Total Area: 0 11x17)
Info Process /Archiving - Sm $0.50 (up to 03/07/2013 $172.00
Accessory Struct: 0 11x17)
Basement: 0 Metro Const. Excise Tax - Commercial 03/07/2013 $775.14
Carport: 0 Use
Covered Porch: 0
Deck: 0
Garage: 0 •
Mezzanine: 0
Total $12,719.07
Required: Required Items and Reports (Conditions)
1 Special Inspection (see plans)
Fire Sprinkler: Yes Parapet:
Fire Alarm: Yes Protected Corridors: No
Smoke Detectors: Manual Pull Stations:
•
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952- 001 -0010 through OAR 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.198 1.800.3 .2344.
Issued By: .t/L / J Permittee Signature: ` Y .
Call 503.639.4175 by 7:00 a.m. for the next available insp ction dat-.
This permit card shall be kept in a conspicuous place on the job site unti ompl ion of the project.
Approved plans are required on the job site at the time of each . action.
Building Permit Application .,
Commercial FOR OFFICE USE ONLY
RECEIVED
Received
City of Tigard Date /B : ( q Permit No3 — per —
13125 SW Hall Blvd., Tigard, OR 97223 0 9 2013 Plan Review
- WPM Phone: 503.718.2439 Fax: 503.598 .19 Date/B : :ati� s. Other Permit
Inspection Line: 503.639.4175 Date Ready = .y: luris: 0 See Page 2 for d.
T I G A R D CITY OF TIGARD I Su pplemental Information
Internet: www.tigard- or.gov Notifted/Methody Gi
BUILDING DIVISION L a ,..
TYPE OF WORK ' EQUIRED DATA: I- AND 2- FAMILY DWELLING
❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed.
Indicate the value (rounded to the nearest dollar) of all
® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the
work indicated on this application.
CATEGORY OF CONSTRUCTION c-.
❑ 1- and 2- family dwelling IN Commercial /industrial Valuation: S
❑ Accessory building ❑ Multi- family Number of bedrooms:
❑ Master builder ❑ Other: Number of bathrooms: t
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 10300 SW Nimbus Ave. New dwelling area: square feet
City /State /ZIP: Tigard, OR 97223 Garage /carport area: square feet (
Suite /bldg. /apt. no.: P -A I Project name: FMC Scholls Ferry Covered porch area: square feet r
Cross street/directions to job site: From Scholls ferry SB past 217 Deck area: square feet
Left on Nimbus, third entry on the left Other structure area: square feet
Suite P -A is on the SW corner of building P REQUIRED DATA: COMMERCIAL -USE CHECKLIST
Subdivision: I Lot no.: Permit fees* are based on the value of the work performed.
Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all
equipment, materials, labor, overhead, and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Tenant improvement of existing space (demo existing office suite) for new Valuation: SS645,952.00
outpatient dialysis treatment center (12 treatment bays plus 1 separation) Existing building area: 5,409 square feet
New building area: 5,409 square feet
❑ PROPERTY OWNER I ® TENANT Number of stories: I
Name: Fresenius Medical Care, NA Type of construction: V -B
Address: 5251 DTC Parkway Occupancy groups:
City /State /ZIP: Greenwood Village, CO 80111 Existing: B
Phone: (303)712 -1814 Fax: (na) New: B
® APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES*
Business name: Clark Kjos Architects (Please refer ro fee schedule)
Structural plan review fee (or deposit): 2,772
Contact name: Alex Hill
Address: 333 NW 5 Ave FLS plan review fee (if applicable): 1,706
Total fees due upon application: S4,478.00
City /State /ZIP: Portland, OR 97209 y 1778 Amount received:
Phone: (503) 206-3814 I Fax: : (503) 224-7116
I
E -mail: alexhill @ ckarch.com
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Commercial and residential prescriptive installation of
CONTRACTOR roof -top mounted PhotoVoltaic Solar Panel System.
Business name: TBD JC C'�Mll/Q� A1, Submit two (2) sets of roof plan with connection details
and fire department access, along with the 2010 Oregon
Mdress: /t' ZS Sw +31 -R8 a 12 81.-V to , Solar Installation Specialty Code checklist.
City /Smote /ZIP: Permit fee (includes plan review
and administrative fees):
}�oP -MA-ND OIZ 97-Z(I $180.00
j
Phone: (023 67,lit — /DO I Fax: ( s3) 6 S 5 z 7 S
Y- State surcharge (12% of permit fee): $21.60
CCB Iic.:
0.9�� Total fee due upon application: $201.60
z
Authorized signature: C -- This permit application expires if a permit is not obtained /
within 180 days after it has been accepted as complete.
Print name: Alex Hill, Principal I Date: 01/09/13 • Fee methodology set by Tri- County Building Industry
Service Board.
1: \Building \Permits \BUP -COM PermitApp.doc 02/24/2011 440- 4613T(I I /02 /COM/WEB)
C
Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
•
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
• (1) Every project for renovation, alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty -five per -cent (25 %).
VALUATION: Total of all renovation, alteration or modification being done,
excluding painting and wallpapering: [1] $ 645,952
MULTIPLIER (25% barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $ •
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
• (e) Accessible telephones: $
(f) Accessible drinking fountains: and, $
(g) When possible, additional accessible elements such as storage and
alarms: $
TOTAL (shall equal line [2] of Valuation Computation): $
•
1:\ Building \Permits \BUP -CO\1 PermitApp.doc 03 /03/2011
Building Division
Plan Submittal Requirements
TIGARD Commercial & Multi- Family - New, Additions or Alterations
1. SITE PLAN (fully dimensional, drawn to scale) labeled with:
A. ❑ map & tax lot # ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking, including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape -ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations, plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit - based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey, and full set of architecture drawings.
1:\ Building \ Permits \BUP -COM PcrmitApp.doc 03/03 /2011
Building Division
Plan Submittal Requirement Matrix
T [ GARD'' Commercial & Multi- Family - New, Additions or Alterations
•
Type of Submittal # of Plans
(Includes new, additions and alterations.) Required at
Submittal
•
Demolition Permit 2
(site plan required showing location square _
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
•
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After.plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington
County, and Tualatin Valley Fire & Rescue), if applicable.
t: \ Building \Pcrmits \BUP -CO\t PcrmitApp.doc 03 /03/2011
°.ter. .
C L A R K ® K J 0 S
TRANSMITTAL
To City of Tigard Community Date 1/10/13
Development Fax Number
Plan review / building dept. # of Pages
13125 SW Hall Blvd.
Tigard, OR 97223
Attention Shirley Treat (including transmittal)
Project FMC Scholls Ferry Project # 11057
Case No. BUP2013 -00009
Sent by ❑ mail ® courier ❑ UPS ❑ FedEx
❑ facsimile ❑ e -mail ❑
Sent from ❑ Seattle office ® Portland office
Qty Date Description
1/7/13 3` set of drawings as discussed in our intake meeting yesterday
Remarks
Hi Shirley,
Here is the third set of plans we discussed yesterday.
Let me know if there is anything else needed, otherwise I'll touch base with Dan Nelson next
Wednesday.
Thanks,
By Alex Hill
This transmittal contains confidential information and is intended for the use of the recipient named above. If you have received this
document in error, please destroy it and notify us.
CLARK/KJOS ARCHITECTS, LLC i
333 NW 5th Ave., Portland, Oregon 97209 710 Second Ave., Suite 800, Seattle, Washington 98104
telephone 503/224 -4848 fax 503/224 -7116 telephone 206/652 -0722 fax 206/652 -0720
Building Division
Development Code Provision Review
TIGARD Commercial Projects - No Associated Land Use Case
Building Permit No: au/9010/3-0000 ci ❑ Expedited Review
Project Name: '
Site Address: 10317 Std tLIIA6t1S 4Ve , Suite /Bldg #: P4'
Plan Submittal Date: t/Q ( 3
To the Applicant:
➢ If the proposed use is not permitted within the zone, please contact the Building Division to cancel
the permit application. Building Permit Technicians (503) 718 -2439.
➢ If a land use is required and for all other questions, please contact the staff person listed above the
Planning Review section.
Staff: please check items along left only if approved.
Planning Review (contact t nc'S Y-U✓'t 2 at 503 - 718 - or aef @tigard- or.gov)
Proposal: T. I. r c-.! ? t o •
Zoning IAA C " 2 -
Permitted Use Yes a''' No ❑
Land Use Required: Yes L`►d No ❑
Notes: C A I O- €V 2 ( L(1YPG Ock C )fo D''W ! 7 ." - I-hon V-P( o iV Q-f cp
❑ Approved C2" Not Approved Date: I 1 201
✓' pp '4 / 3 mm D 240t w - 7
I: \CURPLN\Masters\Development Code Provision Revies kNo Land Use Comm.doc REVISED 10/4/12
City of Tigard 0 S % i M Q
° TDT — COUNTYWIDE TRANSPORTATION DEVELOPMENT TAX
TIGAIZD Rate Calculation Worksheet
APPLICANT �RSg / /1 f C il4 DATE i 5 e) / 3
MAILING ADDRESS S, SJ L ; -i9R 444.109 v PREPARED BY 417
/ ` 5
CITY / ZIP / PHONE (/? EA/Won 14 1...2. 4 6e) ea re „ // PLANS CHECK 1 3
TAX MAP # / S / 3 4 AA D 2 I e o PROJECT TITLE
SITUS # ADDRESS /030e, c' JJ ' v / H? VS Arc_ .
FORMER USE(S)
U
CODE UNITS X RATE = AMOUNT DESCRIPTION /NOTES
I `/JD S'/ x („, = *37, 6.7 5'4017( G- e,ce.12,d�`•
x =
x =
x =
TOTAL TDT, FORMER USE(S) %ff il,'O 3
RE ✓( gb o Ajp'h l h►n+o IPARY 2 'ico v►J'
PROPOSED USE(S) Gc/C�. 7,eZ AoNo9 1/ '757 .
U
CODE UNITS X RATE _ AMOUNT DESCRIPTION /NOTES
— *— zc 2 a, 3 .7O = 527v /IS D - iri
/ 710 ' .D x '25,3* = •J 2 i l , SOo D a 1'led caf CPU--
X = - *a - I VS/o IeolkiDsaymr
2 12.0 p, x'*Z 3, 3 - *0 = f C37,s418 9odfti h ', (d ).,„
TOTAL TDT, PROPOSED USE(S) / f 30,
LESS TOTAL TDT, FORMER USE(S) ••• 547 7r 37 / 6 ' 73,
TDT INCREASE/(DECREASE) i (INCRFAF� -g7E)
PAYMENT METHOD
CASH /CHECK ES /---)/32)r-5 /�C
CREDIT Iz i.ct t Glee- : lvoo p0E, 5-4 z__ _
BANCROFT AGREEMENT M o tE S�09r 540e." = / / S
(PROMISSORY NOTE) " A es /� 3 3'T 3 `
Cam-" ` 4-A11 d: 4, F ---- 4 , 45
DEFER TO OCCUPANCY
I/OFS/CD/FORMS/TDT Rate Calculation Worksheet.indd (Rev. 4/22/09)
Location:
Record Type:
Inspection Type:
Comments:
Inspection Date:
Record ID:
Result:
City of Tigard
13125 SW Hal Blvd.
Tigard, OR 97223 Tel: 503.718.2439
10300 SW NIMBUS AVE P-A, TIGARD, OR,
97223
Commercial - Building
220 Slab
05/09/2013 10:00
BUP2013-00009
PASS
Front new ADA ramp and rear slab
Violation Summary:
Inspector Contractor
Location:
Record Type:
Inspection Type:
Comments:
Inspection Date:
Record ID:
Result:
City of Tigard
13125 SW Hal Blvd.
Tigard, OR 97223 Tel: 503.718.2439
10300 SW NIMBUS AVE P-A, TIGARD, OR,
97223
Commercial - Building
287 Suspended ceiling
05/16/2013 00:00
BUP2013-00009
PASS
Violation Summary:
Inspector Contractor
Location:
Record Type:
Inspection Type:
Comments:
Inspection Date:
Record ID:
Result:
City of Tigard
13125 SW Hal Blvd.
Tigard, OR 97223 Tel: 503.718.2439
10300 SW NIMBUS AVE P-A, TIGARD, OR,
97223
Commercial - Building
285 Drywall nailing
04/23/2013 00:00
BUP2013-00009
PASS
Firewalls
Violation Summary:
Inspector Contractor
Location:
Record Type:
Inspection Type:
Comments:
Inspection Date:
Record ID:
Result:
City of Tigard
13125 SW Hal Blvd.
Tigard, OR 97223 Tel: 503.718.2439
10300 SW NIMBUS AVE P-A, TIGARD, OR,
97223
Commercial - Building
275 Framing
03/26/2013 00:00
BUP2013-00009
PART
Partial for true supports and 4x8 ceiling support
Rut not true
Violation Summary:
Inspector Contractor
4 Pozo/.3- 7
COMcheck Software Version 3.9.1
404 Interior Lighting Compliance
Certificate
2010 Oregon Energy Efficiency Specialty Code
Section 1: Project Information
Project Type: New Construction
Project Title: FMC SCHOLLS FERRY
Construction Site: Owner/Agent: Designer/Contractor:
Mark Oenyer
MFIA Inc.
2007 SE Ash St
Poilland,OR 97214
503-234-0548
mark.den y e rgi mfi a-e n g.co m
Section 2: Interior Lighting and Power Calculation
A B C D
Floor Area Allowed Allowed Watts
Watts f ft2
Health Care-Cfrric 5437 0.89 4839
Total Alowed Watts= 4839
Section 3: Interior Lighting Fixture Schedule
A 9 C D E
Fixture ID:Description I Lamp I Wattage Per Lamp!Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Health Care-Clinic(5437 sq.IL)
Linear Fluorescent 1:L-1/L-1 E:2x4 flr.148"T8 32W/Electronic 2 9 62 558
Linear Fluorescent 2:L-21L-2E:2x4 fir.148"TB 32W!Electronic 3 10 92 920
Linear Fluorescent 3:L-3/L-3E:2x4 flr.!48"T8 32W!Electronic 3 17 92 Exempt
Exemption:Lighting for Medical/Age Related Issues
Linear fluorescent 4:L-4/L-4E:2x4 flr./48"T8 32W!Electronic 2 16 62 992
Incandescent 1:L-5:Pendant!Incandescent 75W 1 4 75 300
Incandescent 2:L-6:LED downlight/Other 1 38 14 532
Linear Fluorescent 5:L-7:1x4 fir.148"T8 321N/Electronic 2 3 62 186
Linear Fluorescent 6:L-8:Strip fir./48"T8 32W!Electronic 2 11 62 682
Linear Fluorescent 7:L-9:UC flr./24'T8 17W/Electronic 1 8 17 136
Linear Fluorescent 8:L-10:Vanity flr./48"T8 32W/Electronic 2 3 62 186
Incandescent 3:L-12:LED exit sign/Other 1 6 5 Exempt
Exemption:Exit Signs
Total Proposed Watts= 4492
Section 4: Requirements Checklist
In the following requirements,the relevant code section reference is shown in f J. '+'denotes that more details exist in the specified code
section. Checkboxes identify requirements that the applicant has not acknowledged as being met.Check marked requirements identify those
the applicant acknowledges are met or excepted from compliance. Plans reference page/section'identifies where in the plans/specs the
requirement can be verified as being satisfied.
Lighting Wattage:
✓ 1. [505.1+1 Total proposed watts must be less than or equal In Inlet allowed waits.
Allowed Wattage:4839 Proposed Wattage:4492
Project Title: FMC SCHOLLS FERRY Report date: 01/04/13
Data filename:G:tClark Kjos18541 FMC Scrolls Ferry\Energy FormsIFMC-SCHOLLS.cxl Page 1 of 5
Complies:YES
Mandatory Requirements:
v 2. [505.4]Exit signs.Internally illuminated exit signs shall not exceed 5 watts per side.
Plans reference page/section: E2.0 4
v 3. (505.2.2.3+]Daylight zone control.All daylight zones are provided with individual controls that control the lights independent of general _
area lighting In the non-daylight zone.In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided.
Automatic daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent,and provide an automatic
OFF control,while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be
controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations
(i.e.,north,east,south,west).Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical
fenestration.
/ Exception applies:Spaces required to have occupancy sensors
reference page/section: E2.0
`/ 4. [505.2.1 +]Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of tit Moor
area and each area enclosed by walls or boor-to-ceiling partitions.The required controls are located within the area served by the
controls or are a remote switch that identifies the lights served and indicates their status.
Plans reference page/section: 22.0
v 5. [505.2.3+]Steeping unit controls.Master switch at entry to hoteUmotel guest room.
Plans reference page/section: N/A
`/ 6. [505.2.1.1]Egress lighting.Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut
off during periods that the building space served by the means of egress is unoccupied.
Plans reference page/section: 22.0
I/ 7. 1505.22+]Additional controls.Each area that is required to have a manual control shall have additional controls that meet the
requirements of Sections 505.2.2.1 and 505.2.2.2.
Plans reference page/section: 22.0
`/ 8. 1505.2.2.1+]Light reduction controls.Each space required to have a manual control also allows for reducing the connected lighting load -
by at least 50 percent by either
1)controlling(dimming or multi-level switching)all luminaires;or
2)dual switching of alternate rows of luminaires,akemate luminaires,or alternate lamps;or
3)switching the middle lamp luminaires independently of other lamps;or
4)switching each lumnaire or each lamp.
6/ Exception applies:An occupant-sensing device controls the area.
Plans reference page/section: E2.0
I/ 9. [505.2.22]Buildings larger than 2,000 square feel are equipped with an automatic control device to shut off lighting in those areas.This
automatic control device shad function on either.
1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not
exceed 10,000 square feet and are not more than one floor,or
2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or
3)a signal from another control or alarm system that indicates the area is unoccupied.
6/ Exception applies:Sleeping units,patient care areas;and spaces where automatic shutoff would endanger safety or security.
Plans reference page/section:E2.0
v 101505.2.2]Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation.
Plans reference page/section: E2.0
s/ 111505.2.2]An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a
space.
Plans reference page/section: X2,0
• 121505.2.2]Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants
leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all
storage and supply rooms up to 1000 square feet.
Plans reference page/section:E2,0
✓ 13.[505.2.2.2.1]Occupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override
switching device Mal:1)is readily accessible,2)is located so that a person using the device can see the lights or the arca controlled
Project Title: FMC SCHOLLS FERRY Report date: 01/04/13
Data filename:G:1CIark Kjos18541_FMC_Scholls Ferry■Energy Forms'FMC-SCHOLLS.cxl Page 2 of 5
by That switch,or so that the area being fit is annunciated.3)is manually operated,4)allows the lighting to remain on for no more than
2 hours when an override is initiated,and 5)controls an area not exceeding 2,000 square feet.
Plans reference page/section:E2.0
1,' ✓ 144505.2.2.2.21 Holiday scheduling.Automatic fighting shutoff operating on a time-of-day scheduled basis has an automatic holiday
scheduling feature that turns off all loads for at least 24 hours,then resumes the normally scheduled operation.
Plans reference page/section: e.0
`/ 154505.2.4+1 Exterior fighting controls.Lighting not designated for dusk-to-dawn operation shal be controlled by either a combination of a
photosensor and a time switch,or an astronomical time switch.Lighting designated for dusk-lo-dawn operation shall be controlled by
an astronomical time switch or photosensor.
Plans reference page/section: E2.0
16.(505.3]Tandem wiring.The following luminaires located within the same area shall be tandem wired:
1.Fluorescent luminaires equipped with one,three or odd-numbered tamp configurations,that are recess-mounted within 10 feet
center-to-center of each other.
2.Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted
within 1 foot edge-to-edge of each other.
Plans reference page/section: E2,0
v 17.1505.5.1 +]Medical task lighting or art/history display lighting claimed to be exempt From compliance has a control device independent
of the control of the nonexempt lighting.
Plans reference page/section: E2.0
v 184505.7+]Each dwelling unit in a building is metered separately.
Plans reference page/section:N/A
Interfo gjihttngRASSES4D Igp 7%better than code. •
Section 5: Compliance Statement
Compliance Statement The proposed lighting design represented in this document is consistent with the building plans,specifications and
other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2010 Oregon Energy
Efficiency Specialty Code requirements in COMcheck Version 3.9.1 and to comply with the mandatory requirements in the Requirements
Checklist.
Name-Title Signature Date
Project Title: FMC SCHOLLS FERRY Report date:01/04/13
Data filename:G:1Ctark Kjost8541_FMC_Scholls FerrylEnergy Forms1FMC-SCHOLLS.cx1 Page 3 of 5
COMcheck Software Version 3.9.1
Exterior Lighting Compliance
Certificate
2010 Oregon Energy Efficiency Specialty Code
Section 1: Project Information
Project Type. New Construction
Project Title: FMC SCHOLLS FERRY
Exterior Lighting Zone: 2(Neighborhood business district)
Construction Site: Owner/Agent: Designer/Contractor:
Mark Denyer
MFIA Inc.
2007 SE Ash St
Portland,OR 97214
503-234-0548
mark.denyer@mfia-eng.com
Section 2: Exterior Lighting Area/Surface Power Calculation
A B C D E F
Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed
Watts Wattage Watts Watts
l Unit (B x C)
Entry(Main entry) 10 ft of door width 20 Yes 200 252
Exits(Other door(not main entry)) 9 R of door width 20 Yes 180 84
Total Tradable Watts'= 380 336
Total Allowed Watts= 380
Total Allowed Supplemental Watts"= 600
•Wattage tradeoffs are only allowed between tradable areas/surfaces.
^A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable are tVeurlaces.
Section 3: Exterior Lighting Fixture Schedule
A B C D E
Fixture ID:Description I Lamp I Wattage Per Lamp 1 Ballast Lamps/ #of Fixture (C X 0)
Fixture Fixtures Watt.
Entry(Main entry 10 ft of doorwldlh):Tradable Wattage
Compact Fluorescent 1:L-15:Exterior wall mounted I Triple 4-pin 42W/Electronic 2 3 84 252
Exits(Other door(not main entry)9 ft of door width):Tradable Wattage
Compact Fluorescent 2:Existing:Exterior soffit mounted I Triple 4-pin 42W/ 1 2 42 84
Electronic
Total Tradable Proposed Watts= 336
Section 4: Requirements Checklist
In the following requirements,the relevant code section reference is shown in(J. '+'denotes that mom details exist in the specified code
section.Checkboxes identify requirements that the applicant has not acknowledged as being met Check marked requirements identify those
the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the
requirement can be verified as being satisfied.
Lighting Wattage:
v 1. [505.6.2+J Within each non-tradable area/surface.total proposed watts must be less than or equal to total allowed watts.Across all
tradable areas/surfaces,total proposed watts must be less than or equal to total allowed watts.
Complies:Passes.
Project Title: FMC SCHOLLS FERRY Report dale:01/04/13
Data filename:G:1CIark Kjos18541_FMC_Scholls FenylEnergy FormslFMC-SCHOLLS.cxl Page 4 of 5
Controls, Switching, and Wiring:
✓ 2. [505.6.2+]All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt
lighting.
Plans reference page/section: E2,0
✓ 3. [505.2.4+]Lighting not designated for dusk-to-dawn operation is controlled by either a a photosensor(with time switch),or an
astronomical lime switch.
Plans reference page/section: E2,0
✓ 4. [505.2.4+]Lighting designated for dusk-to-dawn operation is controlled by an astronomical time switch or photosensor.
Plans reference page/section: E2.0
✓ 5. [505.2.4+j AI lime switches retain programming and the time setting during loss of power for a period of at least 10 hours.
Plans reference page/section: E2._0
✓ 6. [505.2.4+J Lighting designated to operate more than 2000 hours per year for Uncovered Parking Areas shall be equipped with motion
sensors that will reduce the luminaire power by thirty-three percent or turn off one-third the luminaires when no activity is detected.
Plans reference page/section:e2.0
Exterior Lighting Restrictions and Exceptions:
✓ 7. [505.6.1 +]Mercury vapor and incandescent lighting is not permitted for use as exterior lighting.
r/ 8. [505.6.1 +]Exempt lighting fixtures are equipped with a control device independent of the control of the nonexempt lighting and are
identified in Section 3 table above.
Plans reference page/section:ff0
Ex'�enrcrriCigli1fng PASSES:Deslgti 66%better than code.
Section 5: Compliance Statement
Compliance Statement The proposed exterior lighting design represented in This document is consistent with the building plans.specifications
and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2010 Oregon
Energy Efficiency Specialty Code requirements in COMcheck Version 3.9.1 and to comply with the mandatory requirements' Ins`
Requirements Checklist.
• j'ti Q n1 ✓ v4,e �ti 3/�s-�V 1 lJ"r/ G r /
Name-Title Signature Dal
Project Title: FMC SCHOLLS FERRY Report dale:01/04/13
Data filename:G:1CIark Kjost8541_FMC_Scholls FenyIEnergy Forms\FMCSCHOLLS.cxl Page 5 of 5
COMcheck Software Version 3.9.1
Mechanical Compliance Certificate
2010 Oregon Energy Efficiency Specialty Code
Section 1 : Project Information
Project Type: New Construction
Project Title : FMC SCHOLLS FERRY
Construction Site: Owner/Agent: Designer/Contractor:
Mark Denyer
MFIA Inc
2007 SE Ash St
Portland.OR 97214
503-234-0548
mark denyer@mfia-eng.com
Section 2: General Information
Building Location(for weather data) Portland,Oregon
Climate Zone 4c
Section 3: Mechanical Systems List
Quantity System Type&Description
1 HVAC System 1 (Single Zone):
Heating: 1 each-Central Furnace.Gas,Capacity=200 kBtu/h, Efficiency=81.00%Et
Cooling 1 each-Rooftop Package Unit,Capacity=90 kBtu/h. Efficiency= 12.50 EER.Air-Cooled Condenser,
Air Economizer
1 HVAC System 2(Single Zone):
Heating: 1 each-Central Furnace,Gas.Capacity=80 kBtu/h. Efficiency=81.00%Et
Cooling: 1 each-Rooftop Package Unit,Capacity=60 kBtu/h,Efficiency= 15.00 SEER,Air-Cooled Condenser,
Air Economizer
2 Water Heater 1.Gas Storage Water Heater,Capacity: 100 gallons,Input Rating: 150 Btu/h w/Circulation Pump.
Efficiency 94 00%Et
Section 4: Requirements Checklist
In the following requirements.the relevant code section reference is shown in[I '+'denotes that more details exist in the specified code
section. Checkboxes Identify requirements that the applicant has not acknowledged as being met. Check marked requirements identify those
the applicant acknowledges are met or excepted from compliance- 'Plans reference page/section'identifies where in the plans/specs the
requirement can be verified as being satisfied
Requirements Specific To: HVAC System 1 :
✓ 1 [503 2 3+]Equipment meets minimum efficiency: Central Furnace(Gas) 80.00%Et(or 78%AFUE)
✓ 2. [503.2.3+]Equipment meets minimum efficiency: Rooftop Package Unit: 11.00 EER(11.2 IEER)
✓ 3 [503 2.6+]Energy recovery ventilation systems.Individual fan systems that have both a design supply air capacity of 5,000 cfm or
greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system.
Plans reference page/section:
v 4 [503 3.1 +]Supply air economizers shall be provided on each cooling system and are capable of providing 100-percent outdoor air.
even if additional mechanical cooling is required to meet the cooling load of the budding.Systems provide a means to relieve excess
outdoor air during economizer operation to prevent overpressunzing the budding.
Plans reference page/section MECH PLANS
Requirements Specific To: HVAC System 2 :
• t [503 2.3+]Equipment meets minimum efficiency: Central Furnace(Gas) 80 00'/c Et(or 78%AFUE)
Project Tide: FMC SCROLLS FERRY Report date: 01/02/13
Data filename:G:\Clark Kjos\8541_FMC_Scholls Ferry\Energy Forms\FMC-SCHOLLS.cxl Page 1 of 11
✓ 2 (503.2.3+]Equipment meets minimum efficiency Rooftop Package Unit: 13.00 SEER
✓ 3 [503 2.6+]Energy recovery ventilation systems Individual fan systems that have both a design supply air capacity of 5,000 cfm or
greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity have an energy recovery system
Plans reference page/section
✓ 4 [503 3 1 +]Supply air economizers shall be provided on each cooling system and are capable of providing 100-percent outdoor air.
even if additional mechanical cooling is required to meet the cooling load of the building Systems provide a means to relieve excess
outdoor air during economizer operation to prevent overpressunzing the building.
Plans reference page/section: MECH PLANS
Requirements Specific To: Water Heater 1 :
t✓ 1 (504.2+]Newly purchased equipment meets the efficiency requirements. Gas Storage Water Heater efficiency 80 00°10 Et(198 SL
kBtu/h)
✓ 2 [504 2]Service water-heating equipment performance efficiency Water heating equipment efficiency has been venfied through data
furnished by the manufacturer or through certification under an approved certification program
✓ 3 [504.3]Temperature controls. Service water-heating equipment have controls to allow a setpoint of 110'F for equipment serving
dwelling units and 90'F for equipment serving other occupancies. The outlet temperature of lavatories in public facility rest rooms is
limited to 110'F
Plans reference page/section SPECS
1,/ 4 [504-4]Heat traps Water-heating equipment not supplied with integral heat traps and serving noncirculating systems have heat traps
on the supply and discharge piping associated with the equipment.
Plans reference page/section: DETAILS
✓ 5. (504.5+1 Pipe Insulation. For automatic-circulating hot water and externally heated(such as heat trace or impedance heating)systems.
piping is insulated in accordance with the specifications of this section
✓ 6 [504.6+1 Hot Water System Controls.Systems designed to maintain usage temperatures in hot water pipes is turned off automatically
when the hot water system is not in operation and has demand sensing controls that turn off the system when there is no demand
when the system is operational A check valve or similar device is installed per requirement details
Plans reference page/section: DETAILS
Generic Requirements: Must be met by all systems to which the requirement is applicable:
✓ 1. [503.2.1 +]Calculation of heating and cooling loads Design loads are determined in accordance with the procedures described in the
ASHRAE/ACCA Standard 183.Alternatively,design loads have been determined by an approved equivalent computation procedure
✓ 2. (503.2.1 1 +]Packaged Electnc Equipment Specified packaged electncal equipment has a heat pump as the pnmary heating source.
Plans reference page/section:
✓ 3 (503 2 2 +]Equipment and system sizing Heating and cooling equipment and systems capacity do not exceed the loads calculated in
accordance with Section 503 2 1
Plans reference page/section
`/ 4 [503.2 3+]HVAC Equipment Performance Requirements Reported efficiencies have been tested and rated in accordance with the
applicable test procedure. The efficiency has been venfied through certification under an approved certification program or,if no
certification program exists,the equipment efficiency ratings are supported by data furnished by the manufacturer
✓ 5 [503.2.4 1 +]Thermostatic Controls The supply of heating and cooling energy to each zone is controlled by individual thermostatic
controls that respond to temperature within the zone
Plans reference page/section. MECH PLANS
✓ 6 [503 2 4 1 1]Heat pump supplementary heat Heat pumps having supplementary electric resistance heat have controls that,except
during defrost,prevent supplementary heat operation when the heat pump can meet the heating load
Plans reference page/section:
✓ 7. [503.2.4.2]Set point overlap restriction.Where used to control both heating and cooling,zone thermostatic controls provide a
temperature range or deadband of at least 53F(2.8'C)within which the supply of heating and cooling energy to the zone is capable of
being shut off or reduced to a minimum
Plans reference page/section.
✓ 8 [503.2.4.3]Optimum Start Controls Each HVAC system has controls that vary the start-up time of the system to just meet the
temperature set point at time of occupancy
Plans reference page/section —
v (503.2.4.4+]Off-hour controls Each zone is provided with thermostatic setback controls that are controlled by either an automatic time
clock or programmable control system.
Project Title: FMC SCHOLLS FERRY Report date. 01/02/13
Data filename: G\Clark Kjos18541_FMC_Scholls Ferry\Energy Forms\FMC-SCHOLLS.cxl Page 2 of 11
Plans reference page/section:
✓ 10.[503 2.4 5+J Shutoff damper controls. Both outdoor air supply and exhaust are equipped with not less than Class I motorized dampers
Plans reference page/section•
t/ 11.(503.2.4.6+]Freeze Protection and Snow melt system controls. Freeze protection systems, such as heat tracing of outdoor piping and
heat exchangers,including self-regulating heat tracing,include automatic controls capable of shutting off the systems when outdoor air
temperatures meet code criteria.
Plans reference page/section:
t/ 12.(503.2.4.8)Separate air distribution systems.Zones with special process temperature requirements and/or humidity requirements are
served by separate air distribution systems from those serving zones requiring only comfort conditions:or shall include supplementary
control provisions so that the primary systems may be specifically controlled for comfort purposes only
Plans reference page/section-
s/ 13.(503 2.4 9)Humidity control.If a system is equipped with a means to add or remove moisture to maintain specific humidity levels in a
zone or zones a humidity control device is provided.
Plans reference page/section:
✓ 14.[503 2.4 9.11 Humidity control.Where a humidity control device exists it is set to prevent the use of fossil fuel or electncity to produce
relative humidity in excess of 30 percent.Where a humidity control device is used for dehumidification,it is set to prevent the use of
fossil fuel or electricity to reduce relative humidity below 60 percent.
Plans reference page/section•
✓ 15.(503.2.4.9.2]Humidity control.Where a humidity control device exists it is set to maintain a deadband of at least 10%relative humidity
where no active humidification or dehumidification takes place.
Plans reference page/section:
✓ 16.[503.2.5]Ventilation.Ventilation,either natural or mechanical,is provided in accordance with Chapter 4 of the International Mechanical
Code.Where mechanical ventilation is provided,the system has the capability to reduce the outdoor air supply to the minimum
required by Chapter 4 of the International Mechanical Code.
Plans reference page/section: MECHANICAL PLANS
6/ 17.[503.2.5 1 +]Demand controlled ventilation(DCV). DCV is required for spaces larger than 500 R2 for simple systems and spaces larger
than 150 ft2 for multiple zone systems.
Plans reference page/section:
t/ 18.[503.2.5 2+J Kitchen hoods.Kitchen makeup is provided as required by the Oregon Mechanical Specialty Code
Plans reference page/section:
t/ 19 [503 2.5 3+J Enclosed parking garage ventilation controls In Group S-2,enclosed parking garages used for storing or handling
automobiles employs automatic carbon monoxide sensing devices.
Plans reference page/section:
t/ 20.(503.2.7+J Duct and plenum insulation and sealing.All supply and return air ducts and plenums are insulated with the specified
insulation.When located within a building envelope assembly,the duct or plenum is separated from the building exterior or
unconditioned or exempt spaces by a minimum of R-8 insulation.All ducts,air handlers and filter boxes are sealed.Joints and seams
comply with Section 603.9 of the International Mechanical Code.
✓ 21.[503.2.7.1.1 +J Low-pressure duct systems.All longitudinal and transverse joints,seams and connections of low-pressure supply and
return ducts are securely fastened and sealed with welds,gaskets,mastics(adhesives),mastic-plus-embedded-fabnc systems or
tapes installed in accordance with the manufacturer's installation instructions.
Plans reference page/section•
t/ 22.[503.27 1 2+]Medium-pressure duct systems.All ducts and plenums designed to operate medium-pressure are insulated and sealed
in accordance with Section 5032.7.Pressure classifications specific to the duct system are clearly indicated on the construction
documents
Plans reference page/section•
✓ 23 (503.2.7 1 3+J High-pressure duct systems. Ducts designed to operate at high-pressure are insulated and sealed in accordance with
Section 503 2.7. In addition,ducts and plenums are leak-tested in accordance with the SMACNA HVAC Air Duct Leakage Test Manual.
Plans reference page/section.
t/ 24.[503.2.9.1 +]Air system balancing.Each supply air outlet and zone terminal devices equipped with means for air balancing in
accordance with the requirements of IMC 603.17. Discharge dampers intended to modulate airflow are prohibited on constant volume
fans and variable volume fans with motors 10 horsepower.
•
Project Title: FMC SCHOU.S FERRY Report date:01/02/13
Data filename: G:\Clark Kjos18541 FMC Scholls Ferry\Energy Forms■FMC-SCHOLLS.cxl Page 3 of 11
Plans reference page/section.
v 25 (503 2.9 3+]Manuals The construction documents require that an operating and maintenance manual be provided to the building
owner by the mechanical contractor. See long description for specifications_
Plans reference page/section
V/ 26 [503.2.10+]Air System Design and Control. Each HVAC system having a total fan system motor nameplate hp exceeding 5 hp meets
the provisions of Sections 503.2.10 1 through 503.2.10.2. -
Plans reference page/section
✓ 27.[503 2 10.1 +]Allowable fan floor horsepower. Each HVAC system at fan system design conditions does not exceed the allowable fan
system motor nameplate hp(Option 1)or fan system bhp(Option 2)as shown and calulated in requirement details
Plans reference page/section.
v 2 [503 2.10.2+]Motor nameplate horsepower. For each fan,the selected fan motor is no larger than the first available motor size greater
than the brake horsepower(bhp)
Plans reference page/section
✓ 29.[503.2 10.3 1]Large Volume Fan Systems. Fan systems over 8,000(7 m3/s)cfm without direct expansion cooling cods that serve
single zones reduce airflow based on space thermostat heating and cooling demand A two-speed motor or variable frequency drive
reduces airflow to a maximum 60 percent of peak airflow or minimum ventilation air requirement as required by Chapter 4 of the
International Mechanical Code,whichever is greater
Plans reference page/section.
✓ 30 [503.2.10.3.2+]All air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI
conditions greater than or equal to 110.000 Btu/h that serve single zones have their supply fan operation controlled according to code
specific requirements.
Plans reference page/section
✓ 31 [503 2 10 4]Series fan-powered terminal unit fan motors. Fan motors for series fan-powered terminal units are
electronically-commutated motors and have a minimum motor efficiency of 70 percent when rated in accordance with NEMA Standard
MG 1-2006 at full load rating conditions
Plans reference page/section
✓ 32 [503 2.12]Hot Gas Bypass Limitation For cooling systems<=240 kBtu/h, maximum hot gas bypass capacity is no more than 50%
total cooling capacity. -
Plans reference page/section
t/ 33.All service water heating requirements are listed in requirements section specific to the system
Section 5: Compliance Statement
Compliance Statement. The proposed mechanical design represented in this document is consistent with the building plans. specifications
and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2010
Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 3.9.1 and to comply with the mandatory requirements in the
Requirements Checklist
Mark Denyer-Mechanical Engineer 1-2-13
Name-Title Signature Date
Section 6: Post Construction Compliance Statement
u HVAC record drawings of the actual installation. system capacities,calibration information,and performance data for each equipment
provided to the owner.
lj HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor
IJ Written HVAC balancing and operations report provided to the owner
The above post construction requirements have been completed.
Principal Mechanical Designer-Name Signature Date
Project Title. FMC SCHOLLS FERRY Report date. 01/02/13
Data filename G\Clark Kjos\8541_FMC_Scholls Ferry\Energy Forms\FMC-SCHOLLS cxl Page 4 of 11
COMcheck Software Version 3.9.1
\ Mechanical Requirements
Description
2010 Oregon Energy Efficiency Specialty Code
The following list provides more detailed descriptions of the requirements in Section 4 of the Mechanical Compliance
Certificate.
Requirements Specific To: HVAC System 1 :
1. (503 2.3]The specified heating and/or cooling equipment must meet the following minimum efficiency: Central Furnace(Gas) 80.00
%Et(or 78%AFUE)
2 (503 2 3]The specified heating and/or cooling equipment must meet the following minimum efficiency. Rooftop Package Unit 11 00
EER(11 2 IEER)
3 [503.2 6]Energy recovery ventilation systems. Individual fan systems that have both a design supply air capacity of 5.000 cfm(2 36
m3/s)or greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity shall have an energy
recovery system that provides a change in the enthalpy of the outdoor air supply of 50 percent or more of the difference between the
outdoor air and return air at design conditions. Provision shall be made to bypass or control the energy recovery system to permit
cooling with outdoor air where cooling with outdoor air is required.Where a single room or space is supplied by multiple units,the
aggregate supply(cfm)of those units shall be used in applying this requirement.
Exception(s):
- Where energy recovery systems are prohibited by the International Mechanical Code.
- Systems serving spaces that are not cooled and are heated to less than 60'F(15 5`C)
- Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy
• Type 1 kitchen exhaust hoods.
- Cooling systems in climates with a 1-percent cooling design wet-bulb temperature less than 64F(18C)
- Systems requinng dehumidification that employ senes-style energy recovery cods wrapped around the cooling coil when the
evaporative coil is located upstream of the exhaust air stream.
- Systems exhausting toxic, flammable,paint exhaust,corrosive fumes,or dust.
- Laboratory fume hood systems that include at least one of the following features:
1)Variable-air-volume hood exhaust and room supply systems that reduce exhaust and makeup air volume to 50 percent or less
of design values during periods of reduced occupancy or system demand
or
2)Vanable-air-volume hood exhaust and room supply systems that reduce exhaust and makeup air volume and/or incorporate a
heat recovery system to precondition makeup air from laboratory exhaust shall meet the following:
A«B'(E/M)=50%
Where:
A=Percentage that the exhaust and makeup air flow rates will be reduced from design conditions
B=Percentage sensible heat recovery effectiveness.
E= Exhaust airflow rate through the heat recovery device at design conditions
M=Makeup air flow rate of the system at design conditions,
or
3)Direct makeup(auxiliary)air supply equal to at least 75 percent of the exhaust rate, heated no warmer than 2'F(1.1'C)below
room setpoint,cooled to no cooler than 3'F(1.7'C)above room setpoint,no humidification added.and no simultaneous heating and
cooling used for dehumidification control.
4. [5013.1]Supply air economizers shall be provided on each cooling system and shall be capable of providing 100-percent outdoor air.
even if additional mechanical cooling is required to meet the cooling load of the building Systems shall provide a means to relieve
excess outdoor air during economizer operation to prevent overpressurizing the building.The relief air outlet shall be located to avoid
recirculation into the building.Where a single room or space is supplied by multiple air systems, me aggregate capacity of those
systems shall be used in applying this requirement
Exception(s)
- Cooling equipment less than 54.000 Btu/hr.(15.827 W)total cooling capacity.
Requirements Specific To: HVAC System 2 :
1 [503 2.3]The specified heating and/or cooling equipment must meet the following minimum efficiency: Central Furnace(Gas) 80.00
Et(or 78%AFUE)
Project Title: FMC SCHOLLS FERRY Report date: 01/02/13
Data filename G:\Clark Kjos\8541_FMC_Scholls Ferry\Energy Forms■FMC-SCHOLLS.cxl Page 5 of 11
2 [503.2 3]The specified heating and/or cooling equipment must meet the following minimum efficiency Rooftop Package Unit 13 00
SEER
3 [503.2.6]Energy recovery ventilation systems. Individual fan systems that have both a design supply air capacity of 5.000 cfm(2 36
m3/s)or greater and a minimum outside air supply of 70 percent or greater of the design supply air quantity shall have an energy
recovery system that provides a change in the enthalpy of the outdoor air supply of 50 percent or more of the difference between the
outdoor air and return air at design conditions Provision shall be made to bypass or control the energy recovery system to permit
cooling with outdoor air where cooling with outdoor air is required Where a single room or space is supplied by multiple units,the
aggregate supply(cfm)of those units shall be used in applying this requirement
Exception(s)
- Where energy recovery systems are prohibited by the International Mechanical Code.
- Systems serving spaces that are not cooled and are heated to less than 60'F(15.5"C)
- Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy
- Type 1 kitchen exhaust hoods
- Cooling systems in climates with a 1-percent cooling design wet-bulb temperature less than 64F(18C).
- Systems requiring dehumidification that employ senes-style energy recovery cods wrapped around the cooling coil when the
evaporative coil is located upstream of the exhaust air stream
- Systems exhausting toxic,flammable. paint exhaust,corrosive fumes,or dust.
- Laboratory fume hood systems that include at least one of the following features:
1)Vanable-air-volume hood exhaust and room supply systems that reduce exhaust and makeup air volume to 50 percent or less
of design values during periods of reduced occupancy or system demand
or
2)Vanable-air-volume hood exhaust and room supply systems that reduce exhaust and makeup air volume and/or incorporate a
heat recovery system to precondition makeup air from laboratory exhaust shall meet the following.
A+B'(E/M)=50%
Where:
A= Percentage that the exhaust and makeup air flow rates will be reduced from design conditions
B= Percentage sensible heat recovery effectiveness
E= Exhaust airflow rate through the heat recovery device at design conditions
M =Makeup air flow rate of the system at design conditions,
or
3)Direct makeup(auxiliary)air supply equal to at least 75 percent of the exhaust rate, heated no warmer than 2-F(1 1'C)below
room setpoint,cooled to no cooler than 3-F(1 7'C)above room setpoint.no humidification added.and no simultaneous heating and
cooling used for dehumidification control.
4 [503 3 1]Supply air economizers shall be provided on each cooling system and shall be capable of providing 100-percent outdoor air.
even if additional mechanical cooling is required to meet the cooling load of the building Systems shall provide a means to relieve
excess outdoor air during economizer operation to prevent overpressunzing the building The relief air outlet shall be located to avoid
recirculation into the budding.Where a single room or spaces supplied by multiple air systems the aggregate capacity of those
systems shall be used in applying this requirement
Exception(s):
- Cooling equipment less than 54.000 Btu/hr (15,827 W)total cooling capacity.
Requirements Specific To: Water Heater 1 :
1 [504 2]Service water heating equipment meets minimum efficiency requirements. Gas Storage Water Heater efficiency. 80.00%Et
(198 SL,kBtu/h)
2 [504.2]Service water-heating equipment performance efficiency Water heating equipment efficiency shall be verified through data
fumished by the manufacturer or through certification under an approved certification program.
3 (504.3]Temperature controls Service water-heating equipment shall be provided with controls to allow a setpoint of 110'F(43'C)for
equipment serving dwelling units and 90'F(32'C)for equipment serving other occupancies. The outlet temperature of lavatories in
public facility rest rooms shall be limited to 110'F(43°C)
4 [504.4]Heat traps Water-heating equipment not supplied with integral heat traps and serving noncirculating systems shall be provided
with heat traps on the supply and discharge piping associated with the equipment.
5 [504.5]Pipe Insulation. For automatic-circulating hot water and externally heated(such as heat trace or impedance heating)systems,
piping shall be insulated with 1 inch(25 mm)of insulation having a conductivity not exceeding 0-27 Btu per inch/h ft2 x'F(1.53 W per
25 mm/m2 x K). The first 8 feet(2438 mm)of piping in noncirculating systems served by equipment without integral heat traps shall be
insulated with 0.5 inch(12.7 mm)of material having a conductivity not exceeding 0.27 Btu per inch/h x ft2 x'F(1.53 W per 25 mm/m2
x K).
6 [504.6]Hot Water System Controls Systems designed to maintain usage temperatures in hot water pipes such as hot water
recirculating systems or heat trace, shall be turned off automatically when the hot water system is not in operational and shall have
Project Title: FMC SCHOLLS FERRY Report date: 01/02/13
Data filename G:\Clark Kjos\8541_FMC_Scholls Ferry\Energy FOrms■FMC-SCHOLLS.cxl Page 6 of 11
demand sensing controls(flow switch in cold water make-up pipe.return water aquastat temperature sensor)that turn off the system
when there is no demand when the system is operational A check valve or similar device shall be located between the circulator pump
and the water heating equipment to prevent water from Rowing backwards though the recirculation loop
Exception(s)
- Where public health standards require 24 hours per day operation of pumps for uses such as swimming pools,spas and hospitals.
- Service water heating systems used to provide multiple functions(e g..space heating and DHW)as part of an integrated system
- Where coupled with water heating capacity less than 100 ketu/h(29 kW).
Generic Requirements: Must be met by all systems to which the requirement is applicable:
1 [503 2 1]Calculation of heating and cooling loads Design loads shall be determined in accordance with the procedures described in
the ASHRAE/ACCA Standard 183 Heating and cooling loads shall be adjusted to account for load reductions that are achieved when
energy recovery systems are utilized in the HVAC system in accordance with the ASHRAE HVAC Systems and Equipment Handbook.
Alternatively,design loads shall be determined by an approved equivalent computation procedure
2 [503 2 1 1]Packaged Electric Equipment Forced air unit or packaged electric equipment with a total heating capacity greater than
20.000 Btu/h has a heat pump as the primary heating source
Exception(s)_
- Unstaffed equipment shelters or cabinets used solely for personal wireless service facilities.
- Requirement is not applicable.
3 (503 2.2]Equipment and system sizing, Heating and cooling equipment and systems capacity shall not exceed the loads calculated
in accordance with Section 503 2 1 A single piece of equipment providing both heating and cooling must satisfy this provision for one
function with the capacity for the other function as small as possible,within available equipment options.
Exception(s):
- Required standby equipment and systems provided with controls and devices that allow such systems or equipment to operate
automatically only when the primary equipment is not operating
- Multiple units of the same equipment type with combined capacities exceeding the design load and provided with controls that have
the capability to sequence the operation of each unit based on load.
4 (503 2 3]HVAC Equipment Performance Requirements. Reported efficiencies must be tested and rated in accordance with the
applicable test procedure The efficiency shall be venfied through certification under an approved certification program or,if no
certification program exists,the equipment efficiency ratings shall be supported by data furnished by the manufacturer Where multiple
rating conditions or performance requirements are provided,the equipment shall satisfy all stated requirements.Where components,
such as indoor or outdoor coils,from different manufacturers are used,calculations and supporting data shall be furnished by the
designer that demonstrates that the combined efficiency of the specified components meets the requirements herein
5 (503 2 4 1]Thermostatic Controls The supply of heating and cooling energy to each zone shall be controlled by individual thermostatic
controls that respond to temperature within the zone.
6. (503.2.4 1.1]Heat pump supplementary heat. Heat pumps having supplementary electric resistance heat shall have controls that,
except during defrost,prevent supplementary heat operation when the heat pump can meet the heating load.
7. (503.2.4.2]Set point overlap restriction.Where used to control both heating and cooling,zone thermostatic controls shall provide a
temperature range or deadband of at least 5'F(2.8°C)within which the supply of heating and cooling energy to the zone is capable of
being shut off or reduced to a minimum.
Exception(s):
- Thermostats requiring manual change over between heating and cooling modes.
8. [503 2.4.3]Optimum Start Controls. Each HVAC system shall have controls that vary the start-up time of the system to just meet the
temperature set point at time of occupancy
9 [503 2.4.4]Off-hour controls. Each zone shall be provided with thermostatic setback controls that are controlled by either an automatic
time clock or programmable control system. Thermostatic setback controls shall have the capability to set back or temporarily operate
the system to maintain zone temperatures down to 55'F(13'C)or up to 85'F(29'C).Automatic time clock or programmable controls
shall be capable of starting and stopping the system for seven different daily schedules per week and retaining their programming and
time setting during a loss of power for at least 10 hours.Additionally,the controls shall have a manual override that allows temporary
operation of the system for up to 2 hours:a manually operated timer capable of being adjusted to operate the system for up to 2 hours;
or an occupancy sensor
Exception(s)
- Zones that will be operated continuously.
- Zones with a full HVAC load demand not exceeding 6.800 Btu/h(2 kW)and having a readily accessible manual shutoff switch.
Project Title: FMC SCHOLLS FERRY Report date: 01/02/13
Data filename:G:\Ctark Kjos■8541_FMC_Scholls Ferry\Energy FOrms1FMC-SCHOLLS cxl Page 7 of 11
10 (503 2 4 5]Shutoff damper controls Both outdoor air supply and exhaust shall be equipped with not less than Class I motorized
dampers with a maximum leakage rate of 4 cfm per square foot(6 8 Us-C m2)at 1 0 inch water gauge(w g.)(1250 Pa)when tested
in accordance with AMCA 500D,that will automatically shut when the systems or spaces served are not in use
Exception(s).
- Gravity dampers shall be permitted for outside air intake or exhaust airflows of 300 cfm(0.14 m3/s)or less.
11 [503 2.4.6]Freeze Protection and Snow melt system controls Freeze protection systems,such as heat tracing of outdoor piping and
heat exchangers,including self-regulating heat tracing,shall include automatic controls capable of shutting off the systems when
outdoor air temperatures are above 40F or when the conditions of the protected fluid will prevent freezing.Snow-and ice-melting
systems, supplied through energy service to the building,shall include automatic controls capable of shutting off the system when the
pavement temperature is above 50F(10C)and no precipitation is falling and an automatic or manual control that will allow shutoff when
the outdoor temperature is above 40F(4C)so that the potential for snow or ice accumulation is negligible
12. [503.2.4.8]Separate air distribution systems. Zones with special process temperature requirements and/or humidity requirements
shall be served by separate air distribution systems from those serving zones requiring only comfort conditions.or shall include
supplementary control provisions so that the primary systems may be specifically controlled for comfort purposes only
Exception(s)
- Zones requiring only comfort heating or comfort cooling that are served by a system pnmanly used for process temperature and
humidity control provided that
1)The total supply air to those comfort zones is no more than 25 percent of the total system supply air,
or
2)The total conditioned floor area of the zones is less than 1.000 square feet(90 m2)
13 [503.2.4.9]Humidity control. If a system is equipped with a means to add or remove moisture to maintain specific humidity levels in a
zone or zones,a humidity control device shall be provided
14. [503 2.4.9.1]Humidity control.Where a humidity control device exists it shall be set to prevent the use of fossil fuel or electncity to
produce relative humidity in excess of 30 percent Where a humidity control device is used for dehumidification,it shall be set to
prevent the use of fossil fuel or electricity to reduce relative humidity below 60 percent
Exception(s)
- Hospitals, process needs,archives,museums,critical equipment,and other non-comfort situations with specific humidity
requirements outside this range
15 [503 2 4 9 2]Humidity control Where a humidity control device exists it shall be set to maintain a deadband of at least 10%relative
humidity where no active humidification or dehumidification takes place
Exception(s).
Heating for dehumidification is provided with heat recovery or heat pumping and the mechanical cooling system efficiency is 10
percent higher than required in section 503.2.3, HVAC equipment performance requirements
16 [503 2 5]Ventilation.Ventilation,either natural or mechanical,shall be provided in accordance with Chapter 4 of the International
Mechanical Code.Where mechanical ventilation is provided,the system shall provide the capability to reduce the outdoor air supply to
the minimum required by Chapter 4 of the International Mechanical Code
17 (503 2.5 1]Demand controlled ventilation(DCV) DCV is required for spaces larger than 500 ft2 for simple systems and spaces
larger than 150 ft2 for multiple zone systems and with an average occupant load of 25 people or more per 1000 ft2 of floor area(as
established in Table 403 3 of the International Mechanical Code)and served by systems with one or more of the following.
1 An air-side economizer.
2.Automatic modulating control of the outdoor air damper.or
3.A design outdoor airflow greater than 3,000 cfm
Exception(s)
- Systems with energy recovery complying with Section 503 2 6
- Spaces less than 750 ft2(69 7 m2)where an occupancy sensor turns the fan off,closes the ventilation damper,or closes the zone
damper when the space is unoccupied.
18. [503.2.5.2]Kitchen hoods Kitchen makeup air shall be provided as required by the Oregon Mechanical Specialty Code For each
kitchen with a total exhaust capacity greater than 5,000 cfm(2360 Us), 50 percent of the required makeup air shall be(a)unheated or
heated to no more than 60'F(15.55`C).and(b)uncooled or evaporatively cooled. Each kitchen with a total exhaust capacity greater
than 5,000 cfm shall be equipped with a demand ventilation system on at least 75 percent of the exhaust and makeup air Such
systems shall be equipped with automatic controls that reduce airflow in response to cooking appliance operation.
Exception(s).
- Where hoods are used to exhaust ventilation air that would otherwise be exhausted by other fan systems Air transferred from
spaces served by other fan systems may not be used if those systems are required to meet either Sections 503 2.5 1 or 503 2 6.
Occupancy schedule of HVAC system supplying transfer air shall be similar to kitchen exhaust hood operating schedule
Project Title. FMC SCHOLLS FERRY Report date. 01/02/13
Data filename. G.\Clark K)os18541_FMC_Scholls Ferry\Energy Forms■FMC-SCHOLLS cxl Page 8 of 11
- Kitchen exhaust systems that include exhaust air energy recovery complying with section 503 2.6
19. [503-2.5.3]Enclosed parking garage ventilation controls. In Group S-2.enclosed parking garages used for storing or handling
automobiles operating under their own power having ventilation exhaust rates 30,000 cfm and greater shall employ automatic carbon
monoxide sensing devices These devices shall modulate the ventilation system to maintain a maximum average concentration of
carbon monoxide of 50 parts per million during any 8-hour penod,with a maximum concentration not greater than 200 parts per million
for a period not exceeding 1 hour. The system shall be capable of producing a ventilation rate of 1.5 cfm per square foot(0 0076 m3/s-
m2)of floor area Failure of such devices shall cause the exhaust fans to operate in the ON position.
20. [503.2.7]Duct and plenum insulation and sealing.All supply and return air ducts and plenums shall be insulated with a minimum of R-5
insulation when located in unconditioned spaces and a minimum of R-8 insulation when located outside the building.When located
within a building envelope assembly,the duct or plenum shall be separated from the building extenor or unconditioned or exempt
spaces by a minimum of R-8 insulation.All ducts,air handlers and filter boxes shall be sealed.Joints and seams shall comply with
Section 603 9 of the International Mechanical Code.
Exception(s):
- When located within equipment.
- When the design temperature difference between the interior and exterior of the duct or plenum does not exceed 15'F(8'C).
21. (503.2 7.1.1]Low-pressure duct systems.All longitudinal and transverse joints, seams and connections of supply and return ducts
operating at a static pressure less than or equal to 2 inches w.g.(500 Pa)shall be securely fastened and sealed with welds,gaskets,
mastics(adhesives),mastic-plus-embedded-fabric systems or tapes installed in accordance with the manufacturer's installation
instructions. Pressure classifications specific to the duct system shall be clearly indicated on the construction documents in accordance
with the International Mechanical Code. Documentation shall be furnished by the designer demonstrating that representative sections
totaling at least 25 percent of the duct area have been tested and that all tested sections meet the requirements of this section.
Exception(s):
- Continuously welded and locking-type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g.
(500 Pa)pressure classification.
22. (503.2.7.1.2]Medium-pressure duct systems.All ducts and plenums designed to operate at a static pressure greater than 2 inches
w.g.(500 Pa)but less than 3 inches w.g.(750 Pa)shall be insulated and sealed in accordance with Section 503.2.7 Pressure
classifications specific to the duct system shall be clearly indicated on the construction documents in accordance with the International
Mechanical Code. Documentation shall be furnished by the designer demonstrating that representative sections totaling at least 25
percent of the duct area have been tested and that all tested sections meet the requirements of this section
23. (503.2.7.1.3]High-pressure duct systems.Ducts designed to operate at static pressures in excess of 3 inches w g.(746 Pa)shall be
• insulated and sealed in accordance with Section 503.2.7.In addition,ducts and plenums shall be leak-tested in accordance with the
SMACNA HVAC Air Duct Leakage Test Manual with the rate of air leakage(CL)less than or equal to 6.0 as determined in accordance
with Equation 5-2. Documentation shall be furnished by the designer demonstrating that representative sections totaling at least 25
percent of the duct area have been tested and that all tested sections meet the requirements of this section
CL=F x PA(0.65)(Equation 5-2)
where:
F=The measured leakage rate in cfm per 100 square feet of duct surface
P=The static pressure of the test.
24 [503.2.9.1]Air system balancing.Each supply air outlet and zone terminal device shall be equipped with means for air balancing in
accordance with the requirements of Chapter 6 of the International Mechanical Code(IMC 603.17) Discharge dampers intended to
modulate airflow are prohibited on constant volume fans and vanable volume fans with motors 10 horsepower(hp)(7 5 kW)and larger.
25 [503 2 9 3]Manuals. The construction documents shall require that an operating and maintenance manual be provided to the building
owner by the mechanical contractor.The manual shall include,at least,the following:
1 Equipment capacity(input and output)and required maintenance actions
2 Equipment operation and maintenance manuals.
3. HVAC system control maintenance and calibration information,including wiring diagrams,schematics,and control sequence
descriptions. Desired or field-determined setpoints shall be permanently recorded on control drawings.at control devices or, for digital
control systems,in programming comments.
4.A complete wntten narrative of how each system is intended to operate.
26. (503.2.10]Air System Design and Control.Each HVAC system having a total fan system motor nameplate horsepower(hp)exceeding
5 horsepower(hp)(3.7 kW)shall meet the provisions of Sections 503.2.10.1 through 503.2.10 2
27. (503.2.10.1]Allowable fan floor horsepower.Each HVAC system at fan system design conditions shall not exceed the allowable fan
system motor nameplate hp(Option 1)or fan system bhp(Option 2)as shown in Table 503.2.10.1(1) This includes supply fans, return/
relief fans,and fan-powered terminal units associated with systems providing heating or cooling capability
Project Title: FMC SCHOLLS FERRY Report date:01/02/13
Data filename:GAClark Kjosg6541_FMC_Scholls Ferry\Energy Forms\FMC-SCHOLLS.cxl Page 9 of 11
Table 503.2.10.1(1)
Fan Power Limitation LIMIT CONSTANT VOLUME VARIABLE VOLUME
Option 1: Fan system motor nameplate hp Allowable nameplate motor hp hp<CFMS'0 0011 hp<CFMS'0 0015
Option 2: Fan system bhp Allowable fan system bhp bhp<CFMS'0.00094+A bhp<CFMS'0 0013+
A
where
CFMS=The maximum design supply airflow rate to conditioned spaces served by the system in cubic feet per minute.
hp=The maximum combined motor nameplate horsepower
Bhp=The maximum combined fan brake horsepower
A=Sum of[PD xCFMD/41311
where
PO= Each applicable pressure drop adjustment from Table 503 2 10 1(2)in.w c
Table 503 2.10.1(2)
Fan Power Limitation Pressure Drop Adjustment Credits
Fully ducted return and/or exhaust air systems=0.5 in w c
Return and/or exhaust airflow control devices=0 5 in w c
Exhaust filters. scrubbers or other exhaust treatment=pressure drop of device calculated at fan system design condition
Particulate filtration credit MERV 9 thru 12=0.5 in w.c.
Particulate filtration credit: MERV 13 thru 15=0.9 in w c
Particulate filtration credit: MERV 16 and greater and electronically
Enhanced filters=Pressure drop calculated at 2x clean filter pressure drop at fan system design condition
Carbon and other gas-phase air cleaners=Clean filter pressure drop at fan system design condition
Heat recovery device=Pressure drop of device at fan system design condition
Evaporative humidifier/cooler in series with another cooling coil=Pressure drop of device at fan system design conditions
Sound attenuation section=0.15 in w.c.
Exhaust system serving fume hoods=0 35 in w c
Laboratory and vivarium exhaust systems in high-rise buildings=0.25 in.w.c./100 ft of vertical duct exceeding 75 feet
Exception(s)
- Hospital and laboratory systems that utilize flow control devices on exhaust and/or return to maintain space pressure relationships
necessary for occupant health and safety or environmental control shall be permitted to use vanable volume fan power limitation
- Individual exhaust fans with motor nameplate horsepower of 1 hp(0 7 kW)Of less.
28 [503 2.10 2]Motor nameplate horsepower For each fan,the selected fan motor shall be no larger than the first available motor size
greater than the brake horsepower(bhp) The fan brake horsepower(bhp)shall be indicated on the design documents to allow for
compliance venfication by the code official.
Exception(s).
- For fans less than 6 bhp,where the first available motor larger than the brake horsepower has a nameplate rating within 50 percent
of the bhp, selection of the next larger nameplate motor sizes allowed.
- For fans 6 bhp and larger.where the first available motor larger than the bhp has a nameplate rating within 30 percent of the bhp.
selection of the next larger nameplate motor size is allowed
29 (503 2 10 3 1]Large Volume Fan Systems Fan systems over 8,000(7 m3/s)cfm without direct expansion cooling coils that serve
single zones are required to reduce airflow based on space thermostat heating and cooling demand.A two-speed motor or variable
frequency drive shall reduce airflow to a maximum 60 percent of peak airflow or minimum ventilation air requirement as required by
Chapter 4 of the International Mechanical Code.whichever is greater
Exception(s)
- Systems where the function of the supply air is for purposes other than temperature control, such as maintaining specific humidity
levels or supplying an exhaust system
30 [503.2.10 3 2]All air-conditioning equipment and air-handling units with direct expansion cooling and a cooling capacity at ARI
conditions greater than or equal to 110.000 Btu/h that serve single zones shall have their supply fans controlled by two-speed motors
or vanable speed drives At cooling demands less than or equal to 50 percent,the supply fan controls shall be able to reduce the
airflow to no greater than the larger of the following:
1. Two-thirds of the full fan speed,or
2.The volume of outdoor air required to meet the ventilation requirements of ANSI/ASHRAE Standard 62.1-2007.
Exception(s)
- Systems where the function of the supply air is for purposes other than temperature control, such as maintaining specific humidity
levels or supplying an exhaust system
Project Title: FMC SCHOLLS FERRY Report date 01/02/13
Data filename: G.\Clark Kjos\8541_FMC_Scholls Ferry\Energy FormsiiFMC-SCHOLLS cxl Page 10 of 11
31. [503.2.10.41 Senes fan-powered terminal unit fan motors Fan motors for series fan-powered terminal units shall be
electronically-commutated motors and have a minimum motor efficiency of 70 percent when rated in accordance with NEMA Standard
MG 1-2006 at full load rating conditions
32. [503.2.121 Hot Gas Bypass Limitation For cooling systems<=240 kBtu/h,maximum hot gas bypass capacity must be no more than
50%total cooling capacity.
33. All service water heating requirements are listed in requirements section specific to the system
Project Title: FMC SCHOLLS FERRY Report date: 01/02/13
Data filename:G:\Clark Kjos18541_FMC_Scholls Ferry\Energy Forms\FMC-SCHOLLS cxl Page 11 of 11