Loading...
Correspondence _ [Bob ��� System pag� /4/5a �J /C��� id/ ^'~~ /' / ^-^ � From: Bob Poskin To: Mike Miller Date: 8/31/99 2:31PM Subject: BUp 18B0-00382-13O Sprinkler System - Redwood Vista • All units in this subdivision require I 3D Sprinkler Systems- The design factor with two heads flowing require 26 gpm. It is my understanding that a 1" meter will be required, and no additional SDC's will be required. The builder will be required to pay for the upgrade to the 5/8" / 3/4" meter. Bob Poskin • •