Loading...
Correspondence co, F,R e . CONSOLIDATED FIRE AND RESCUE Washington County Fire District No. 1 City of Beaverton erton Fire Department rte; �► 00 Tualatin Fire District FIRE MARSHALS OFFICE • July 26, 1988 Eugene Bingham Dimensional Fabricators, Inc. 9538 S.W. Tigard Tigard, Oregon 97223 RE: Installation Plans for Gas Fired Drying Oven Dimensional Fabricators, Inc. 9538 S.W. Tigard Dear Mr. Bingham: A fire and life safety plan review was conducted on the above captioned project for compliance with the 1985 editions of the. Uniform Building Code (UBC), Uniform Mechanical Code (UMC), and Uniform Fire Code (UFC) as amended by Tualatin Rural Fire Protection District's Ordinance 86 -5. Plans are conditionally approved subject to the following items: 1. Automatic Fire Protection: Automatic fire protection shall be extended to the oven. Please provide this department with not less than 3 sets of plans for review' and approval. • 2. Operation Inspection: Prior to operation of this oven, an inspection shall be made for code compliance installation. 3. Oven Installation: As there was not much detail on the oven itself, I am including pages - 155 and 156 from the UFC relating to industrial baking and drying ovens. A careful review of these items in comparison to the unit being installed is recommended as the Field Inspector will be utilizing these sections to guide him through the installation inspections. Also NFPA Standard 86 covering Safety Features of Industrial Ovens, covers instruction and safety features and. operations. 4. Approved Plans on Job Site: One set of approved plans bearing the stamps of the Tigard Building Department and this office must be maintained on the project site throughout all phases of construction and must be made available to building and fire inspectors for reference during required construction inspections. (UBC Sec. 303) • 4755 S.W. Griffith Drive • P.O. Box 4755 • Beaverton, Oregon 97076 • (503) 526 -2469 • Eugene Bingham July 26, 1988 Page 2 • 5. Inspections Required: Inspection and approval, of construction b}.a representative of this office is required: (a) prior to the cover of any new framing elements following the installation of all utility runs which will be concealed within wall and partition cavities; (b) upon completion of construction and prior to occupancy of the tenant space. (UBC Sec. 305) SPECIAL NOTICE: DEVIATIONS FROM THE SUBMITTED AND HEREBY CONDITIONALLY APPROVED PLANS DURING THE COURSE OF CONSTRUCTION, EXCLUSIVE OF THOSE NECESSARY TO COMPLY WITH FIRE SAFETY REQUIREMENTS AS LISTED HEREIN, ARE PROHIBITED WITHOUT THE WRITTEN AUTHORIZATION OF THE WASHINGTON COUNTY BUILDING, DEPARTMENT AND THIS OFFICE. If I can be of any further assistance to you, please feel free to contact me at 526 -2502. Sincerely, 0 Gene Birchill Deputy Fire Marshal GB:kw cc: Tigard Building Dept./ District Inspectors