Loading...
7367 SW BRIDGEPORT RD : OFFICE COPY MECHANICAL PLAN REVIEW These plans and specifications shall remain available at the construction site. Contactor: goe / Lur /> /) Co. Permit Number 6C-- i /W5 Address: 736? ad ARlit � ie%Ag9 Qf Project Name: aril 7 This plan review checklist shall become fully part of the approved plans and permit. Construction and installation shall comply with all applicable codes and conform to the approved plans. Changes in design shall be submitted and approved by the Building Division prior to work being performed. This plan is approved for construction and is based on the validity stated in OMSC Sec. 106.4.2. Electrical is not included. 1) Provide completed mechanical energy forms as required by the State of Oregon Department of 1 Energy. http: / /www.oregon.gov/ENERGY/ CONS / Codes /docs/HVACFormsPrintedv2.3.pdf 2) Provide engineering and structural details with seal and signature for all RTU's weighing greater than 400 pounds. All other RTU's require an engineers written approval for any additional weight to any roof system. OSSC 1621 with ref. ASCE 7. a) Details shall include the roof penetration with seismic attachment for all RTU to the curb and the curb to the roof. l a 'rovide an isometric drawing for all gas piping. Provide details for all roof top gas pipe support and oof penetrations as per OSSC 1621 and OMSC 305. Provide all other gas pipe support as per Table C415.1. 4) Provide the roof manufacturers specifications for sealing all roof penetrations. OSSC 1507 and OMSC 302.1 5) Provide roof covering protection from dripping condensate drains or, provide roof covering manufacturers written information allowing condensate drains to drip directly on the roof covering. OMSC 1507 6) Provide gas vent termination as per OMSC C503.6.6. Terminations shall be 8 ft. away from all parapets and vertical surfaces or 2 ft. taller than any vertical surface with -in 8 ft. For direct -vent, integral vent and mechanical draft systems provide vent terminations as per OMSC 804. For hazardous exhaust vent terminations provide vent terminations as per OMSC 502.7.2.6.