April 29, 2003 CITY OF TIGARD
•
OREGON
Ron Estey
12670 SW 68 Parkway, Suite 200
•
Tigard, OR 97223
RE: Plan review of conversions and additions.
Dear Ron,
I have completed the plan review of the 15 units that have been or are to be
converted to additional space options or have been altered for increased living
• space.
I personally reviewed the pictures provided by your site superintendent for
building #4, and found that the 24" X 24" X 12" pad under the point load
transferred down through the inside bathroom wall was not installed.
You will have to arrange for a 2" core drill at that area to check for adequate
bearing for this load at lots 7, 9, 59, 60, 61, 62, and 63. Or, you might contact
your engineer to address the footing pad issue.
Lot 24 was approved and lots 2, 3, 4, and 5 have not been poured.
Lot 19 has been revised to reflect storage space in lieu of the original bedroom.
The bay was also credited and the added "niche" was recorded. Do insure that
there are no headers or jambs at the "niche" so in no way can it appear to be a
closet.
Lots 7, 9, 59, 60, 61, 62, and 63 have been flagged "no further inspections" until
the testing or design is complete for bearing pads and /or shear walls.
If you have questions, please call me at 503 - 718 -2440.
Sincerely,
MN r
Darrel "Hap" Watkins
Inspection Supervisor