Loading...
Permit • CITY OF TIGARD BUILDING PERMIT 8 . COMMUNITY DEVELOPMENT Permit #: BUP2013 00030 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 02/06/2013 Parcel: 1S1260000300 Jurisdiction: Tigard Site address: 9585 SW WASHINGTON SQUARE RD Y04 Project: Brow Studio Kiosk Subdivision:VASHINGTON SQUARE ESTATES NO. Lot: S Project Description: Unload and assemble cabinets for Kiosk. Electrical is plug and play • Contractor: DIRTY WORK Owner: PPR WASHINGTON SQUARE LLC 12369 S NEW ERA RD PO BOX 847 OREGON ,CITY, OR 97045 CARLSBAD, CA 92018 • PHONE: 503 - 720 -7558 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB Permit Fee - Additions, Alterations, 02/06/2013 $66.83 • Demolition Occupancy Grp: M Occupancy Load: 12% State Surcharge - Building 02/06/2013 $8.02 Dwelling Units: 0 Plan Review 02/06/2013 $43.44 • Stories: 1 Height: 0 ft Plan Review - Fire Life Safety 02/06/2013 $26.73 Bedrooms: 0 Bathrooms: 0 Info Process /Archiving - Sm $0.50 (up to 02/06/2013 $12.50 Value: $880 11x17) • Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $157.52 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are fort in OAR 952- 001 -0010 through OAR 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1 • :7 or 1.800.332.2 • • .� J � Issued By: k. 4 6 1 .4. 4_12_ Permittee Signature: .010, Call 503.639.4175 by 7:00 a.m. for the next availa; -. pection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial ,lt OFFICE USE ONL1' City of Tigard RECEIVE pa L9 / rt Permit No.: j' ' (3 3) ° 13125 SW Hall Blvd., Tigard, OR 97223 6 r► II . Phone: 503.718.2439 Fax: 503.598.1960 FEB 6 Z 013 Date/g ; Plan Review /�.��Eirtira Other Permit: TI G A It D Inspection Line: 503.639 CITY ] n Date Rea y : y. t ® See Page 2 for Internet: www.tigard- or.gov CI 1 1 / OF (�[ TIGARD Notified/Method: t� ( ( p f . Supplemental Information BUILDING DIVISION TYPE OF WORK . REQUIRED DATA: I. AND 2- FAMILY DWELLING New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ❑ Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application Valuation: $ 45,,e9 3r r� � ❑ I -and 2- family dwelling El Commercial/industrial ❑ Accessory building ❑ Multi- family Number of bedrooms: ❑ Master builder ❑der: ,2,p, /r/ /v -z_ Number of bathrooms: ` ' JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 5 Sr A / leJ� New dwelling area: —square feet City / State/ZIP: 7 4 -1 G ,�a 0 J q , ZZ 5 Garage/carport area: square feet Suite/bldg. /apt. no.: # Vo Project name: F>rU w S• du 7 / r / a Covered porch area: square feet Cross street/directions to job site: Al eck area: square feet 11 .,---/ - c L r S t^ e.-' 1 �' 1 G' p f Y1 eow (Oct l Ad Other structure area: square feet S • ms' 4 (4 REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: Lot no.: Permit fees' are based on the value of the work performed. Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the i ,; y - >_.; ,' L/ • - DESCRIPTION OF WORK work indicated on this application. d 1/ In. ry10 v, d -� Ifs 6,-1-, (P (4 ii.- •k i 0 -'-- k S �i • Valuation: $ wed --- 71.. r 4 v, t • p , c f j 5 . 7 / P/0.7 Existing building area: square feet l New building area: 1 S () square feet r. ` _ . , � ❑ : PROPERTY OWNER 0 TENANT Number of stories: Name: Type of construction: Address: Occupancy groups: City / State/ZIP: Existing: Phone: ( ) Fax: ( ) New: ''. ;,, ,` '' • APPLICANT / CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) ' Business name: ID r r •� 1"/ O v - Struc tural plan review fee (or deposit): Contact name: ( ., y ( \ 5 G pa. Address: 1 Z 3 6,9 t- S , l� l v w E,r,� FI-S plan review fee (if applicable): ` �1 Total fees due upon application: City /State/ZIP: C r.,e_c � C t o_.. \r-z 0 5 7 Phone: (56) 7 �Q 7 S S 7 Fax: : ( ) Amount received: E -mail: PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* C� if'1 w v W 0 Ka t, ; C t r , � t . , • Commercial and residential prescriptive installation of `-.; , CONTRACTOR , roof -top mounted PhotoVoltaic Solar Panel System. Business name: 1 �, fC,� Submit two (2) sets of roof plan with connection details / and fire department access, along with the 2010 Oregon Address: l ` ... /1 eti.i .4 ",2,_ Solar Installation Specialty Code checklist. City / State/ZIP:/ Pte. C OIL G 7 at/ Permit fee (includes plan review � 2_,C) $180.00 Phone: () 7 and administrative fees 5 S -F ax: ( ) / State surcharge (12% of permit fee): $21.60 CCB Iic.: • o Total fee due upon application: $201.60 ..011111� Authorized signature: — 4 0110 This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: 6lti y // - " S ° Date: Z — y -- / 3 • Fee methodology set by Tri- County Building Industry `„ ( ( Service Board. IABuilding\Permits\BUP -COM PermitApp.doc 0224/2011 440- 4613T(I 1 /02/COM/WEB) MACERICH L .'",', RECEIVE® ti FEB 6 2013 January 29, 2013 CITY OF TIGARD BUILDING DIVISION NBI 8520 Wellsford Place Sante Fe Springs, CA 90670 Re: Brow Studio 7 @ Washington Square We have conducted our review of the construction drawings referenced with the following comments: - Recess the chemetal part of the sign so there's no exposed corner, typ of all signs Not all of my comments will require modifications to the drawings; however, all of the language should, at a minimum, be added to the general / landlord notes on the drawings. These drawings are marked `Approved as Noted'. Please a copy of these Landlord stamped plans available to the installer who must have them on -site during installation. Let me know if there are any questions. Sincerely, 4 �2—' Aaron Pratt Senior Manager, Tenant Coordination 602- 953 -6 75 0 direct 11411 N. Tatum Boulevard Phoenix, AZ 85028 P: 602.953.6200 I F: 602.953.6449 www.macerich.com pry' +. !� r, f '7'',. i :" 4 e � f 4 a r , .t� r .r , s1"-y[ -, . yam " ii s. k ) 4 sciK - 4¢ - t �i�icr � :�. ;G; .:41 -. .'1-A . . C. t. .11241", si l •r, ' ?e a ' j� �..,11 r -C n: a l..� G•}`DF .,Y� 1•:M � , litr ,; -,x_ F EB 6 2013 1 1 11 111 N ° Building Division C ITY OF TIGARD Accessibility: Barrier Removal Improvement a ��G DI TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, • telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty -five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains: and, $ (g) When possible, additional accessible elements such as storage and alarms: $ TOTAL (shall equal line [2] of Valuation Computation): $ 1: \Building \Permits \BUP -COM PcrmitApp.doc 03 /03/2011 I Building Division ° Development Code Provision Review - - - - T I c A R D Commercial Projects - No Associated Land Use Case 0 Building Permit No: &t P xi 3 _. 600D 2 Expedited Review Project Name: ?'Z 5Ohrt-f,tf%e? 7 Site Address: 9'S ��-� GI)AC ` ) , Suite /Bldg #: Plan Submittal Date: °' r r-- To the Applicant: > If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application. Building Permit Technicians (503) 718 -2439. • If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section. 7 Staff: please check items along left only if approved. /, Planning Review (contact C I at 503 -718 t / 1 " or "` @tigard-or.gov) • Proposal: _ . _�iG�/ � (O \ ' IS Zoning tom, — Permitted Use Yes [ No ❑ — / Land Use Required:. Yes ❑ No l�' Notes: j 4 /V-& riA) 444 vt, ,,,.4,44.-e. ,....._ (,..--,? Approved ❑ Not Approved Date: I: \CURPLN\Masters\Development Code Provision RevielAkNo Land Use Comm.doc REVISED 10/4/12 Building Division Over- The - Counter (OTC) Building Permit TIGARD Check List Project Description: 64P O (3 -0 3 v APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION *Class of Work: -(' Occupancy Group: IAA Type of Construction: 21'3 *Type of Use: �ay(k Occupancy Load: Oregon Specialty Code: 26(a SPECIFICS Number of Stories: Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT - SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback — Left Sideyard Setback — Front Sideyard Setback — Right Sideyard Setback — Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access. Parking Spaces: REQUIRED ITEMS Fire Sprinklers: Fire Alarms: Smoke Detectors: Parapet: Manual Pull Stations: Protected Corridors: Total Project Valuation: $ 8 e I FEES DUE $ DC Prov Rvw, COM TI — Ping $ DC Prov Rvw, COM TI — LRP DC Provision Review Fee for COM TI $ f &c-Z,?.., Permit Fee — Add, Alt, Demo Project Valuation Planning LRP $ , ©Z_ 12% State Surcharge Up to $4,999 $0.00 $0.00 $ , 4 Plan Review, Structural $5,000 - $74,999 $67.00 $10.00 $ '26 ,'73 Plan Review, Fire Life Safety $75,000 - $149,999 $167.00 $25.00 $ Info Proc /Arch, Lg (over 11x17 $2.00) $150,000 and over $268.00 $39.00 $ ( 2.,'.3 Info Proc /Arch, Sm (up to 11x17 $0.50) $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee Planning Staff: $ Hourly Rate State Surcharge $ Misc. Admin Fee Permit Coordinator: $ Other: $ Other: Building Staff: $ Other: Date /Time: $ 1'7 7 TOTAL FEES DUE *OPTIONS: TYPE OF USE: COM = commercial; CMS = commercial manufactured structure. CLASS OF WORK ACS = accessory; ADD = addition; ALT = alteration; FND = foundation; DEM = demo; FND = foundation; FPS = fire protection system; NEW = new; OTR = other (use for fences, decks, retaining walls, signs, awnings or canopies); REP = repair. l: \ Building \Forms \OTC- BUP.docx 07/01/2012