Permit _ . �� � -- --
,
. • � " �/
` • �BUILDING PERMIT
� ~�
CITY � � � � PERMJT #....... : BUP95-@318 � � � NL�� � ����mr ������� DATE ISSUED: 01/17/96
^
` TY DEVELOPMENT DEPARTMENT
� ��o�uow * �/�m�n�
� m�.o� �
Oregon (503)13(503)1339-4171 � PARCEL: 2S110DC-00100
SITE ADDRESS...: 15570 SW PACIFIC HWY
SUBDIVISION...-: WILLOW BROOK FARM ZONING:C-G
BLOCK. ^ LOT ^11
____ _ _____ ____________ __
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION-
CLASS OF WORK.: , FIRST....: 54142 sf N: S: E: W:
. .
TYPE OF USE.-. :COM SECOND...: 0 sf PROTECT OPENINGS?-- --
� TYPE OF CONST.:3N ' ' � ...: 0 sf N: S: E: W:
OCCUPANCY GRP.:B2 TOTAL------: 54142 sf ROOF CONST: FIRE RET?:
OCCUPANCY LOAD: 0 BASEMENT.: 0 sf AREA SEP. RATED:
STOP.: 1 HT: @ ft GARAGE...: 0 sf OCCU SEP. RATED:
BSMT?: MEZZ?: REOD SETBACKS--- REQURED-------------------
FLOOR LOAD ^ 0 psf LEFT: 0 ft RGHT: 0 ft FIR SPKL:Y SMOK DET..:N ,
. DWELLING UNITS: 0 FRNT:- 0 ft REAR: 0 ft FIR ALRM:Y HNDICP ACC:Y
BEDRMS: 0 BATHS: 0 IMP SURFACE: 0 PRO CORR:N PARKING: 0
VALUE.$: 39935
Remarks: Sprinkler permit for 54,142 sq. ft. grocery store.
Owner: - - - - FEES -- -------
STERLING DEVELOPMENT CORPORATION type amount by date recpt
LA JOLLA CORPORATE „CENTER FIRE $ 95.20 JD 11/13/95 95-272763
� 3252 HOLIDAY COURT, SUITE`225 PRMT $ 238.00 JSD 01/17/96 96-274973
LA JOLLA CA 92037 5PCT $ 11'90 JSD 01/17/96 96-274973
Phone #: 619-546-8841
.
�.
Contractor: - —
GRINNELL FIRE PROTECTION . ' .
GRJNNELL CORP -
2870 NW 29TH AVE '
PORTLAND OR 97210 ' ---- - -
Phone #: 503-223-1525 ' $ 345'10 TOTAL
'Reg ..� 063205 '
#
REQUIRED INSPECTIONS -7------ ., . �
This permit is issued subject to the r»golatime contained in the Sprinkler Unders _- -___
Tipard Municipal Code, State of Ore. Specialty Codes and all other Sprinkler 'Rough- __ / ____. _
applicable laws. Fill work will be done in accordance with Sprinkler Final )
^ '-----------.
) approved plans. This permit will expire if work is not started Fire Alarm Insp _ ____ �, _
within 20 days of issuance, or if work is . suspended for more Misc. sc. Inspection .
� ---------------------
� than�\80 days. . Final Inspection ____________ _ ___
.
' ----_-_-
! -
H . .
Permit � --' - � .,
� ���
Issued B '
/ ' _-____' ___-_ _ ___' ___-_---
. .
! ' Call for insr-ction - 639-4175
-
` ^
`
� �
�
.
� � .
'
� .
. �
.
� •
` � ^ / `
. ', ;
Jam' ( rt Iln fj
0 „r1 I I�
PLANCK# Date: I IIl31`7 5
S
/v4 APPLICATIO FOR PERMIT TO INSTALL FIRE SUPPRESSION SYSTEM
BUILDING DIVISION, CITY OF TIGARD
639 -4171
DATE: H /1319 S PERMIT # 6U 11 IS- oEli
Valuation: -� \ �3�.
Amt. Paid: Permit Fee: 3N —
40% Plan Check Fee: q ¶ - '
Balance Due: 5% State Tax: )) .9' v
-7ys. ,° fy-s ° = ;i a 6t 1% `1
Plans must be submitted to the Building Division before installation. Three sets of the plot 0
plan, showing the layout and the location of the nearest hydrant is required.
New Installation: ✓ Addition: Repair: Alteration:
Complete: ✓ Partial: Exitway: Basement: Hood & Vent:
Spray Booth: IN EXISTING BUILDING: IN NEW BUILDING:
NUMBER & STREET: 1 - 6 2 4 - 3 0 P+AU Fl C. k-4\4)” ?
NAME OF BUILDING or BUSINESS: SAFEV1A SroC.0
NO. OF STORIES: I SIZE OF BUILDING: 53K OCCUPIED AS: t4E46
TYPE OF SYSTEMS: Wet: 'I/ Dry: Combination: /
STANDPIPES: OCC.HAZARD: Light ORD.GRP.HAZARD 1_ 2 V 3_ 4 Extra
DENSITY GPM/Ft2 DESIGN AREA i 6 ft2 SPRINKLER AREA 6 100 ' 3 ft2
SPRINKLER ORIFICE SIZE: 6 16 "K" FACTOR l l • 4 TEMP. RATING
OWNER: 7A k I 1 IOC ADDRESS: i (4000 it EJtl,( • (LtO ■tt A of`
(M 1 CONTRACTOR: ��(`i0106LL -1 /
PLANS DRAWN BY: (gIOAE -1-t— F(PE ADDRESS: c. 1� L� • c-V A
REMARKS:
APPROVED permits includes only work described above and /or on plans and specification bearing the same
permit number and will comply with all applicable and ordinances of the City of Tigard.
SPRINKLER COMPANY: C?F(Ih ELL H .E— if. tLT1O3 PHONE: (5dS) - CLIS `(SL5
SIGNATURE OF APPLICANT:
BUILDING DIVISION:
PERMIT VALID FOR 180 DAYS
h; tlogin\dsts \fi reperm
1/21/00 Activities for Case #: BUP95 -00318
4:16:11 PM
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
BUPC007 Application received 11/13/95 B PEND B 11/16/95 Plans received 11/13/95.
BUPCO20 Plan check by 8/8/95 1/8/95 JHF APPR JHF 1/8/96 d
BUPC783 Sprinkler Rough -In 12/20/95 2/27/96 TLP PASS TLP 2/28/96
BUPC784 Sprinkler Final 12/20/95 4/2/96 TLP PASS TLP 4/2/96
BUPC785 Fire Alarm lnsp 3/29/96 3/29/96 TLP PASS TLP 4/2/96
BUPC090 (F) Ready to issue 1/10/96 JSD PASS JD 1/10/96 Need CCB info on Grinnell Fire
Protection
BUPC100 (F) Issue permit 1/17/96 JSD PASS JD 1/17/96
BUPC960 Case Finaled 4/2/96 TLP PASS TLP 4/2/96
•
Page 1 of 1