Permit CITY OF TIGARD • BUILDING PERMIT
•
COMMUNITY DEVELOPMENT Permit #: BUP2012 -00184
TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 01/17/2013
Parcel: 2S113B000600
Jurisdiction: Tigard
Site address: 16580 SW 85TH AVE
Project: Clean Water Services Subdivision: ROSEWOOD ACRE TRACTS Lot: D
Project Description: Modification of the Solids Building odor ductwork and install two new odor control fans. Install two new in- ground
odor control biofilters. Modify the existing outside ductwork. 1/17/13, Issuance for Phase I, interior work only.
4/1/13, release of final phase, exterior work.
Contractor: MCCLURE & SONS INC Owner: CLEAN WATER SERVICES
15714 COUNTRY CLUB DR ATTN: ACCOUNTS PAYABLE
MILL CREEK, WA 98012 2550 SW HILLSBORO HWY
HILLSBORO, OR 97123
PHONE: 425 - 316 -6999 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIB Permit Fee - Additions, Alterations, 01/15/2013 $4,097.12
Demolition
Occupancy Grp: U Occupancy Load: 12% State Surcharge - Building 01/15/2013 $491.65 •
Dwelling Units: 0 Plan Review 10/01/2012 $2,663.13 •
Stories: 0 Height: 0 ft Plan Review - Fire Life Safety 10/01/2012 $1,638.85 - •
Bedrooms: 0 Bathrooms: 0 DC Provision Review, COM TI - Ping 01/15/2013 $256.00
Value: $612,564 DC Provision Review, COM TI - LRP 01/15/2013 $38.00
Info Process /Archiving - Sm $0.50 (up to 01/15/2013 $132.50
11x17)
Floor Areas: Metro Const. Excise Tax - Commercial 01/15/2013 $735.08
Use
Total Area: 0 Erosion Control w /Permit - Ping 01/17/2013 $600.00
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $10,652.33 .
Required: Required Items and Reports (Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952 - 001 -0010 t.. .. f ; R 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issue By: • Permittee
Call 503.639.4175 by 7:00 a.m. for the next available inspe date.
This permit card shall be kept Ina conspicuous place on the Job site until completion of the project.
Approved plans are required on the job site at the time of each Inspection.
'-- Pl - t ti E, 71
IN Building Division
Development Code Provision Review
T I G A R D Commercial Projects with Approved Land Use
Building Permit No.: ft-t-P a() l . — 0. 1
Land Use Casefile No.: l ' &)/ a " 0000 q
Routed Plans: �\ „
Submittal Date: 7 : o� o,1 t 3 22 - 1 6
Submittal Date:
Submittal Date:
To the Applicant:
Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies
to the Building Division. Only checked (✓) items are approved. Items not approved and those listed in the
notes must be revised prior to re- submittal. For questions please contact the appropriate staff person(s) listed '
above each section.
STAFF: please only mark those items on the left side that are approved.
Planning Review (contact 0 41 /4 /d at 503 - 718 - A. Y15 or f'44 �( @tigard - or.gov)
❑ Land Use Approval \1
❑ Building Plans Match Approved Plan: Yes ❑ No ❑
❑ Maximum Building Height
❑ Conditions Met
❑ Street Trees
P Protected Trees t.
Notes: A ge A 4 l/ O • 0/-1
TL Vrt, 4 I( ..h o /lmncn. , v' 4.20/s 0,4- fe c, th.. / r4
Original Plan: Approved % Not Approved ❑ Date: i3 o Z / /.S'
Revision 1: Approved ❑ Not Approved ❑ Date:
Revision 2: Approved ❑ Not Approved ❑ Date:
t
(Review Continues on Page 2)
Page 1 of 2
Engineering Review (contact Mike White at 503 - 718 -2464 or MikeW @tigard - or.gov)
❑ Actual Slope:
❑ PR Permit #
❑ Conditions Met
Notes:
Original Plan: Approved ❑ Not Approved ❑ Date:
Revision 1: Approved ❑ Not Approved s Date:
Revision 2: Approved ❑ Not Approved ❑ Date:
Permit Coordinator Review (contact Albert Shields at 503- 718 -2426 or albert @tigard- or.gov)
❑ Planning Okay to Issue Permit ❑ Arborist Okay to Issue Permit
❑ Engineering Okay to Issue Permit
Notes:
Original Plan: Date Sent to Applicant:
Revision 1: Date Sent to Applicant
Revision 2: Date Sent to Applicant
Okay to Issue Permit: Yes ❑ No ❑
Date Routed to Building:
Page 2 of 2
Debbie Adamski
From: John Floyd
Sent: Tuesday, March 19, 2013 5:44 PM
To: Debbie Adamski
Subject: BUP2012 -00184 / CWS
Attachments: John Floyd.vcf
Hi Debbie,
I've been contacted by CWS about BUP2012- 00184. Back in October we approved this permit under a two phased
approach. I approved Phase I, but could not release Phase II until new code changes were adopted by Council.
Now that the code changes have been adopted, I need to review Phase II for compliance with the new standards and
(hopefully) release the permit. How should this proceed? I believe a permit modification would be the most
straightforward path, and what was previously discussed with mark. Does the applicant need to initiate this in writing,
or can we do this based on a verbal? I understand the fees were paid for the entire project upfront (both phases I and
II).
From the very minimum, I need to receive a set of plans to submit (the file copy would be fine) and the ability to sign off
on the changes in Accella.
More than happy to meet with your or someone else over there given the weird complexity of this case! O
John
John Floyd
City of Tigard
Associate Planner
�I Community Development
s • (503) 718 -2429
johnflgtigard -or.gov
13125 SW Hall Blvd.
TI G A R D Tigard, OR 97223
DISCLAIMER: E -mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail
may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E -mails are retained
by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule."
1
v CITY OF TIGARD BUILDING PERMIT
III :. COMMUNITY DEVELOPMENT Permit #: BUP2012 -00184
TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 01/17/2013
Parcel: 2S113B000600
Jurisdiction: Tigard
Site address: 16580 SW 85TH AVE
Project: Clean Water Services Subdivision: ROSEWOOD ACRE TRACTS Lot: D
Project Description: Modification of the Solids Building odor ductwork and install two new odor control fans. Install two new in- ground
odor control biofilters. Modify the existing outside ductwork.
Contractor: MCCLURE & SONS INC Owner: CLEAN WATER SERVICES
15714 COUNTRY CLUB DR ATTN: ACCOUNTS PAYABLE
MILL CREEK, WA 98012 2550 SW HILLSBORO HWY
HILLSBORO, OR 97123
PHONE: 425 - 316 -6999 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM Permit Fee - Additions, Alterations, 01/15/2013 $4,097.12
Class of Work: ALT Type of Const: IIB Demolition
Occupancy Grp: U Occupancy Load: 12% State Surcharge - Building 01/15/2013 $491.65
Dwelling Units: 0 Plan Review 10/01/2012 $2,663.13
Stories: 0 Height: 0 ft Plan Review - Fire Life Safety 10/01/2012 $1,638.85
Bedrooms: 0 Bathrooms: 0 DC Provision Review, COM TI - Ping 01/15/2013 $256.00
Value: $612,564 DC Provision Review, COM TI - LRP 01/15/2013 $38.00
Info Process /Archiving - Sm $0.50 (up to 01/15/2013 $132.50
11x17)
Floor Areas: Metro Const. Excise Tax - Commercial 01 /15/2013 $735.08
Use
Total Area: 0 Erosion Control w /Permit - Ping 01/17/2013 $600.00
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $10,652.33
Required: Required Items and Reports (Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952- 001 -0010 through OAR 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503 32.1987 or 1.800 332.2344.
Issued By: / Permittee Signature: (' �, ` �_
Call 503.639.4175 by 7:00 a.m. for the next available in •e ion date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Big . • ' - Permit A lication
Commercial ,u V . FOR OFFICE USE ONLY
City of Tigard Received f �
y g r D Date /B 9 Permit No.: v �. w
° 13125 SW Hall Blvd., Tigard, OR 97223' ' / Plan Review , 4
Phone: 503.718.2439 Fax: 503.59$ F� Date/By: l I I / Other Permit:
T I G A R D Inspection Line: 503.639.4175 ( l ` $ GF TIGJ R Date Ready /By: Juris: ® See Page 2 for
Internet: www.tigard- or.gov BUILD (C.1th q Notilicd /Method: I �7� 3 < Supplemental Information
4s, b�P ✓ d 1 U
TYPE OF WORK �� �REQUIRED DATA: 1- AND 2- FAMILY DWELLING
❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed.
Indicate the value (rounded to the nearest dollar) of all
® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1- and 2- family dwelling ® Commercial /industrial Valuation: $
❑ Accessory building ❑ Multi- family Number of bedrooms:
❑ Master builder ❑ Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 16580 SW 85 Avenue New dwelling area: square feet
City /State/ZIP: Tigard/OR 97224 4.0 Dg 7,LD — Garage /carport area: square feet
Suite/bldg. /apt. no.: Project name: Odor Control Phase 1 Covered porch area: square feet
Cross street/directions to job site: 85 & Durham Road Deck area: square feet
Other structure area: square feet
REQUIRED DATA: COMMERCIAL -USE CHECKLIST
Subdivision: I Lot no.: Permit fees* are based on the value of the work performed.
Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all
equipment, materials, labor, overhead, and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Modify the Solids Building Odor ductwork and install two new odor control fans. Valuation: $$612,564.00
Install two new in ground odor control biofilters. Modify the existing outside Existing building area: square feet
duct work. See spec section 01010 -4 for a complete description. New building area: square feet
® PROPERTY OWNER ❑ TENANT Number of stories:
Name: Clean Water Services Type of construction:
•
Address: 16060 SW 85 Avenue Occupancy groups:
City /State/ZIP: Tigard/OR 97224 Existing:
Phone: (503)547 -8177 Fax: ( ) New:
❑ APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES*
Business name: Clean Water Services (Please refer to fee schedule)
Structural plan review fee (or deposit):
Contact name: Joel Borchers
Address: 16060 SW 85 Avenue FLS plan review fee (if applicable):
Total fees due upon application:
City /State /ZIP: Tigard/OR 97224
Phone: (503) 547 -8177 Fax:: ( )
Amount received: 46V � - ?
E -mail: borchersj @cleanwatelservices.org PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Commercial and residential prescriptive installation of
CONTRACTOR roof -top moun -, PhotoVoltaic Solar Panel . tem.
Business name: McClure and Sons Submit two (2) sets • oof plan with co• ection details
and fire department access, :.ng wi the 2010 Oregon
Address: 15714 Country Club Drive Solar Installation Specialty Code - cklist.
City /State /ZIP: Mill Creek/VV P fee (includes pl review
A/98012 $180.00
and adminis • tive fees):
Phone: (425) 316 -6999 Fax: ( )
State surcharge (12% of permit fee): $21.60
CCB lic.: 71127
I Total fee • .e upon application: $201.60
Authorized signature: This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: Joel C. chers Date: 9/27/2012 * Fee methodology set by Tri- County Building Industry
Service Board.
I:'Building\Permits\BUP -COM PermitApp.doc 02/24/2011 440- 46I3T(I I /02/COM/WEB)
,
The Odor Control System Improvements Project is going to be phased. Phase One will deal with work
within the existing building in order to proceed with that work prior to the anticipated city approval on
the Durham WWTD Plan District.
Phase One:
1) Modify the Solids Building interior ductwork
a) G001, G002
b) C100
c) M001, M101, M102, M103, M104, M105, M106
2) Supply and install one new odor control fan (41EF1002)
a) M001, M302
b) E001, E002, E003, E005, E201, E202
c) 1001, 1002, 1101
3) Modify the existing Struvite Facility building (SRF) ductwork and electrical work
a) M301
b) E001, E004, E005, E301
c) 1001, 1002, 1101
4) Supply and install new SRF building ductwork.
a) M302
Phase Two
1) Install two new in ground odor control biofilters, install one new odor control fan (41EF1001), and
modify existing and install new outside ductwork
a) G001, G002
b) C001, C002, C003, C100, C101, C102, C103, C104, C201, C301
c) M001, M106, M201, M202, M203, M204, M205
d) 5001, 5002
e) E001, E103
f) 1001, 1002, 1101
2) Perform other miscellaneous demolition, mechanical, civil and electrical upgrades specified in the
Contract documents.
r
•
Building Division
Development Code Provision Review
/T i c A R Commercial Projects - No Associated Land Use Case
Building Permit No: Ao la- f o 7 ❑ Expedited Review
Plan Submittal Date: 9/A71/ 2'
To the Applicant:
➢ If the proposed use is not permitted within the zone, please contact the Building Division to cancel
the permit application. Building Permit Technicians (503) 718 -2439.
➢ If a land use is required and for all other questions, please contact the staff person listed above the
Planning Review section.
Staff: please check items along left only if approved.
Planning Review (contact F( at 503 - 718- o or v P @ tigard- or.gov)
❑ Zoning 1- / Permitted Use Yes ❑ No X(
❑ Land Use Required: Yes No (explain below)
Notes: Ira ilIfi elifti aultanLallIIA1VEN ...�
k/y (ell 7 S° - 17- caget
/7;
K Approved %I , Not Approved Date: /6 ` f —. (1
Permit Coordinator Review (contact Albert Shields at 503 - 718 -2426 or albert@tigard-or.gov)
Notes:
Routed back to Building Division Date:
I: \CURPLN
Location:
Record Type:
Inspection Type:
Comments:
Inspection Date:
Record ID:
Result:
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
16580 SW 85TH AVE, TIGARD, OR, 97224
Commercial - Building
299 Final inspection
2013-12-31 (null)
BUP2012-00184
PASS - No C of O
Violation Summary:
Inspector Contractor
Location:
Record Type:
Inspection Type:
Comments:
Inspection Date:
Record ID:
Result:
City of Tigard
13125 SW Hal Blvd.
Tigard, OR 97223 Tel: 503.718.2439
16580 SW 85TH AVE, TIGARD, OR, 97224
Commercial - Building
205 Footing
04/22/2013 11:00
BUP2012-00184
PART
Ok to pour with special inspectors approval
Violation Summary:
Inspector Contractor
Bend Office (541)330-9155
Geotechnical Office (503)601-8250
Inc.Carlson Testing, Eugene Office (54])345-0289
Salem Office (503)589-1252
Tigard Office (503)684-3460
Special Inspection
FINAL SUMMARY LETTER RECEIVED
Date: September 26, 2013
Job#: T1308284.A SEP 3 0 2013
City of Tigard
13125 SW Hall Blvd CITY OF TIGARD
Tigard, OR 97223-8199 BUILDING L t SIOP�
Attn. Building Division
Re: Project Name: Durham AWWTP—Odor Control System Improvements (Phase I)—Project No. 6550
Address: 16060 SW 85th Ave—Tigard, OR
Permit#: BUP2012-00184
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the following
item(s) per our inspection reports only:
Reinforced Concrete
All requested inspections and tests were performed and reported according to the requirements of project documents and to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and
applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design
changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects,
deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any
type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's
work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction
documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by
members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not
be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only.
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health,
safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further
questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON ESTIN INC.
4.
teven W. Lea h
Project Manager
SWL/jk
cc: Clean Water Services (Durham)— Randy Naef naefr @cleanwaterservices.org
City of Tigard Building Division
McClure & Sons Inc— Rob Bechtloff rob@mcclures.org
Kennedy/Jenks Consultants—Tyler Anderson tyleranderson@kennedyjenks.com
CH2M Hill Inc (Portland)— Steve Reynolds steven.reynolds@ch2m.com
P:\Projects\General\2013\T1308284A\09-26-13 Final Letter.doc Updated 11/30/11