Report 4 5o sw k cvd q&tio y - 003 °
Construction Inspection. & Related Tests
C l
arson 'Vesting, Inc.
P.O. Box 23814
Special Inspection Tigard, Oregon 97281
Phone (503) 684 -3460
FINAL (503) 684-0954
INAL =MARY REPORT
July 25, 1995
#94 -2050 / 94 -2050A
.
Pacific Reality Associates
15115 SW Sequoia Parkway
Suite 200 -WMI
Portland, OR 97224
Re: Pacific Corporate Center Buildings 240 & 241
Tigard, Oregon
Gentlemen:
This is to certify that the items listed below are in accordance
with Section 306 of the State Building Code, we have performed
random /periodic special inspection at the contractor's request of
the following items per our inspection reports only:
Structural Steel - Field / Bolting
Reinforced Concrete
Roofing
All inspections and tests were performed and reported according to
the requirements of Section 306 and, to the best of our knowledge,
the work was in conformance with the approved plans and
specifications, approved change orders and applicable workmanship
provisions of the State Building Code and Standards, as well as the
structural engineer's design changes and approvals.
Our reports pertain to the material tested /inspected only.
Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do
not hesitate to contact this office.
Respectfully submitted,
CARLSON ,TESTING, INS.
/
Douglas W. Leach
President
mbh
cc: City of Tigard Baugh Construction Co.
Mackenzie /Saito & Associates