Loading...
Report 4 5o sw k cvd q&tio y - 003 ° Construction Inspection. & Related Tests C l arson 'Vesting, Inc. P.O. Box 23814 Special Inspection Tigard, Oregon 97281 Phone (503) 684 -3460 FINAL (503) 684-0954 INAL =MARY REPORT July 25, 1995 #94 -2050 / 94 -2050A . Pacific Reality Associates 15115 SW Sequoia Parkway Suite 200 -WMI Portland, OR 97224 Re: Pacific Corporate Center Buildings 240 & 241 Tigard, Oregon Gentlemen: This is to certify that the items listed below are in accordance with Section 306 of the State Building Code, we have performed random /periodic special inspection at the contractor's request of the following items per our inspection reports only: Structural Steel - Field / Bolting Reinforced Concrete Roofing All inspections and tests were performed and reported according to the requirements of Section 306 and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes and approvals. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON ,TESTING, INS. / Douglas W. Leach President mbh cc: City of Tigard Baugh Construction Co. Mackenzie /Saito & Associates