Loading...
Correspondence Page 1 of 1 a ., Val Henze! - FW: Attachment From: "Beason, Rick" <Rick.Beason@macerich.com> To: <val @tigard- or.gov> Date: 10/26/2006 12:18 PM Subject: FW: Attachment • CC: "Lisa Terlson" <lisa.terlson @deacon.com> • here is what our architect forwarded. Let me know if this works for you and if you still need it in a fax. Thanks again for your above and beyond help this morning. From: Bill [mailto:bill @wpolk.com] . Sent: Thursday, October 26, 2006 11:45 AM To: Beason, Rick Subject: Attachment Rick - The head of the corridor partitions should be secured as follows: • 1. When running parallel to the ribs of the steel deck above, the sheet metal should span three ribs and be secured to each rib at 18" o.c. in a staggered pattern. 2. When running perpendicular to the ribs, secure the sheet metal to the steel deck in a similar pattern at approximately 18" o.c. depending on the location of the ribs. 3. Secure the sheet metal to the steel deck with #10 self tapping screws. • 4. Secure the head track'to the sheet metal at 12" o.c. with drywall screws of a length not longer than the depth of the rib of the steel deck. William M. Polk, F.A.I.A. WILLIAM POLK ASSOCIATES .I* p: (206) 622 . -8443 , • f: (206) 622 -8031 c: (206) 612 -9660 d bill @wpolk.com Virctf ' 1422 0 -1 4,1 y ‘ ' . • file: / /C:\Documents and Settings \val.000\Local Settings \Temp \GW }00002.HTM 10/26/2006