Loading...
Correspondence C' rep* LAtjcilii , CITY OF TIGARD OREGO A/ovemBeg- 5 2.0V / /Kw% )55vk -lf CONvw izi 1/ r'/4-.561MG'To// s4'vq-Rr7 r#45E0 • pa/i'1/T /Vo , 6 7,,,y_ 006,// rgom : X6/iv Ftegie-- y gcc-c7z/c..- /A55EG7 — (...5 ) 718- 2 If /'nv1 iN riE f /EL] 7 iMP - 7/0- z1/yo ore- V e ff -N / C CRS/ } /rvD MO — 7/ S — 2 - 1 /33 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 L 'V 1. Sheet E 1.6 -- As per Phase 1 requirements, second egress door must be added to west side of electric room on upper floor at grid lines GG and 33.2. 2. Sheet E 2.5, Key Note 1 — Conductors must comply with NEC 310.15(B)(2). (More than three current carrying conductors...) 3. Sheets 3.4, 3.5 and 3.6 are the fire alarm system and are not a part of this plan • review. 4. Sheet E 4.1 is part of the south parking structure and is not part of this permit. 5. Sheet E 4.2 — In the details of the elevator machine rooms, the shunt -trip disconnects may not meet the location requirements of the elevator code (handle within 24" of latch side of door). Check with the elevator inspector. 6. Sheet E 4.2, Key Note 7 — Connect the #6 cu to the Grounding Electrode System (see 21 / E5.1) 7. Sheet E 5.1 — I need to see the fault current calculations for each of the services. 8. Sheet E 5.1 — The engineered pick up settings for each GFP main breaker need to be specified. It is vital that this breaker be set to selectively coordinate with the breakers in the downstream circuits so that a relatively minor fault in a 20 amp. branch circuit trips only its branch breaker. Without careful coordination of the tripping characteristics of all the breakers in the circuits, that minor fault could cause the main breaker to trip with the resulting major disruption. We assume that you are handling the selective coordination as part of your electrical engineering work, as it is not a part of our plan review or inspection process. 9. Sheet E 5.1 — Tenant Empty Conduit Size Schedule -- If the tenant feeder breaker sizes are correct in the one line diagrams, then the conduit size of "Spare W-11" should be 2-1/2" and W -13 could be 1-1/4" and "Spare W -16" should be 2-1/2" . 10. Sheet E 6.1 — Details No. 23 and No. 41 — Wiring of control circuits shall comply with NEC 725.55 (separation from power and lighting conductors). 11. Sheet E 6.1 -- Detail No. 23 -- Wiring of generator shall comply with NEC 445.13 (Ampacity of conductors). 12. Sheet E 6.1 -- Detail No. 23 -- The emergency system shall comply with NEC Article 700 (Emergancy Systems). 13. Sheet E 6.1 -- Detail No. 23 -- The grounding electrode for the generator shall also be bonded to the grounding electrode system of the building. (see 21 / E5.1) • 14. Sheet E 6.1 -- Detail No. 44 -- This detail appears to not apply to this project. Please review and either correct the discrepancies or delete the detail. 15. Sheets E 6.2 and E 7.1 -- All luminaries shall comply with Oregon Structural Specialty Code Section 1316. (energy efficiency) 16. Sheets E 6.2 and E 7.1 -- All luminaries shall be certified by an electrical testing agency approved by the State of Oregon. 17. Sheets E 6.2 and E 7.1 -- The mounting of all luminaries shall comply with Oregon Structural Specialty Code section 1632. (seismic loads) 18. Sheets E 6.2 and E 7.1 -- All luminaries weighing more than 50 lbs. (such as PH 1, PH 2, PH 3, PH 4) require mounting detail drawings stamped by a structural engineer. 19. Spec. book -- The panel schedules should be included in the drawings. The spec. book is not a part of the approved plans. • • • MAIN SWITCHBOARD - L • PULL SECTION 4000A 480Y/277V 3 PHASE 4 WIRE 65,000 A.I.C. :-- E T M T C---N SERVICE DISCONNECT1 S ma y. o . o SERVICE POINT 1600A GFP T -10 I I a SERVICE DISCONNECT #2 2500 KVA 1600A GFP I o I I " SERVICE DISCONNECT #3 i 1 0 0 1200A GFP (4) 3'C.°.0 . L i IN L CONDUIT AND e • PRI : BUS BAR BY U . :I s • ..,PER 4 ' #3/0 GEC • — . TO MSB -M f O • ` GROUND I BosID5 7 o ' •Illk 1 oTM R- MBTAt. UFER GROUND PER PIPAiI& PER NEC 250.52(A)(3) - . - B ILDING Zia,( NE-c- 250. Joy COLD ) 3/4' x 10' TEE .9TEE i - of WATER e•OUND RODS 62CIST7N6 ' 8 Fc PIPE T 10' O.C. snwcrV RE o THE& 5 wi-f1 I PR- NEC 2 5 1) ,99 5 " of • SEE N67-E 7- 6g. 2 • EurR ? To 8LD6, EMERGENCY GENERATOR ' 480Y/277V 3PH 4W ' RVICE DIS I ' ' - ' 75KW 0.8PF SHEET ES1.1 R GENERATOR LI ATION BONDING PER - G 100A I LIFE SAFETY ATS SEPARA ' LY DERIVED 100 — E / N 100A 4 POLE SYSTEM -' IR GROUNDING .. # G o00 REQUIREMa` EE DET • IL 23/E6.1 ©— 100 / / PANEL �� X1 V, t > 100 �j� ` \ \ ii "J a V PANEL X2 k MSB -L ONE - LINE DIAGRAM r Electrical Permit Application FOR OFFICE u ONLY Receiv7. Electrical al • Date/Big A. Permit No.: � )0 '1 t2V &f 1 Of Tigard RECEIVED Plannin Appr6val Sign C ty g Date/By: • Permit No.: 13125 SW Hall Blvd. Plan Review Other Tigard, Oregon 97223 SEP 2 7904 Date/By: Permit No.: Phone: 503- 639 -4171 Fax: 503 -598 -1960 Post- Review Land Use ard.or.us� r-..c�. ,D ill _ I I\ Contact Case No.: Internet: www.ci.ti ^l�Y Or �„ - g ■ e.l I Contact lyLt .: ®See Page 2 for 24 -hour Inspection Reques0'. OD6'3 175te, - -" Name/Method: I /4_ Supplemental Information. .. -,. r"AV:e;17 ; ::TYPE 'OF.ORK`::: - J ;..c.:� •. ::. -.._ ._ :;;;1!--::•::;: ':�7'' TITAN: REVIEW (P.lea'seibak"all:th`iit�ap'.' r...x.`, r.71- Wlyew construction ❑ Demolition ❑ Service over 225 amps- ❑ Health-care facility commercial ❑ Hazardous location N Additlo ,n/alteration/replacement _ ❑ Other: ❑ Service over 320 amps- rating of ❑ Building over 10,000 square feet, -. xr;:__.. � .,; s,tAtttsOYtY.Or3CO . . DC :: •.1 '_•,.:..c.::.,! 1 & 2 family dwellings four or more residential units in ❑ 1 & 2- Family dwelling Commercial/Industrial ❑ System over 600 volts nominal one structure ❑ Building over three stories ❑ Feeders, 400 amps or more ❑ Accessory Building ] Multi- Family cupant load over 99 persons ❑ Manufactured structures or RV park ❑ Master Builder Ti Other: gress/lighting plan ❑ Other. . �: Submit _ sets of plans with any of the above. ,,; ,��`:z.....:OB'SI3 E INFORMATIOI!T an�:I�QCiTION'? - =.. - -::. . The above are not applicable to temporary construction service. Job site address: 1%6 1 wAtSlltt.100•1 s to -;;:. _. - -_ _ ; `.;FEE' 0+.: i I _el u �* =.s- le ; -. - Suite #: I Bldg. /Apt. #: Number of inspections per permit allowed Project Name: tAlPeelsk.ADA SQ. MAt,d, - ?Wee 3L Description Qty Fee (w) Total 1 New residential -single or multi - family per Cross street/Directions to job site: dwelling unit. Includes attached garage. WP ttu`� . to Ar Service included: 1000 sq. R or less 145.15 4 O %1(L 1u)ck 0114> G( 6 QCYtb Each additional 500 sq. ft. or portion thereof 33.40 1 Limited energy, residential 75.00 2 Subdivision: I Lot #: Limited energy, non residential 75.00 2 Tax map /parcel #: Each manufactured home or modular dwelling -P `* - -. ;! 41 0RIP.TIDN•OF WORK; r_ ; :f : .?:N1. service and/or feeder 90.90 2 Services or feeders - installation, P9Cmot4 1C.6 ID Ireel2 alteration or relocation: a - ` ' P4 c � • 201 amps or less 7 06.85 2 i 3 .- - 2 rIDPC�iC]t�•• 2oi amps to 400 amps 2 io6.HS 2 i 3.' 2 401 amps to 600 amps 1 160.60 I t.0 .bc 2 _ 6RO ERT: }OV!lE' ' ''. •': iaTIV 'Piz. :;: ',., , "1s ", - .,. :: 601 amps to 1000 amps 240.60 2 • Over 1000 amps or volts (0 454.65 2, 727.90 2 Name: MtICE(24C-lk Co j Reconnect only 66.85 2 Address: LixtbkhaF %JD Suet lc0 Temporary services or feeders - installation, I alteration, or relocation: City / State /Zip: °,,At,tEvN ociNt1 t, CA ' gb`Ipl 200 amps or less 66.85 1 201 amps to 400 amps 100.30 2 Phone: c}zs - eta -o 8oS Fax' ... 401 to 600 amps 133.75 2 AFPJ•IGAN;s ;; . +NTA(.T PERSON:, `• `r' Branch circuits - new, alteration, or Name: "[bCJp 199244/461 extension per panel: A. Fee for branch circuits with purchase of ' Il' 6.65 q 37. 6 J 2 Address: 9W FOt,I * Pelle �1ZE , 0 0 service or feeder fee, each branch circuit "1 City/State /Zip: SePiTILE t A alb ¢ B. Fee for branch circuits without purchase of service or feeder fee, first branch circuit 46.85 2 Phone: , 4(d, KOD I Fax: 20(0 • I fJ`�1 Eac additional branch circuit 6.65 2 E-mail: Misc.(Service or feeder not included): `. _ `^ 53.40 2 c:w.:-:•-- ; 4; i :CO d N O1 1: f. _�:- '.':' >;: `�+�:= Each ` Eac s pump or irrigation circle i gn or outline lighting 53.40 2 Job No: Signal circuit(s) or a limited energy panel, alteration, or extension GE'tf 'R- c oW 70 S; I Page 2 75 2 Business Name: Description: Address: Each additional inspection over the allowable in an of the above: City/State /Zip: Per inspection per hour (min. 1 hour) 62.50 Phone: Fax: Investigation fee: CCB Lie. #: Lic. #: other: . ` - _ 'Electrical PermifiFees4: ''•' ' T Supervising electrician Subtotal $ tf, 60 76.455 signature required: Plan Review (25% of Permit Fee) $ / , / 49 , 2-3 Print Name: I Lic. #: State Surcharge (8% of Permit Fee) $ 3 7 4'. /e ' TOTAL PERMIT FEE $ g 220 3 1 / Authorize dI . / Notice: This permit application expires if a permit is not obta within Signature: Date: -`/ Zat� l 180 days after it has been accepted as complete. 111 •Fee methodology set by Tri -County Building Industry Service Board. • (Please print name) i :\Dsts \Permit Forms\ElcPermitApp.doc 01/03 ra Nov -18 -2004 13:48 From- T -814 P.002/003 F -467 • mvey Br /' tei r 1 - - 45" j ELECTRICAL COMMENTS AND NOTES FOR WA. SQUARE 1. Sheet E1.6- As per Phase 1 requirements, second egress door must be added to west side of electric room on upper floor at grid lines GG and 33.2. The new door has been added. — see ,HF.e -r E 2 , 2. Sheet E 2.5, Key Note 1 Conductors must comply with NEC 310.15(8)(2). (More than three current carrying conductors....) We have derated conductors and called out #10 wire. l Ze-p-u 3. Sheets 3.4, 3.5 and 3.6 are the fire alarm system and are not a part of this plan review. Correct Design build by Siemens. l ccrr nre 7 r 3 fiz6 i¢c t c,K PRisES ovr- vF 711'5 PL4'ACs 4. Sheet E4.1 is part of the south parking structure and is not part of this permit. Correct We have deleted sheet. ✓ 5. Sheet E4.2 In the details of the elevator machine rooms, the shunt - trip disconnects may not meet the location requirements of the elevator code (handle within 24° of latch side of door). Check with the elevator inspector. We have moved the shunt-trip to within 24 ". ✓ 6. Sheet E4.2, Key Note 7 Connect the #6 cu to the Grounding Electrode System (see 21/E5.1). We have added note. ✓ 7. Sheet E5.1- I need to see the fault current calculations for each of the services. We have requested faults from PGE and will submit with the next set ✓ 8. Sheet E 5.1 The engineered pick up settings for each GFP main breaker need to be specified. It is vital that this breaker be set to selectively coordinate with the breakers in the downstream circuits so that a relatively minor fault in a 20 amp. branch circuit trips only its branch breaker. Without careful coordination of the tripping characteristics of all the breakers in the circuits, that minor fault could cause the main breaker to trip with the resulting major disruption. We assume that you are handling the selective coordination as part of your electrical engineering work, as it is not a part of our plan review or inspection process. We have selectively coordinated. 9. Sheet E5.1- Tenant Empty Conduit Size Schedule -- If the tenant feeder breaker sizes are correct in the one - line diagrams, then the conduit size of "Spare W - 11° should be 2 - 1/2' and W - 13 could be 1 - 1/4" and "Spare W -16' should be 2 -1/2'. We have revised schedule. ✓ 10. Sheet E6.1- Details No. 23 and No. 41 Wiring of control circuits shall comply with NEC 725.55 (separation from power and lighting conductors). We have added a note to the detail. ✓ 11. Sheet E6.1- Detail No. 23— Wiring of generator shall comply with NEC 445.13 (Ampacity of conductors). We have added a note to the detail. 1 Nov -18 -2004 13:48 From- T -914 P.003/003 F -467 12. Sheet E6.1— Detail No. 23 —The emergency system shall comply with NEC Article 700 (Emergency Systems). We have added a note to the detail. I 13. Sheet E6.1— Detail No.23—The grounding electrode for the generator shall also be bonded to the grounding electrode system of the building. (See 21/E5.1). We have added your grounding details. ✓ 14. Sheet E6.1— Detail No.44 —This detail appears to not apply to this project. Please review and either correct the discrepan 'es or delete the detail. The detail was deleted. 15. Sheets E6.2 and E7.1 —All luminaries shall comply with Oregon Structural Specialty Code section 1316. (Energy efficiency). Lighting complies with energy code. Dew . R.E r/E w Or se/,w 16. Sheets E6.2 and E7.1 —All luminaries shall be certified by an electrical testing agency approved by the State of Oregon. Added a note to P113 and PH4 to be UL listed or ETL certified. 17. Sheets E6.2 and E7.1 — The mounting of all luminaries shall comply with Oregon Structural Specialty Code section 1632. (Seismic loads). Luminaries shall comply. — 86in!!t g-EV,e&ED OP BR-14 ✓ 18. Sheets E6.2 and E7.1 —All luminaries weighing more than 50 lbs. (such as PH1, PH2, PH3, PH4) require mounting detail drawings stamped by a structural engineer. Our structural engineer will supply details. — g ,orb V /5S ,&P $e/Ave 19. Spec. book —The panel schedu)es should be included in the drawings. The spec_ book is not a part of the approved plans. V PAiyEL. sck6Ovc.ES iivcwDeo cairn itFPno rap PtAws, Per our conversation we will bind the 8 /2 x 11 sheets to the plan sheets and submit two copies. 2 I , 16v -18 -2004 13:48 From- T -914 P.001/003 F -467 Fax Transmission DLR Group If transmission is incomplete, please contact us at once. Architecture Engineering Planning Interiors 900 Fourth Avenue Date 11/18/04 Suite 700 Seattle, WA 98164.1006 Deliver To Kim Appleberry tel 206/461.6000 fax 206/461 -6049 seattle@dlrgroup.com Company City of Tigard 11 www_dlrgroup.com Fax Number 503 �I Number of Pages 3 (including this page) From Deborah Conway Project Washington Square Project No. 74- 03103 -00 R/NR Message Confidential Notice: The information contained in this facsimile is intended for the use of the addressee(s) and contains information that is confidential and/or privileged. If you are not the intended recipient or the person responsible for delivering it to the intended recipient, any disclosure, dissemination, distribution or copying of this communication is stricrly prohibited. If you have received this communication in error, please notify us immediately by telephone and destroy this facsimile. cc Todd Ferking, James Beck Cover to File Attachments to File '' hiov -18 -2004 13:48 From— T -914 P.002/003 F -467 • ELECTRICAL COMMENTS AND NOTES FOR WA. SQUARE 1. Sheet E1.6– As per Phase 1 requirements, second egress door must be added to west side of electric room on upper floor at grid lines GG and 33.2. The new door has been added. 2. Sheet E 2.5, Key Note 1– Conductors must comply with NEC 310.15(6)(2). (More than three current carrying conductors....) We have derated conductors and called out #10 wire. 3. Sheets 3.4, 3.5 and 3.6 are the fire alarm system and are not a part of this plan review. Correct. Design build by Siemens. 4. Sheet E4.1 is part of the south parking structure and is not part of this permit. Correct. We have deleted sheet. 5. Sheet E4.2- In the details of the elevator machine rooms, the shunt -trip disconnects may not meet the location requirements of the elevator code (handle within 24" of latch side of door). Check with the elevator inspector. We have moved the shunt -trip to within 24 ". 6. Sheet E4.2, Key Note 7– Connect the #6 cu to the Grounding Electrode System (see 21/E5.1). We have added note. 7. Sheet E5.1– I need to see the fault current calculations for each of the services. We have requested faults from PGE and will submit with the next set. 8. Sheet E 5.1– The engineered pick up settings for each GFP main breaker need to be specified. It is vital that this breaker be set to selectively coordinate with the breakers in the downstream circuits so that a relatively minor fault in a 20 amp. branch circuit trips only its branch breaker. Without careful coordination of the tripping characteristics of all the breakers in the circuits, that minor fault could cause the main breaker to trip with the resulting major disruption. We assume that you are handling the selective coordination as part of your electrical engineering work, as it is not a part of our plan review or inspection process. We have selectively coordinated. 9. Sheet E5.1– Tenant Empty Conduit Size Schedule -- If the tenant feeder breaker sizes are correct in the one -line diagrams, then the conduit size of "Spare W -11" should be 2 -1/2" and W -13 could be 1 -1/4" and "Spare W -16" should be 2 -1/2 ". We have revised schedule. 10. Sheet E6.1– Details No 23 and No. 41– Wiring of control circuits shall comply with NEC 725.55 (separation from power and lighting conductors). We have added a note to the detail. 11. Sheet E6.1– Detail No. 23— Wiring of generator shall comply with NEC 445.13 (Ampacity of conductors). We have added a note to the detail. 1 Nov -18 -2004 13:48 From- T -914 P.003/003 F-467 • 12. Sheet E6.1— Detail No. 23 — The emergency system shall comply with NEC Article 700 (Emergency Systems). We have added a note to the detail. 13. Sheet E6.1— Detail No.23 —The grounding electrode for the generator shall also be bonded to the grounding electrode system of the building. (See 21/E5.1). We have added your grounding details. 14. Sheet E6.1 Detail No.44 —This detail appears to not apply to this project. Please review and either correct the discrepancies or delete the detail. The detail was deleted. 15. Sheets E6.2 and E7.1 —All luminaries shall comply with Oregon Structural Specialty Code section 1316. (Energy efficiency). Lighting complies with energy code. 16. Sheets E6.2 and E7.1 —All luminaries shall be certified by an electrical testing agency approved by the State of Oregon. Added a note to PH3 and PH4 to be UL listed or ETL certified. 17. Sheets E6.2 and E7.1 —The mounting of all luminaries shall comply with Oregon Structural Specialty Code section 1632. (Seismic loads). Luminaries shall comply. 18. Sheets E6.2 and E7.1 —All luminaries weighing more than 50 lbs. (such as PH1, PH2, PH3, PH4) require mounting detail drawings stamped by a structural engineer. Our structural engineer will supply details. 19. Spec. book —The panel schedules should be included in the drawings. The spec_ book is not a part of the approved plans. Per our conversation we will bind the 8 %s x 11 sheets to the plan sheets and submit two copies. 2