FINAL SUMMARY LETTER
September 13, 2006
T0407219D
City of Tigard
13125 SW Hall Blvd.,
Tigard, OR 97223 -8199
Attn: Building Department
Re: Washington Square Expansion- Bridge/Stair Canopies
9585 SW Washington Square Rd- Tigard, OR
Permit# BUP2005 -00587
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Installation of Adhesive Anchors
Structural Steel
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Andrew M. Ewing
President
AME/ks
cc: The Macerich Company
DLR Group Architecture & Planning- Scott Rose
DLR Group Engineers (Seattle)- Dan Munn
Howard S Wright Construction Co- Dan Clark