Loading...
Report Carlson Testing, Inc. Men (*kr Salm Office Bead Office Tigard 'RamEa 4060 Mann . NE 63073 OB RIkyRdN /I Tigard OR 97773 Salmi OR 97301 Band OR 97707 Pours: (SOl) 68I -3160 . Phase: (SN) 589 -1)SJ Phan.. (5I1) 3349155 Construction Materials Testing & Inspection Far 15031684-0951 Far 13031589-1309 F�134113349163 Special Inspection FINAL SUMMARY LETTER September 13, 2006 T0407219D City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department Re: Washington Square Expansion- Bridge/Stair Canopies 9585 SW Washington Square Rd- Tigard, OR Permit# BUP2005 -00587 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors Structural Steel All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Andrew M. Ewing President AME/ks cc: The Macerich Company DLR Group Architecture & Planning- Scott Rose DLR Group Engineers (Seattle)- Dan Munn Howard S Wright Construction Co- Dan Clark