Special Inspection
FINAL SUMMARY LETTER
"AMENDED"
November 1, 2005 / November 7, 2005
T0407219. CTI
City of Tigard
13125 SW Hall Blvd.,
Tigard, OR 97223 -8199
Attn: Building Department
Re: Washington Square Expansion —Area B
9585 SW Washington Square Road — Tigard, OR
Permit #. BUP2004- 000454
Dear Sir or Madam:
This is to certify that in accordance with Section 1701 of the Uniform Building Code we have performed special inspection of the
following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Cast in Place Anchors
Installation of Adhesive Anchors
Structural Masonry
Structural Steel- Fabrication and Erection
Welding
High Strength Bolts
S.M.R.F.
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our
knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable
workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals
and verbal instructions.
Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full,
without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted, g�
CARLSON TESTING, INC. ASIS ,O PRO /Ze CARLSON TESTING, INC.
4,, 15,764 9 'S°
Andrew M. Ewing • r • l William M. Weyrauch, P.E.
President -enior Project Engineer
✓4111 21,‘'%
•
AME/KP /mbw� 3,
cc: The Macerich Company — Rick Beason
DLR Group Architecture & Planning — Scott Rose
Howard S Wright Construction Co — Dan Clark
DLR Group Architecture & Planning (Seattle) — Dan Munn
_ NOV -10 -2005 THU 04:40 PM CARLSON TESTING INC. FAX NO. 5036840954 P. 02/02
Main Office Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
r� Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carlson Testing Inc. Phone (503) 684-3460
FAX (503) 684 -0954 Phone (503) 589 -1252 Phone (541) 330.9155
FAX (503) 589 -1309 FAX (641) 330 -9163
Special Inspection
FINAL SUMMARY LETTER
"AMENDED"
November 1, 2005 / November 2005
T0407219. CTI
City of Tigard I) 1' TI ION
13125 SW Hall Blvd.,
Tigard, OR 97223 -8199 �.
Attn: Building Department
Re: Washington Square Expansion Area B tOP
Y `,
9585 SW Washington Square Road — Tigard, OR 1�
Permit # BUP2004- 000454 --
Dear Sir or Madam:
This is to certify that in accordance with Section 1701 of the Uniform Building Code we have performed special inspection of the
following item(s) per our inspection reports only:
Reinforced Concrete
Installation of Cast in Place Anchors
Installation of Adhesive Anchors
Structural Masonry
Structural Steel - Fabrication and Erection
Welding
High Strength Bolts
S.M.R.F.
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our
knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable
workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals
and verbal instructions.
Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full,
without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted, �y
CARLSON TESTING, INC. ci PRaLt& CARLSON TESTING, INC.
G1Np P�
`r V ' ' 47 15.784 4
Qty
Andrew M. Ewing • r William M. Weyrauch, P.E. •
President 7.. p enior Project Engineer
v
Q'.t1.. � a21., G � 1� .
AME/KP /mbw •
cc: The Macerich Company — Rick Beason
DLR Group Architecture & Planning — Scott Rose ,
Howard S Wright Construction Co — Dan Clark
DLR Group Architecture R. Planning (Seattle) — Dan Munn