Loading...
Plans • -- , 62ct'3-cv7od CLARK P A C I. F I' C Architectural, GFRC, Natural Stone, CCAPPTM and Structural Precast Products April 27, 2004 Brian Blalock City of Tigard Building Department 13125 SW Hall Boulevard Tigard, OR 97223 Attention: Mr. Brian Blalock Reference: Washington Sqr. Mall Pkg. A Clark Pacific Job No. 6004 Subject: Precast / Prestressed Concrete 9585 SW Washington Square Rd. Dear Mr. Blalock: Please find below a list of your review comments dated April 20, 2004. You should find a response to each of your comments as stated "for prestressed and precast concrete products" (comments 32A through 32H). This letter along with the re- submitted calculations and drawings should answer each of your items. Please find attached to this letter our in house stressing calculations per the current PCI method. Item City Comment Clark Pacific's Response No. 32A Submit drawings and Drawings and calculations to be initialed by Dan Munn of DLR. calculations with review by Engineer of Record noted on drawings 32B Submit calculations and • Panel 2F26B has already been analyzed for vehicle impact details for vehicle loading. See analysis output on sheet B5.2 — B5.4. (Sheet B5.2 horizontal load at has been revised to clarify location of impact load. spandrel 2F26B, 2F34, 2F26A, 3F40A, 3F23A, • Panel 2F34 is nearly identical to panel 4F34 and does not 3F9, and 3F10. represent a unique case. See analysis of panel 4F34 (on sheet B10.0 — B10.5) for vehicle impact analysis. • Panel 2F26A is located outside of an upturned moment frame beam and is not accessible /exposed to vehicle impact. Panel 4F26A (above) is subject to impact load. It is very similar to panel 2F26B — see calculation sheets B5.0 — B5.2. • At time of submittal, panel 3F40A was not accessible /exposed to vehicle impact. Subsequent revision to bridge location requires �o I modification to panel 3F40A and it has been re- analyzed w `I inclusion of vehicle impact. See new calculation sh B11.6. i; �,� ri° M PS 7' 1980 South River Road, West Sacramento, CA 95691 -2817 916/371 -0305 Fax: 916/372 -0323 \,� 10\\1\ 13 Slover Avenue, Fontana, CA 92337-6978 9 Fax: 909/823 -1361 G Q \C\ Contractor's State License No. 690453 �V\ www.clarkpacific.com 32B • Panel 3F23A is located outside of an upturned moment frame cont. beam and is not accessible /exposed to vehicle impact. Note — revision to panel has been made to provide additional out -of -plane support for cantilevered end. See revised calculation sheet B4.0. Please also see detail D12 on drawing SD2. • Panels 3F9 and 3F10 are similar to (yet smaller than) panel 4F17. Panel 4F17 was analyzed for impact on sheet C17.1 (performed in connection section because 4F17 is a small panel and only reason analysis is needed is to determine forces for connection 17). • The following sheets have been revised to clarify the location of the impact load: B5.2, B6.1, B9.2 32C Submit calculations and See new panel analysis for panel 3F40A on sheets 811.0 — B11.6. Please details for new bridge also see detail D11 on drawing SD2. location on east side. 32D Submit calculations and Please see sheets 3.27 and 3.29 of the calculation package and details details for revised D3, D4, D5, D6, D7 and D8 on drawing SM. anchor bolt size at non moment base. 32E Submit calculations and Column cover analysis (including seismic) is shown on calculation sheets details with review by B2.0 — B2.1. Corresponding connections have been designed on Engineer of Record for calculation sheets C3.0 — C4.6, and C13.0 — C13.1. Reinforcing for column covers, including column covers is included in sheets D3.0 — D3.4. Additional calculation seismic and top slab. has been provided for top cap reinforcing (see new sheet D3.5). 32F Submit calculations Item P66/MP4 is part of connection 12 and is designed on calculation including forces to slab. sheets C12.0 — C12.4. An additional calculation has been provided for connection to slab on revised sheet C12.4. 32G Submit Spandrel at grids No spandrels required where there are metal panels per detail 46/S3.2. 1.4 to XZ to QQ.3, and grids XZ and 1.4 to 2. 32H Submit drawing and See attached sheets. calculations for stressing If you should have any questions about this letter, our drawings, or our calculation package please feel free to give me a call at (916) 371 -0305. Thank You, Jeff Marchant, P.E. Asst. Project Manager JM /jdr Attachments . cc: B. Clark/D. Clark/T. Tucker /K. Hammon /C. Durgarian/J. Marchantx3 /File 1•= ;-::_�^- PROJECT: WASHINGTON SQ MALL AREA A JOB: #6004 [ CONTRACTOR: HOWARD S WRIGHT SHEET: PULL -IB TYPE 1 II li CL I PULLING SHEET DATE:03 /17/04 BY MS CHECK: JTM BEAM TYPE : 1 PANELS: IB1 IB3 IB4 Cast Date: FORM #: • IB11 IB12 IB13 Inspected By:' Strand Pack #: IB14 Stressed By: PANEL ID #: JACK ID #: Strand Strand Size and PULL ELONGATION (INCHES) LOAD (LBS.) Pulling Location *Calc'd Actual Actual Allo Calc'd Actual Sequ. on Form O from 4000 Final Rdg. Diff. Di Lbs. (QC) , (QC) +/ -5% (Lbs.) (QC) 1 25 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 2 18 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 3 26 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 4 19 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 5 24 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 6 17 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 7 23 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 8 16 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 9 27 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 10 20 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 (. - 11 28 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 12 22 0.6" 270k, 37.5k 12 3/4" 5/8" 39,100 13 3 0.6" 270k, 15k 4 5/8" 1/4" 16,600 14 2 0.6" 270k, 15k 5 5/8" 1/4" 16,600 15 16 17 18 19 20 21 22 23 24 25 GENERAL NOTES 1) Note that all strands are initially pulled in sequence to 4000# prior to final tensioning 2) QC is to fill in all SHADED areas during strand inspections i ' PROJECT: WASHINGTON SO MALL AREA A JOB: #6004 CONTRACTOR: HOWARD S WRIGHT SHEET: DETEN -TYPE 1 _I11 I CLARK—. DE- TENSIONING SHEET DATE: 03/08/04 r BY: MS CHECK:A BEAM TYPE: 1 FORM: erftwitfigliM PANELS: [IB:1_ :�"�_:_, , �, +; „. ;�, tIB4�b!'s .;w_�:w myr�.,�.. #0;1404:,111:7: De- Tensioning Strand Location Sequence to cut 1 2 &3 2 28 3 22 4 16 &23 i 5 20 &27 6 19 &26 7 17 &24 8 18 &25 9 10 11 -12 13 ' 14 15 16 17 18 19 20 GENERAL NOTES: 1) Strands to be cut simultaneously at each end of beam per de- tensioning sequence 2) Strands at exterior end bulkheds to be cut first per sequence 3) Strands at interior bulkheads to be cut only after strands at the exterior bulkheads have been cut • CLARK PACIFlC PROJECTWASHINGTON SO MALL PK JOB 6004 01 1980 South River Road CONTRACTOR HOWARD S WRIGHT SHEET 1 ppEUiYU0 West Sacramento, CA 95691 DATE 03/05/04 TEL: (916) 371 -0305 FAX: (916) 372 -0323 PULLING SHEET , I Che ck .A 0 • • 1 0 — ROW *6 0 5 — ROW *5 • USE STRANDS: 3, 2 20, IL ' 28, 27, 26, 25, 24, 23, 22 0 0 0 - ROW *4 ° 0 0 2 11 0 — ROW *3 21 20 • • 17 • 0 — ROW *2 28 27 26 25 24 23 22 • • • • • • • — ROW *1 A I -BEAM TYPES 1, la - SCALE: 1 1/2" = 1' -0" • 1 ___- PROJECT: WASHINGTON SO MALL AREA A JOB: #6004 on 1 ■�Il�i CONTRACTOR: HOWARD S WRIGHT SHEET: PULL -IB TYPE 2 CLARK t• PULLING SHEET DATE: 04 /02/04 P A C I F l c BY: MS CHECK: JTM BEAM TYPE • 2 - - -- '::IB10 • �; : C ast Date: :j,, +� FORM #: �. -. - ' PANELS: IB2 a ��167 �' ?<' '�y,- ,°;�`. -, - - ��- ' I - { N zIB8(a) • ', . '. `:' Inspected By -_ ra'• I _ Strand Pack #: - . °1B6: 'y: ; 039(a) - — _ ` "°• a. Stressed By: l _ . ._. . _ =i •1`q PANEL ID #: • -: :: ,::s JACK ID #: • • -:: Strand Size and PULL ELONGATION (INCHES) LOAD (LBS.) Pulling Strand Location on *Calc'd Actual Actual Allow Calc'd Actual Sequ. O from 4000 Final Rdg. Diff. Lbs. QC Form Lbs. (QC) (QC) +Duff. / -5% (Lbs.) ( ) 1 25 0.6" 270k, 32.5k 12 1/4" ::: is ' : 7 '. :::___ 5/8" 37,700 2 18 0.6" 270k, 32.5k 12 1/4" - '. 5/8" 37,700 • .. _. 3 26 0.6" 270k, 32.5k 12 1/4" ... -•.• - : ::"3 , 5/8" 37,700 :, '-. 4 24 0.6" 270k, 32.5k 12 1/4 ". _ _ : :y. a 5/8" 37,700 - ,:J 5 23 0.6" 270k, 32.5k 12 1/4" - • - - ..' .,':F 5/8" 37,700 , , - • 6 16 0.6" 270k, 32.5k 12 1/4" F .- - .f:::',: 5/8" 37,700 ' : - _" ' ;; --_, ' : 7 27 0.6" 270k, 32.5k 12 1/4" - - • • :- :- , .:. , .. 5/8" 37,700 ..: . • 8 20 0.6" 270k, 32.5k 12 1/4" = - -.._ ': ; 5/8" 37,700 :.;. 9 28 0.6" 270k, 32.5k 12 1/4" - ' : =A "•? 5/8" 37,700 .: `, K:'.t t ;. 10 22 0.6" 270k, 32.5k 12 1/4" 'i _� r� 5/8" 37,700. .: - • .:' -'•: . 2 0.6" 270k, 5k 1 3/8" - " i+. 1/8" 7,700 - - A.• : . • 12 3 0.6" 270k, 5k 1 3/8" - — V! 1/8" 7,700 14 . •• .: , 20 . 21 ,.. - -- • - { ::z� 23 - . =': t;i- e:....., ;<` : - :. .. _ 24 - -_ ty GENERAL NOTES - 1) Note that all strands are initially pulled in sequence to 4000# prior to final tensioning 2) QC is to fill in all SHADED areas during strand inspections ISSUED FOR CONSTRI ICTInN 'APR 0 6 2004 6004 - I BEAMS PULL.xls, PULL4B2 4/6 /2004, 4:05 PM CLARK PACIFIC i of 1 CLARK PACIFIC PROJECTWASHINGTON SO MALL PKG JOB 6004 1980 South River Road CONTRACTOR HOWARD S WRIGHT SHEET 2 ppMpgp[E West Sacramento, CA 95691 PULL ING SHEET DATE 04/02/04 TEL: (916) 371 -0305 FAX: (916) 372 -0323 BY MS chec M S� 0 • • 1 0 - ROW *6 6 5 - ROW *5 USE STRANDS: 3. 2 20, 18. 16 { 28, 27, 26. 25. 24, 23, 22 ZO 0 0 — ROW *4 0 0 0 0 - ROW f3 0 • 0 • 17 • 0 - ROW $2 28 27 26 25 24 23 22 - ROW $1 A I -BEAM TYPE 2 SCALE: 1 1/2" = 1' -0" • PROJECT: WASHINGTON SQ MALL AREA A JOB: #6004 l a CONTRACTOR: HOWARD S WRIGHT SHEET: DETEN -TYPE 1 CLARK DE- TENSIONING SHEET BY Oy � HECK: �� P A C I F I C BEAM TYPE: 1 FORM:,I nY :I132 PANELS: IB2(,ar 7. 7 �r' "' tI B5 a _:-- ..`�A.;; EtB6: _ N`.t 01 De- Tensioning Strand Location Sequence to cut 1 2 &3 2 28 3 22 4 16 &23 5 20 &27 6 26 7 24 8 18 &25 9 10 11 12 13 14 15 16 17 18 19 20 GENERAL NOTES: 1) Strands to be cut simultaneously at each end of beam per de- tensioning sequence 2) Strands at exterior end bulkheds to be cut first per sequence 3) Strands at interior bulkheads to be cut only after strands at the exterior bulkheads have been cut • 1 - CLARK PACIFIC PROJECT WAc�h; F� JOB UOCPs ri 1980 South River Road CONTRACTOR S SHEET . West Sacramento CADATE / CLARK TEL: (916) 371 -0305 =� pu`t ��� 4�ra� 11 MA tt • P A C I F 1 C FAX: (916) 372 -0323 _$ - 2- BY S - "E"` •Yc./V\ •..Mncitrw.pa. -more t35_ l3'P-CM-- M -BV \hl _i__NS9f.O. t1tJ1 i I . E% ' _ 28..4 x103 -vat _ _ _ _._ _ . __ -L naD = arr c = — 1...4 r 2'_ 28 _31 :__ • r-oP-t. LocSt3 - — — - - - - -- - - - -- -- - - - -- — - -- - - - - re , p- Mo rlu tC__ L _ • - Fow■ _ Sttoa- - Ce:JS -_ R- - -Ir ruts t, btt -t0 . _.SwF - is! ( = -6u. v ) -- - - - - - - - - - - - - - - -• foe- 1°■c FoaM.= v7_(...at )=- y21-2':) _e__ too ?Wt-Vz: - 2 SIRe tADS 'Al t-eb -- --' -- - -- - - - - - -- - -- - - - 90 bF M _ - i -- _ _ - e-s�— °lo. - -14 t"V'SK :,w -- -- ' 6.P_..Y1r'1Gl4C . -- - :- --:- ✓oC t' k 07sst-- = v-�� x 112 LoE rt �pc. �'� ? -- i17-i4:0 ' 0.2'l `1 ~ z • eec. S�o��zau..1 pelt- 6 : -- t ... = • T ° (4D%( Lo'b " ... ' - S C:X:PA Et4b Cts - 61. `1- S 1p)M (A44IMW) . V 6-..— - - -- - -- - - - - -- • -- - - - -- - - -- L-WvE ;Dab Cr- rc..L..,V SCM 116.S1.IME.,) .. = Y b - • - To upss t8:-.4.0p. + 'n-e y * y't:5• + • /e+) _ t 0.51A2 -- • LpP.o P•tnow o -it, . tic -01ae LASSO .. -- - . - . ._ . - - . - -. - -- ( . . Pins ' 11/...! 6i, 571 2) . \ - C1 p co. +► z+ oi.4)Lp•22, \ L2Pe•oY tops Y� -.4- t. �•5c ) IC ' '1.- . trrS,,.... - 1...V Pr t.n` - - b5i� • 1 0.4 S +aD t-t .L, . Qa.c- ca,;a.fl '61.g5' + _ Z-t• - _ 3C% • ott31. P4. .,--t %.,p \S E. 1- 2 = 12*5€22" ILO • 5e:ft.P ✓ .- - .. Fern = no 1- ' - O• Z2\e) VJ?- .._ _ ' ti - (7 -a = .➢2.5 si si . -I -_ .1 -W ) M+oc. AU.D• - 0.0 Ft:,._ = O.13 UJCI) - 4e, c)X (/ -- _ . - - - trl,ita- DEFLTI LOt4 OF Z1 !DS _ _ X . _ . . - - - d,,,a = = ( tgo4)Ij ^�s = 4 - - 14- •1F> ;r. . -- - - -- -- - - - - - - .- -- - - - - -- -- - -- -- -- - -- - -. - - -- - - - - -- A t,,, = . - (• ro-- .r,1;2.') CI"c (ti) ._ '2-.•' . -;1 - - - ---. -� ..Ob-b -1P1-. - - - - -- . - -- --- -... ii,-_—_---_-_ - -_ lD .� 2161 C?S •�tx W3� - -- - - -- — — -- •----- -- - - -- -- - - - f _.t9.�t0)(.Ze.4x1rn) - - - -= - - - - - -- - -- - -f • i - -- - — ' • -- • ' 1 - _ : is, ,,,a i�.�>�1 aD�ui� _ - - -- �: t : o i ✓ -- - - - = CLARK PACIFIC PROJECT W 1rJ to JOB ; 1980 South River Road CONTRACTOR Z DATE 2� 2 I iii1 1i i West Sacramento, CA HSW CLARK TEL: (916) 371 -0305 e ' COQ, 2 . 1 ; 2 41.- DA- PACIFIC FAX: (916) 372 -0323 PG M V tD _ •L6 - ti BY leaS HECK . 37A A • FbpM LoSSt;b • 1D StPIN-n10S . 2 *1DS x . S ``/_cro.Atab 2 -" -- MAX. - 8 - " - 41. C \ 1- ° le L2 x b • • b x ` I = D •'' •• geD 'tov=ceNle S-[a-mao - \ . = 0. 1 DS .. . - DePD VAC) CAm (.hs nCX- SerC1►It suMe) = ,/ ram toss = (. b.s►� ' o • 10'Y� . ' /g' * ` /b') = b• B 1c>5. ' Lo ohtt. OV ERLCME. tASS�C ?um PwSS t A1 . o4A \M) Le. i L2�. +n 10O * _ = f Q,. ADS v- Lt qo +7 U7-u i i-) ▪ N %3 -crab \�+.os P11t►cx = Qnc6�WN + ?LOSS Fva�, lef -T1oµ OF 4' •t L'f" �od5 wlL'° ° 4 ' U2wlft) n ' lo,u�e u+9128.+ *yob vs�1 13• tv Ir1 �® lA•2t�8 Ltb. xlO V- 1 1-^1 \H\ �3-►• Uos'= 4" )Ug0 ) U2"a/fp) ` 1 2•Ili Ciselo s O • Ut tt.1' (O • 921 8 fi (.28.4X41) 1%•S1) A T. ( •u04*-4" )(:44 L12? )-C-0 _ , abs L,s 0 • (A • 2'2x 8 1 t4 1U' VA PROJECT: WASHINGTON SQ MALL AREA A JOB: #6004 "" CONTRACTOR: HOWARD S WRIGHT SHEET: PULL -RB TYPE 1 Ilnil FAA • PULLING SHEET BY: MS JTM BEAM TYPE : RB1 PANELS: RB1 Cast Date: FORM #: RB2 Inspected By: Strand Pack #: RB2a Stressed By: PANEL ID #: JACK ID#: Strand Strand Size and ELONGATION (INCHES) LOAD (LBS.) Pulling Location PULL *Calc'd Actual Actual Allow , u. Calc d Actual Sequ. O from 4000 Final Rdg. Diff. Diff. Lbs. (QC) (QC) +/ -5% on Form (Lbs.) (QC) 1 3 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 2 7 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 3 13 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 4 19 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 5 4 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 6 8 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 7 14 0.6" 270k, 36.3k 5 1/8" • 1/4" 41,500 8 20 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 9 9 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 10 15 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 11 21 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 12 6 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 13 12 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 14 18 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 15 5 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 16 11 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 17 17 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 18 10 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 19 16 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 20 22 0.6" 270k, 36.3k 5 1/8" 1/4" 41,500 21 1 0.6" 270k, 12k 1 3/4" 1/8" 17,400 22 2 0.6" 270k, 12k 1 3/4" 1/8" 17,400 23 24 25 GENERAL NOTES 1) Note that all strands are initially pulled in sequence to 4000# prior to final tensioning 2) QC is to fill in all SHADED areas during strand inspections 1) QC is to measure actual bed shortening so engineering can adjust pull calculation 6004 - I BEAMS PULL.xls, PULL -RB1 4/27/2004, 9:39 AM 1 of 1 w PROJECT CLARK PACIFIC WASHINGTON SO MALL PKC JOB 6004 . • 1980 South River Road CONTRACTOR HOWARD S WRIGHT SHEET 3 West Sacramento, CA 95691 DATE 04/05/04 TEL: (916) 371 -0305 FAX: (916) 372 -0323 PULLING SHEET BY MS Check .3114( r N 3" 11" 3" • N \ ^ ^ 41=Nr - L ROW *5 STRAND USE STRANDS: 1, 2 _ ao = 3, 4 ti 5.6,7.8.9.10 N 11, 12. 13, 14. 15. 16 17, 18, 19, 20, 21, 22 C: ) ® – ROW •4 STRAND iv —ROW 0 3 STRAND N • • • • • of-- - —ROW *2 STRAND N • • ' • . e • v ' — ROW *1 STRAND * } \ V , 0.6 "0 STRAND, TYP. 1' -5" ir (SEE CHART FOR TENSION) Q• = DEBOND 17' -0" EA END Q• » DEBOND 12' -0" EA END A P -BEAM TYPE 1 • - ) SCALE: 1 1/2" = 1' -0" ISSUED FOR CONSTRUCTION APR 0 7 2004 CLARK PACIFIC I`' = • "` 7 71 PROJECT: WASHINGTON SQ MALL AREA A JOB: #6004 111111 :1 CONTRACTOR: HOWARD S WRIGHT SHEET: DETEN - TYPE 1 II I 1 111 CL ARK DE- TENSIONING SHEET DATE: 04/05/04 BY: MS CHECK: 6 BEAM TYPE: RB1 FORM: RB1 PANELS: RBI RB2 RB2a De- Tensioning Strand Location Sequence to cut 1 1 2 2 3 5, 11, 17 4 10, 16, 22 5 9, 15, 21 6 6, 12, 18 7 3, 7, 13, 19 8 4, 8, 14, 20 9 10 11 12 13 14 15 16 17 18 19 20 GENERAL NOTES: • 1) Strands to be cut simultaneously at each end of beam per de- tensioning sequence 2) Strands at exterior end bulkheds to be cut first per sequence 3) Strands at interior bulkheads to be cut only after strands at the exterior bulkheads have been cut inuED FOR CONSTRUCTION APR 0 7 2004 CLARK PACIFIC • • — CLARK PACIFIC PROJECT s, JOB U 1980 CONTRACTOR SHEET if West S t Sacramento, o u South River r R d k-1%N.4 bEt•scrl , *-17q) DATE ?ALL c..t CLARK TEL: (916) 371-0305 5 APP.4 I- OA .f....t; PACIFIC FAX: (916) 372-0323 ( 7 vktivroD, P•151 BY ty-) rHECK i j\ J • . I . _. _ 9-41" - _ ..... .. — . -- . — .- _ ... . C ID . Or MAI- - ' . 5(.95■LP .__ 81". 54590 .. ._. ______ _. . _._. _._....__ _ _ _._ _ _ _ .____ _ ____ (2. ') ( ou ) s lo • eAs 5 ..: 0 • 51 0 0s5, Y- Y2- . = o • 401 1 . _ CCP- iNET) WiNIA _.--,- - O. P5tatietzu.1 - - - - - -- - _ 11)E3.) SIN:FL-M Pec- % -_ - o • obtil'A u-k . _ . . . -. ` .. t %De (.-...b 4- v iv.) _ _ _.._ .. . ... . . .. _ . _ _____ _ . _ _... VarcAt. -- L. ::, C.4-•%. v- SEINTA4 :-_Ne .t,r_.% , Ascarne-b _. _ ... ---;-. _ - rum_ L.cos a o . aro 4- 0 - o'6o if4 - . ve," ...- V b" •ccp 9 t i ' ) . -- • LDIet, PD' t-.) TD CNef-Car . e LtitzSe•-• - ...f... - -- P Lb-4 = _ _ . .- Lo.t.o41.•1` )1 o .2.2At51 ) URA mos 1.4.0 .... _..... 1....Jb . )i...11.-x-si orl .. _ . k).i..4•Au% ip..i)(..0-2.2-1.e> V4l)t.2.e..Attcp0A) _ _ . _ V%...o obc•T - ( "0 • *7-.% -C.-) ( _ .. .-- -- • A Va % theKIJS - Pas4_34., 7- V kW. * P ..% SMS - P.1ID1 war s 1.9 • % I-LD • Fuu- ttee OF ST94.-4 _ PL._ on • v-)wt, .-AS c.4-) lA2. I f4-) . - 6 - 1 DP - AS - La • 22% 5 u-0-) l...2e) • 1 tot. r-E. I) - ( t . )1: s" - r - 4 - 1 WO^ IC-I-) 6, bur - LO•21.1t51/1 ) (.92,. ts1 ) = • ls III 114 • TIr-4Fsc., ov- i a rckp,-A.„ %,,cr .._ - 0 .2.. t4 = \ .15 ■vl V ak- - . - t o Ili tt-I - Drol- *4 --••• .1 if-4 I/ eF ... - .. . . . _.... . _ . . -- - _ ___ _ . -- -. --- V V - __ _ -- - ... --- - - - - - - _ . • 614*Put rAht 9:f0 9. • * 1'* • CITY OF TIG D April 20, 2004 , OREGON Craig Durgarian Clark Pacific 1980 South River Road W. Sacremento, CA 95691 RE: PRECAST/PRESTRESSED CONCRETE FOR OPEN PARKING GARAGE Project Information Building Permit: BUP2003 -00700 Construction Type: II -FR Tenant Name: Washington Square Occupancy Type: S4 Address: 9585 SW Washington Square Road Occupant Load: 976 Area: 194,720 SQ FT Stories: 4 Attached is a copy of the STRUCTURAL REVIEW from the City's consultant. Submit 1 copy of revised drawings and any additional information requested by the consultant for second review. Upon approval of plans, 2 additional sets of drawings with all current revisions will be required. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. FILE # Respect CC W O �J !11 J 8. CLARK _I 0 CLARK rian B1. k, T T1J( R Senior = ans Examiner K. HA 4MON mi 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 17 co P11 II 11 . V'J1 'Y J. V 1 IVI 111 {YI LLL1 I '...'J1`I...) V L I INV Li I VV G'Y V 1 (JY I G 7 I r. V Z. , .1 6 jz3 JOB NAME: Four Story Parking Garage & Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall r iVED BUILDING DEPARTMENT DATE: April 19, 2004 APR 2 2 2004 13125 SW HALL BOULEVARD TIGARD, OR 97223 SHEET 1 of 4 CLARK PACIFIC 031082 STRUCTURAL PLAN REVIEW #4 Building Permit (Clark Pacific Plans dated 4/7/04) BUP 2003 -00700 (Precast/Prestressed Concrete Products, Item #32) • Corr. Item Page No. Comments Made No. 2/12/04 1 Shts A8.0.A Submit calculations and details for stairs and handrails. A8.1A Note: Deferred Submittal A8.2A 2/12/04 2 Sht. S0.1 Precast prestressed units. Structural Notes Item number 2. Engineer required to be registered in the state of Oregon. 2/26/04 3 Shts. S1.0A, S3.0 Submit calculations and detail for concrete auger - cast piles with vertical and lateral load combinations including pile to pile cap interaction. Note: Submit calculations with lateral loads from analysis distributed to piles at moment frames including shear and axial loads. Conflict between soils report values and lateral load analysis. 2/26/04 4 Sht. S3.0 Submit calculations and details for anchor bolts including uplift. Detail 12/S3.0 Note: Details in conflict with calculations Sht. S3.2 Details 33 and 34/S3.2 2/12/04 5 Sht. S1.0A Submit calculations and details for grade beam at grid KK.1 between grids 7 and 7.5 2/12/04 6 Sht. S1.0A Submit calculations and details for building at grid 7 between grids JJ.1 and KK.1. 2/12/04 7 Sht. S1.0A Submit calculations and details for P/T slab at grids 5.5 to 6.0 and grids SS to TT. 2/12/04 8 Shts. S2.0A and Submit calculations and details for methods used to transfer lateral S2.1A loads from all parts of diaphragm to moment frame. 2/12/04 9 Sht. S5.1 Clarify ties at second level between grids PP1 and PP8. Calculations Detail 21/S5.1 note 3 %2" o.c. Drawing notes 4" o.c. 2/26/04 10 Sht. S5.1 Submit calculations and details for coupling of moment frames at grids Detail 31/S5.1 4 to 5.5. Note: Calculations in conflict with plans and concrete beam schedule. - 2/12/04 11 Sht. S5.1 Submit calculations without moment frame beam at top level. Details 31/S5.1 and 51/S5.1 "'12/04 12 Calculations Page Submit calculations with "Rho" Factor. 204 through 207 T vv.. a iv • ••. a a l\ii uuua.. VVl \.JVL11YlJ L..lYV (a�V IJ7J 1! JL,Joo }�l..y� Y. Ui RECEIVED JOB NAME: Four Story Parking Garage & Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall APR 2 2 2004 BUILDING DEPARTMENT DATE: April 19, 2004 CLARK PACIFIC 13125 SW IGARD BOULEVARD � (L{EET 2 of 4 223 031082 STRUCTURAL PLAN REVIEW #4 Building Permit (Clark Pacific Plans dated 4/7/04) BUP 2003 -00700 - (Precast/Prestressed Concrete Products, Item #32) Corr. Item Page No. Comments Made No. 2/12/04 13 Calculations for Clarify column reinforcing steel. Calculations note more reinforcing Concrete Columns bars then note on drawings. 2/26/04 14 Sht. S2.10A Submit calculations and details at framing to existing building. • Bridge 1 and 2 Note: Details for C12 x 20.7 connections. 2/12/04 15 Sht. S2.10A Submit calculations and details for sloped steel member connection to Bridge 1 and 2 W36 x 150 and W36 x 210. 2/12/04 16 Sht. S2.10A Clarify detail 32/S3.4 at precast column. Bridge 1 2/26/04 17 Sht. S3.0 Clarify detail 12/S3.0 and details 33 and 34/S3.2. Detail 12/S3.0 Note: Calculations in conflict with plans. No difference noted on plans. 2/12/04 18 Sht. S3.0 Submit calculations for wall with impact loading. Detail 25/S3.0 2/12/04 19 Sht. S3.0 Submit calculations for pile reinforcing steel embedment considering Detail 26/S3.0 uplift. 2/12/04 20 Sht. S3.1 Submit calculations for detail. Detail 55/S3.1 2/26/04 21 Sht. S3.2 Clarify anchor bolt number. Details 33 and 34 Note: Details in conflict with plans and calculations. 2/12/04 22 Sht. S3.2 Submit calculations for connection of steel tube to steel plate and Detail 54/S3.2 anchor bolts. 2/12/04 23 Sht. S3.2 Clarify 7 x 4 x 1 /4 angle. Detail 54 and 55/S3.2 2/12/04 24 ' Sht. S3.3 Submit calculations and details for slab shrinkage. Detail 33/S3.3 2/12/04 25 Sht. S3.3 Submit calculations and details for horizontal load. Detail 51/S3.3 2/26/04 26 Sht. S3.3 Submit calculations for connections including edge distance. Details 44 and Note: Reduced value for tension. 53/S3.3 _.• - v -J • J J . ••■ , It I.,. LLL.L 1 .:1Y■/r' • ly 1 777 1 V 7U_,00 / G7 / Y. U4 JOB NAME: Four Story Parking Garage & Bridges RECEIV CITY OF TIGARD JOB ADDRESS: Washington Square Mall APR 2 2 2004 BUILDING DEPARTMENT DATE: April 19, 2004 13125 SW HALL BOULEVARD CLARK PACIFIC TIGARD, OR 97223 yEET3of4 031082 STRUCTURAL PLAN REVIEW #4 Building Permit (Clark Pacific Plans dated 4/7/04) BUP 2003 -00700 (Precast/Prestressed Concrete Products, Item #32) Corr. Item Page No. Comments Made No. 2/26/04 27 Sht. S3.3 Submit calculations for expansion anchor with load at end of anchor. Detail 54/S3.3 Note: Detail method used to keep pipe from bearing on anchor and how load is transferred to shear. Provide calculations for CMU bearing at pipe. 2/12/04 28 Sht. S3.4 Submit calculations for connection, including bending, for guardrail to Detail 21 and 22/S3.4 angle in concrete. 2/12/04 29 Sht. S3.4 Submit calculations and details for connections of bent plate. Detail 24/S3.4 2/12/04 30 Sht. S3.4 Submit calculations for 9 - #4. Detail 32/S3.4 2/12/04 31 Sht. S3.4 Submit calculations with truck loading. Detail 42/S3.3 32 General Reviewed and initialed deferred submittals shall be submitted to the City of Tigard for precast concrete, post- tensioned slabs, signs, and stairs 60 days before delivery to job site. *32A General Submit drawings and calculations with review by Engineer of Record noted on drawings. *32B General (Shts. GP8, Submit calculations and details for vehicle horizontal load at Spandrel and GP9) 2F26B, 2F34, 2F26A, 3F40A, 3F23A, 3F9 and 3F10. *32C General Shts. E103 Submit calculations and details for new bridge location on east side. and A/E201 *32D General Sht. SDI Submit calculations and details for revised anchor bolt size at non- moment base. *32E General Shts. B /D1, Submit calculations and details with review by Engineer of Record for A/D2, B /D3 and A/D5 column covers, including seismic and top slab. *32F General Detail Submit calculations including forces to slab. P66 /MP4 *32G General shts. E102, Submit Spandrel at grids 1.4 and XZ to QQ.3, and grids XZ and 1.4 to E103 and E104 2. ..• • r- .,,.vv 1 — 1 • J. J. ..0 a „ 3.11LLLlL '... \JVLII L:.I '_J .'*0 1.77 Iv 7U7004 /G7/ JOB NAME: Four Story Parking Garage & Bridges RECEIVED CITY OF TIGARD - JOB ADDRESS: Washington Square Mall APR 2 2 2004 BUILDING DEPARTMENT DATE: April 19, 2004 13125 SW HALL BOULEVARD SHEET 4 of 4 CLARK PACIFIC TIGARD, OR 97223 ..41082 STRUCTURAL PLAN REVIEW #4 Building Permit (Clark Pacific Plans dated 4/7/04) BUP 2003 -00700 (Precast/Prestressed Concrete Products, Item #32) Corr. Item Page No. Comments Made No. *32H General Sht. SP1 Submit drawing and calculations for stressing. 33 General Submit one set of reinforcing steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 34 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 35 Structural Structural observation by the structural engineer per Section 1702 is Observation required for moment frame placement and connections and review, with letter, on special inspection per 1701. 36 Special Inspection Special inspection and testing per Section 1701 is required by the soils engineer for concrete auger - cast piles. 37 Special Inspection Special inspection, per Section 1701, under the supervision of a licensed engineer is required for all concrete, reinforcing steel and prestressing strand placement, stressing and grouting of tendons in prestressed concrete, piling, all welding, bolting, anchor bolts, masonry, expansion bolts, screw anchors, adhesive anchors and headed or reinforcing steel concrete shear connections. 38 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the City of Tigard building department. * indicates new item for prestressed and precast concrete products • ** TOTAL PAGE. 05 **