Loading...
Correspondence OFFICE COPY November 2, 2005 �'� OF TIGARD Dan Munn OREGON DLR Group RE: BRIDGE & STAIR TOWER CANOPIES Project Information Building Permit: BUP2005 -00587 Occupancy Type: M Tenant Name: Washington Square Mall Construction Type: IIN Ado' - 7 1585 x ' ”. IiingtonScpiategfkoad Occupant Load: NA The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition; and the State of Oregon Fire Code (OFC) 2004 edition. The submitted plans are approved subject to the following conditions. " pLT 144- tom Special Inspection: Special inspection is required for Structural Welding \& Epoxy Type Anchors. The special inspection agency of record shall furnish inspection reports to the Engineer of Record, Daniel Adam Munn, the General Contractor, Howard S. Wright and the City of Tigard, Building Division, attention Hap Watkins. All discrepancies shall be brought to the immediate attention of the general contractor for correction. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with the approved plans and specifications and the applicable workmanship provisions of the code. 1701.3 OSSC Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all ph4ses of construction. 106.4.2 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Brian Blalock, Senior Plans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772