Loading...
Correspondence FILE Curl (7 40 4111,ii ._. March 18, 2004 CITY OF TIGARD OREGON Todd Ferking DLR Group 421 SW 6 Avenue, Suite 1212 Portland, OR 97204 RE: NEW OPEN PARKING GARAGE @ WASHINGTON SQUARE Project Information Building Permit: BUP2003 -00700 Occupancy Type: S -4 Tenant Name: Washington Square Construction Type: II-FR Address: 9585 SW Washington Square Road Occupant Load: 976 Area: 194,720 Sq Ft Stories: 4 The plan review was performed under the State of Oregon Structural Specialty Code (OS SC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans are approved subject to the following conditions. • Special Inspection: Special inspection is required for items listed in the attached Structural Plan Review #3, items 35, 36& 37. The special inspection agency of record, Carlson Testing, shall furnish inspection reports to the Engineer of Record, Daniel Adam Munn, the General Contractor, Howard S. Wright and the City of Tigard, Building Division, attention Hap Watkins. All discrepancies shall be brought to the immediate attention of the general contractorfor correction. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with the approved plans and specifications and the applicable workmanship provisions of the code. 1701.3 OSSC • Remodeling of the existing Sears & Nordstrom Anchor Buildings to provide openings for the proposed elevated walkways will require separate permits. The submitted • plans with connecting walkways can be approved and constructed prior to the issuance of the remodeling permits. I • Deferred submittals such as Premanufactured Steel Stairs, Precast Concrete Units, Post- tentioned Slabs, Fire Sprinkler, Mechanical Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 it • . . requirements for the structure. The City of Tigard reviews the plans and inspects the structure ' only for compliance with Chapter 11 of the OSSC which may not include all of the requirements of the ADA. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC Certificate of Occupancy: No building or structure shall be used or occupied until the Building Official has issued a certificate of occupancy 109.1 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processin: the documents. Respectful) r 'aiiBl al�- Benior Pr s aminer k Nov. 1. 2004 5 :24PM Shannon & Wilson, Inc. No.6536 P. 2 - III SHANNON taWILSON, INC. GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS lots 54.2004 November 1, 2004 City f Tigard FILE COPY ty Attn: Hap Watkins 13125 SW Hall Blvd • Tigard, Oregon 97223 SPECIAL INSPECTION SERVICES — FOUNDATIONS (PGA PILES) PERMIT NO: BUP 2003 -00700 • OWNER: Macerich Company PROJECT ADDRESS: 9585 SW Washington Square Road PROJECT DESCRIPTION: Washington Square Mall — Phase 1 TYPES OF SPECIAL INSPECTION: Foundations/Soils Dear: Mr. Watkins We have performed Special Inspection Services — Foundations for the Pressure Grouted Auger Piles of the subject project. Observations were accomplished between March 22, 2004 and April 22, 2004 and our Field Memorandums were sent to you. All observations were performed and reported according to industry standards, and to the best of our knowledge, the work was in conformance with the applicable workmanship provisions of the State Building Code and Standards and the recommendations of our final geotechnical report for the project dated • September 19, 2003. • Sincerely, SHANNON & WILSON, INC. aniel E. Hogan, P.E Engineer IV DEH /deh cc: Rick Beason, Macerich Company Dan Clark, HSWCC 2255 S.W. CANYON ROAD PORTLAND. OREGON 9/201.2'19ti 503.223•H14 / FAX 50:1.22 3.0140 www. Sf1.r1nonwiISOi1.COrn 24-1 -03221 -005 Nov. 2. 2004 10:13AM Shannon & Wilson, Inc. No•6540 P. 2 SHANNON &WILSON, INC. GEOTECHNICAL AND ENVIRONMENTAL CONSULTANT S 14 4 9 i 4 4. 7 00, , November 2, 2004 City of Tigard FILE COPT Attn: Hap Watkins 13125 SW Hall Blvd Tigard, Oregon 97223 SPECIAL INSPECTION SERVICES — SOILS/FOUNDATIONS • PERMIT NO: BUP 2003 -00700 OWNER: Macerich Company PROJECT ADDRESS: 9585 SW Washington Square Road PROJECT DESCRIPTION: Washington Square Mall — Phase 1 TYPES OF SPECIAL INSPECTION: Foundations/Soils Dear Mr. Watkins We have performed Special Inspection Services — Soils/Foundations of the subject project. Observations were accomplished between March 22, 2004, and October 14, 2004 and our Field Memorandums were sent to you. All observations were performed and reported according to local standards of practice, and to the best of our knowledge, the work was in conformance with the applicable workmanship provisions of the State Building Code and Standards and the recommendations of our final geotechnical report for the project dated September 19, 2003. Sincerely, SHANNON & WILSON, INC. Daniel E. Hogan, P. . Engineer 1v DEH/deh cc: Rick Beason, Macerich Company Dan Clark, HSWCC 2255 S W CANYON ROAD PORTLAND, OREGON 07201 -2495 503.223.8147 FAX 503 www shannnrrwilson.com 24 -1- 03221 -005 • i • D.LR Group Architecture Engineering Planning Interiors 900 Fourth Avenue, Suite 700 Seattle, WA 98164-1006 October 29, 2004 tel 206/461 -6000 fax 206 -461 -6049 • • seattle @dlrgroup.com www.dlrgroup.com • • FILE COPY City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Re: Project Name: Washington Square Mall — South Garage DLR Project #: 74- 03103 -00 Dear Sirs: Periodic sfructural observations have been performed by our office, deficiencies noted, and have been corrected. • Special inspection reports for inspections performed by Carlson Testing, Inc. have been reviewed. • To the best of our knowledge, this project has been constructed per project plans and specifications. Sincerely, DLR Group yl , u C u p,4 4 , .. PROP t , �.� �G I N `' 'S'p 73263PE \ '` t 4.1 1 0-EGON O � �7F A DAti I., EXPIRES 44°1 1 • Daniel Munn, S.E.. • Principal in the Firm • • Seattle Chicago Colorado Springs Des Moines Farmington Honolulu Kansas City Milwaukee Minneapolis Omaha Orlando Overland Park Philadelphia Phoenix Portland Sacramento Tampa • 1' 1 1 X117 i � , • .;i •I • • CLARK P A C I F I C [11 Architectural, GFRC, Natural Stone, C- CAPPT " and Structural Precast Products it February 4, 2004 City of Tigard Via U.S. Mail 13125 SW Hall Blvd Tigard, Oregon 97223 • Attention: Gary Lampella Building Official Regarding: Washington Square Mall Parking Structure "A° • Clark Pacific Job No. 6004 9585 Washington Square Road Permit Number BUP 2003 -00700 Subject: Approved Fabricator UBC Section 1701.7 Tigard Municipal Code 14.06 Special Inspection Ordinance Section 14.06.080.B.2 Dear Sirs: Clark Pacific has a contract with. Howard S. Wright Construction Company to manufacture at our West Sacramento plant, Precast Prestressed Concrete products for the Washington Square Mall Parking Structure "A °. Production will begin at our plant in West Sacramento, CA in March 2004. UBC Section 1701 requires that the owner provides special inspection for concrete and steel materials manufactured offsite. However, section 1701.7 allows for this inspection to be waived if the plant is classified as an °approved fabricator° by the Building Official. This is also outlined in the Tigard Municipal Code section 14.06.080.B.2. Clark Pacific has been granted this "approved fabricator° status on specific projects in various cities. San Diego, San Francisco, Seattle, .and Pleasanton are the more recent approvals. We have been classified as an "approved fabricator° in the City . of Los Angeles for over 15 years on a continuous basis for all projects. The outlying cities in the Los Angeles area such as Burbank, Santa Monica, and Glendale all recognize the City of Los Angeles approval for work in their cities. I have enclosed materials for documentation of Clark Pacific's qualifications as an "approved fabricator° and copies of the City certificates for your reference. Documentation is attached to qualify for each sub section of section 1701.7. 1701.7.1 QC Manual - We have submitted a copy of our QC Manual. I have attached a copy of our current personnel list with certifications for your reference. 1701.7.2 Approved Inspection Agency — We submit the attached information for Ross Bryan Associates. This agency inspects our plant twice per year for 2 days each visit. Their PCI inspection program is approved by ICBO for use in this section. Their PCI ICBO certification is enclosed. 1701.7.3 Periodic Inspections — I have enclosed our latest PCI inspection report documenting our PCI plant certification granted by PCI based on Ross Bryan Associates' inspection. 1701.7.4 Notification — Clark Pacific agrees to notify the City of any changes to the Manual. We request approval of Clark Pacific as an "approved fabricator° for the City of Tigard. Please provide us with a copy of the City Building OfficialV approval of Clark Pacific as an "approved fabricator° under section 1701.7. Please feel free to contact me with any questions at (916) 371 -0305. Sincerely, fl ak F Thomas Hill Sr Manager of Architectural Finishes And Quality Assurance THIjdr Enclosures 1. 1980 South River Road, West Sacramento, CA 95691 -2817 916/371 -0305 Fax: 916/372.0323 1 359 2 Slover Avenue, Fontana, CA 92337 9 Fax: 909/823 -,1361 j•. Contractor's State License No. 690453 www.clarkpacific.com cc: B. Clark/D. Clark/T. Tucker /K. Hammon/D. Dickerson /C. Durgarian /A. Cruz/J. Marchant/J. Cunningham/M. Silveira/File Howard S. Wright Construction Co. Via Fax: (503) 220 -0892 Ron Edgerton, Rob Kelleher 425 NW 10th Avenue, Suite 200 Portland, Oregon 97209 a , February 2, 2004 LL '; FE.d 0 E OIT/ OF TIG D OREGON Todd Ferking DLR Group 421 SW 6 Avenue, Suite 1212 Portland, OR 97204 RE: NEW OPEN PARKING GARAGE @ WASHINGTON SQUARE Project Information Building Permit: BUP2003 -00700 Occupancy Type: S-4 Tenant Name: Washington Square Construction Type: II -FR ress 9585 SW Washington Square Road Occupant Load: 976 Area: 194,720 Sq Ft Stories: 4 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The following information is required prior to the issuance of a Building Permit. GENERAL A (G 1. Complete and return the enclosed TVF &R, FIRE FLOW and HYDRANT WORKSHEET. 0 1 2. Complete and return the enclosed TVF&R, BUILDING SURVEY REPORT. BUILDING PERMIT - 1. Remodeling of the existing Sears & Nordstrom Anchor Bu' gs to provide openings for t e . ... sed elevated walkways will require sep • - permits. The submitted plans with col - - • _ walkways can be approve a d constructed prior to the issuance of the remode I emits. 2. More than 500 parking spaces are : • ed in the parking structure. Section 1104.1 OSSC requires 10 accessible ing spac - • r the parking structure alone. The scope of this plan review I only cover the are • the parking structure. Seven spaces are indicated . - evel l of sheet Al.0.A. One • -• .ce is indicated on Level 3 of sheet A1.1.A. - ether accessible parking spaces indicat- : on sheet Al.0.A & A1.1.A indi • e the access aisle on the driver side of the par 11 space. Provide 2 additio parking spaces that provide an access aisle on the p -enger side of the rking space as required in section 1104.1 OSSC. 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 SITE PERMIT A Site Permit has not been submitted to date and is required prior to the issuance of a Building Permit. The drawings submitted have adequate detail for the Site Permit plan review. The following corrections are required for the approval/issuance of a Site Permit: // Complete and submit the enclosed "Site Work" Building Permit Application. Please �/ complete the backside of the permit application. The fees for the Site Work permit are based on the valuation of the site work excluding utility work. /2. Submit 4 copies of plan sheets G0.0, G1.0, G3.0 & C1.0 — C4.4. Clarify location of Van Accessible parking spaces. 2 Van accessible spaces are required per section 1104.1 OSSC. 1 4. Detail 5/C2.1 indicates truncated domes, 2 feet. Section 1103.2.3.2 OSSC requires a pattern that is 36 inches wide. Revise the detail. • / 5. Detail 4/C2.1 indicates a flat portion between the sloping side of the detail and indicates see plan. Clarify the width and depth of the flat portion. V LITIES 1. A Site Utilities perm - - - , submitted to date and is required prior to the installation/modi . .. ion of any Site Uti i - -, . lete and Submit the enclosed copy of the. • e Utilities, Plumbing Permit Applicatio___ 2. •mit 2 copies of Site Plumbing Utility plans. Please provide an item by item response letter indicating resolutions to the previous comments. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. FYI The Structural review for the project was sent to your office January 27, 2004 and is not part of this revi,-, letter Respect c+( 'r. :1 .10C. S, Plans Examiner FILE COPY 9 kdoMpe 1(1\ February 2, 2004 CITY OF TIGARD OREGON Todd Ferking DLR Group 421 SW 6 Avenue, Suite 1212 Portland, OR 97204 RE: NEW OPEN PARKING GARAGE @ WASHINGTON SQUARE Project Information Building Permit: BUP2003 -00700 Occupancy Type: S -4 Tenant Name: Washington Square Construction Type: II -FR Address: 9585 SW Washington Square Road Occupant Load: 976 Area: 194,720 Sq Ft Stories: 4 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The following information is required prior to the issuance of a Building Permit. GENERAL 1. Complete and return the enclosed TVF &R, FIRE FLOW and HYDRANT WORKSHEET. 2. Complete and return the enclosed TVF &R, BUILDING SURVEY REPORT. BUILDING PERMIT 1. Remodeling of the existing Sears & Nordstrom Anchor Buildings to provide openings for the proposed elevated walkways will require separate permits. The submitted plans with connecting walkways can be approved and constructed prior to the issuance of the remodeling permits. 2. More than 500 parking spaces are contained in the parking structure. Section 1104.1 OSSC requires 10 accessible parking spaces for the parking structure alone. The scope of this plan review will only cover the area of the parking structure. Seven spaces are indicated on Level 1 of sheet Al .0.A. One space is indicated on Level 3 of sheet A1.1.A. The other accessible parking spaces indicated on sheet Al .0.A & Al .1.A indicate the access aisle on the driver side of the parking space. Provide 2 additional parking spaces that provide an access aisle on the passenger side of the parking space as required in section 1104.1 OSSC. 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 �i . SITE PERMIT A Site Permit has not been submitted to date and is required prior to the issuance of a Building Permit. The drawings submitted have adequate detail for the Site Permit plan review. The following corrections are required for the approval/issuance of a Site Permit: 1. Complete and submit the enclosed "Site Work" Building Permit Application. Please d complete the backside of the permit application. The fees for the Site Work permit are based on the valuation of the site work excluding utility work. ✓ 2. Submit 4 copies of plan sheets G0.0, G1.0, G3.0 & C1.0 — C4.4. 3. Clarify location of Van Accessible parking spaces. 2 Van accessible spaces are required per section 1104.1 OSSC. 4. Detail 5/C2.1 indicates truncated domes, 2 feet. Section 1103.2.3.2 OSSC requires a pattern that is 36 inches wide. Revise the detail. 5. Detail 4/C2.1 indicates a flat portion between the sloping side of the detail and indicates see plan. Clarify the width and depth of the flat portion. SITE UTILITIES 1. A Site Utilities permit has not been submitted to date and is required prior to the installation/modification of any Site Utilities. Complete and Submit the enclosed copy of the Site Utilities, Plumbing Permit Application. 2. Submit 2 copies of Site Plumbing Utility plans. Please provide an item by item response. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. g7 or PAR / OF 1 Rev/6- Respectfully, • Brian Blalock, Senior Plans Examiner FILE COPY 9755 SW Barnes Road Suite 300 • Portland OR 97225 PACIFIC 503.626.0455 Fax 503.526.0775 MEMORANDUM TO: City of Tigard FROM: Monte Higbee, P.E. DATE: 3/05/04 CC: File FILE #: WHP 30773 — Washington Square Expansion RE: Response to Site review comments from the City of Tigard This memo is in response to comments from Brian Blaylock dated 2/2/04. General Response: 1. See attached TVF &R, Fire Flow and Hydrant Worksheets 2. See attached TVF &R, Building Survey Report Building Permit Response: 1. Ok 2. See attached sheets Al.O.A and A1.1.A and revised levels 2 & 4. Sheet Al.O.A, Level 1, shows eight accessible spaces. Level 2 (revised sheet) shows one space with accessible passenger isle. Sheet Al. 1 A, Level 3, shows two spaces. Level 4 (revised sheet) shows one space with accessible passenger isle. There are a total of twelve accessible stalls that have passenger side access isles or that have shared access isles. Site Permit Response: 1. Site Work Building Permit Application was submitted on 2/4/04, along with associated fees. See attached "Received" copy of the permit application. 2. See attached plans (4 sets) 3. See attached sheet C2.0 4. See attached revised detail 5/C2.1 • 5. See attached revised detail 4/C2.1 Site Utilities Response: 1. Site Utility permit application was submitted on 2/4/04 along with associated fees. See attached "Received" copy of the permit application. 2. The site Plumbing Utility plans are exactly the same as the site plans therefore we did not include the two additional sets. Please call if you would still like to have them. I:\Projects\Macerich Company\30773 Wash Sq Expansion \Office \Word \tigard comments(sae) 022704.doc - 1 - -• ;• RECEIVED BILE COPY 2004. FEB 0 s DLR Group February 5, 2004 p CITY OF TIGARD Architecture Engineering Planning Interiors BUILDING DIVISION Brian Blalock 900 Fourth Avenue, Suite 700 Seattle, WA 98164 -1006 • City of Tigard tel 206/461 -6000 13125 SW Hall Blvd. f 206/461 -6049 ' Tigard, OR 97223 seattle@dlrgroup.com www.dlrgroup.com • Re: Project Name: Washington Square Mall Expansion DLR Project #: 7403103 -00 Structural. Plan Review Comments. • .. -• . • Response to Structural Plan Review #1: #031082, dated Jan 21, 2004 1. Stair SG -2 shall be a bidder design deferred submittal item. Engineered design (sealed by • Oregon Civil/ Structural Engineer) will be forwarded to building official per standard deferred submittal process. See revised general notes on sheet 50.1 for clarification. 2. Noted. See, revision on sheet 50.1. 3. See supplemental calculation sheets SC #1 and SC #2 and attached Geotechnical report addendum letter by Shannon and Wilson dated. Nov. 7, 2003. 4. See supplemental calculation Sheets S.0 #3. 5. Clarification. Grade beam along KK.1 from 7 to 7.5 is per standard grade level barrier wall • detail 25/S3.0. No other grade beam is required. 6. CMU structure for elevator machine equipment. Elevator equipment room is constructed per detail 56/S3.1. Isolated /non- bearing wails with separation from garage structure. See supplemental calc. sheet SC #4. 7. Clarification. No P/T at grade:level slab: Note'modified to reference slab -on- grade: See : - • . - . revised sheet S1.0A. 8. See supplemental calculation sheet SC #5. 9. Drawings are modified to indicate. tie spacing = 3 1/2" for moment frame beam-at second _ - - - level on grid line '1' from grids 'PP.1' to 'PP.8', and from grid 'JJ.1' to 'KK.6'. See revised • Sheet S5.1. 10. See supplemental calculation sheet SC #6. 11. See enclosed revised calculations modifying moment frame designs to exclude top - level • frame beams, in-accordance with the design drawings. Calculation pages 269A -277A, • 284A -286A, 290A-301A, '308A, 310A, 311A, 313A, 314A, 330A -338A are provide to replace corresponding calculation pages 269 - 277, 284- 286, 290- 301., 308, 310, 311, 313, ' 314, 330 -338. There are rib resulting changes to the design drawings. V 12. 1997 Uniform Building Code, Section 1630.1.3 states "[P -A effects] shall be evaluated using the forces producing displacements of As." Section 1630.9.1 provides the basis for "Determination of As" as "A static, elastic analysis of the lateral force - resisting system [prepared] using the design seismic forces from Section 1630.2.1." Section 1630. is a reference to the Design Base Shear equations, not increased by the p factor. Likewise, Section 1630.1.1, states that "when calculating drift... p shall be taken equal to 1." Therefore, it would follow that the drift used to calculate the story drift ratio should not be • increased by the p factor. Based on these code references, 'we have not included a p factor • • • - - increase in our evaluation of P -A effects. This approach is confirmed by design examples • included in the SEAOC Seismic Design Manual. Seattle Chicago Colorado Springs Des Moines Farmington Honolulu Kansas City Milwaukee Minneapolis Omaha Orlando Overland Park Philadelphia Phoenix Portland Sacramento Tampa Brian Blalock, City of Tigard • • February 5, 2004 Page 2 13. See enclosed revised calculations 340A to 365A to replace existing. No changes to the drawings are required. 14. Bridges are isolated from existing Sears and Nordstrom buildings with an expansion joint. New opening and floor framing of existing buildings will be included as a separate permit application. 15. See supplemental calculation sheet SC #7 and revised detail 24/S3.4. 16. See supplemental calc. sheet SC #8 and revised plan note on sheet S2.10A for clarification. 17. Detail 12/S3.0 applies to all gravity only columns as noted. 33 and 34 on S3.2 apply to moment frame columns. Design of precast column bases with erection forces will be included with precast deferred submittal. 18. See supplemental calculation sheet SC #9. 19. See supplemental calculation sheet SC #2. 20. See supplemental calculation sheet SC #10. 21. (6) 1 -1/2" diameter A572, Grade 50 threaded rods is correct. 22. See supplemental calculations sheet SC #11. • 23. See revised details on revised Sheet 53.2 for clarification. 24. See revised sheet S3.3, detail 33 for correction. 25. See supplemental calculation sheet SC #12. 26. Anchor bolt design is shown in original calculation submittal on sheets 461 and 462. UBC tables 21 -E and 21 -F bolt valves are used. Edge distance, embedment, and spacing all per requirements of UBC section 2106.2.14.1 thru 2106.2.14.4. 27. See supplemental calculation sheet SC #13. 28. See enclosed supplemental calculation sheet SC #14. 29. Detail 24/S3.4 is revised to standard AISC skewed beam connection with welded top flange , for continuity. See supplemental calculation sheet SC #7. 30. Detail 32/S3.4 has been revised. 6 -3/4" 0 x 6" embed H.S. in lieu of 9 #4 bars. See supplemental calculation sheet SC #15 and revised sheet 53.4. 31. See supplemental calculation sheets SC #16 and SC #17. 32. Will comply. 33. Will comply. 34. Will comply. 35. Will Comply. See added note for "Structural Observations" on revised sheet S0.1. 36. Will Comply. See "Special Structural Inspections" on Structural Notes sheet S0.1. 37. Will Comply. See "Special Structural Inspections" on Structural Notes sheet S0.1. 38. Will Comply. • Respectfully Submitted, DLR Group Daniel Munn StructuralEngineer DM /tmm • FILE copy DLR Group RECEIVED Architecture Engineering Planning Interiors. 900 Fourth Avenue, Suite 700 • • FEB C � Seattle, WA 98164 -1006 • t J tel 206/461 -6000 February 24, 2004 fax 206/461 -6049 CITY OF TIGARD seattle@dlrgroup.com BUILDING DIVISION www.dlrgroup.com • Brian Blalock City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Re: Project Name: Washington 'Square Mall Expansion DLR Project #: 74- 03103 -00 Structural Plan Review Comments Response to Structural Plan Review #2: #031082, dated Feb.. 12, 2004 3. See supplemental calculation sheets SC.2 #1 thru SC.2 #1.9. 4. Details 33 and 34 on Sheet S3.2 will be modified to match supplemental calculation sheet SC• #3. See revised drawings. 10. Supplemental calculation Sheet SC #6 references reinforced steel noted on Moment Frame Elevation Sheet S5.1 at levels 2 and 4. Plan beam .callouts and Elevation Sheet S5.1 will be modified to clarify exact beam reinforcing. (To match original calc. sheet SC #6). 14. See supplemental details 45/S3.4 and 46/S3.4. Supplemental calculation sheets SC.2 #2 and SC.2 #3. 17. See revised details 33 and 34 on Sheet S3.2 for number of anchor clarification. Plan notes and detail cuts added on foundation plan to clarify detailing requirements. See revised drawings. 21. (6) — 1 -1/2" 0 A572 anchors is correct. See revised details 33 and 34 on Sheet S3.2 for clarification. See original supplemental calc. sheet SC #3. 26. See supplemental calculation sheets SC.2 #4 and SC.2 #5 and revised detail 53/S3.3 for correction. 27. See supplemental calculation sheet SC.2 #6 and revised detail 54/S3.3 for correction. Respectfully Submitted, DLR Group Daniel Munn StructuralEngi neer Seattle Chicago Colorado Springs Des Moines Farmington Honolulu Kansas City Milwaukee Minneapolis Omaha Orlando Overland Park Philadelphia Phoenix Portland Sacramento Tampa F 11L�0 P Y haw ilop, I It- February 13, 2004 CITY OF TIGARD OREGON Todd Ferking DLR Group 421 SW 6 Avenue, Suite 1212 Portland, OR 97204 RE: OPEN PARKING GARAGE @ WASHINGTON SQUARE Project Information Building Permit: BUP2003 -00700 Occupancy Type: S -4 Tenant Name: Washington Square Construction Type: II -FR Address: 9585 SW Washington Square Road Occupant Load: 976 Area: 194,720 Sq Ft Stories: 4 Attached is a copy of the 2ND STRUCTURAL REVIEW from the City's consultant. Submit 1 copy of revised drawings and any additional information requested by the consultant for third review. Upon approval of plans, 2 additional sets of drawings with all current revisions will be required. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. • Respect P. y, rian : la1 • •' / Senior ' • n Examiner • 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 FILE COPY hootipia January 27, 2004 t. CITY OF TIGARD OREGON Todd Ferking DLR Group 421 SW 6 Avenue, Suite 1212 Portland, OR 97204 RE: OPEN PARKING GARAGE @ WASHINGTON SQUARE Project Information Building Permit: BUP2003 -00700 ' Construction Type: ? Tenant Name: Washington Square Occupancy Type: S4 Address: 9585 SW Washington Square Road Occupant Load: ? Area: ? Stories: 4 Attached is a copy of the STRUCTURAL REVIEW from the City's consultant. Fire- and Life - Safety aspects of the project have not been reviewed at this time. Submit 1 copy of revised drawings and any additional information requested by the consultant for second review. Upon approval of plans, 2 additional sets of drawings with all current revisions will be required. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respect Bri. Bl,, , Senio ans Examiner • • 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 FILE COPY • JOB NAME: Four Story Parking Garage & Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall BUILDING DEPARTMENT DATE: January 21, 2004 13125 SW HALL BOULEVARD TIGARD, OR 97223 SHEET 1 of 3 031082 STRUCTURAL PLAN REVIEW #1 Building Permit (Plans Date 12/12/2003) BUP 2003 -00700 Corr. Item Page No. Comments Made No. 1 Shts A8.0.A Submit calculations and details for stairs and handrails. A8.1A A8.2A 2 Sht. S0.1 Precast prestressed units. Structural Notes Item number 2. • Engineer required to be registered in the state of Oregon. 3 Shts. S1.0A, S3.0 Submit calculations and detail for concrete auger - cast piles with vertical and lateral load combinations including pile to pile cap interaction. 4 Sht. S3.0 Submit calculations and details for anchor bolts including uplift. Detail 12/S3.0 Sht. S3.2 Details 33 and 34/S3.2 5 Sht. S1.0A Submit calculations and details for grade beam at grid KK.1 between grids 7 and 7.5 6 Sht. S1.0A Submit calculations and details for building at grid 7 between grids JJ.1 and KK.1. 7 Sht. S1.0A Submit calculations and details for PIT slab at grids 5.5 to 6.0 and grids SS to TT. 8 Shts. S2.0A and Submit calculations and details for methods used to transfer lateral S2.1A loads from all parts of diaphragm to moment frame. 9 Sht. S5.1 Clarify ties at second level between grids PP1 and PP8. Calculations Detail 21/S5.1 note 3W o.c. Drawing notes 4" o.c. 10 Sht. S5.1 Submit calculations and details for coupling of moment frames at Detail 31/S5.1 grids 4 to 5.5. 11 Sht. S5.1 Submit calculations without moment frame beam at top level. Details 31/S5.1 and 51/S5.1 12 Calculations Page Submit calculations with "Rho" Factor. 204 through 207 13 Calculations for Clarify column reinforcing steel. Calculations note more reinforcing Concrete Columns bars then note on drawings. . JOB NAME: Four Story Parking Garage & Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall BUILDING DEPARTMENT DATE: January 21, 2004 13125 SW HALL BOULEVARD TIGARD, OR 97223 SHEET 2 of 3 031082 STRUCTURAL PLAN REVIEW #1 Building Permit (Plans Date 12/12/2003) BUP 2003 -00700 • Corr. Item Page No. Comments Made No. 14 Sht. 52.10A Submit calculations and details at framing to existing building. Bridge 1 and 2 15 Sht. 52.10A Submit calculations and details for sloped steel member connection Bridge 1 and 2 to W36 x 150 and W36 x 210. 16 Sht. 52.10A Clarify detail 32/S3.4 at precast column. Bridge 1 17 Sht. S3.0 Clarify detail 12/S3.0 and details 33 and 34/S3.2. Detail 12/S3.0 18 Sht. S3.0 Submit calculations for wall with impact loading. Detail 25/S3.0 19 Sht. S3.0 Submit calculations for pile reinforcing steel embedment considering Detail 26/S3.0 uplift. 20 Sht. S3.1 Submit calculations for detail. Detail 55/S3.1 21 Sht. S3.2 Clarify anchor bolt number. Details 33 and 34 22 Sht. S3.2 Submit calculations for connection of steel tube to steel plate and Detail 54/S3.2 anchor bolts. 23 Sht. S3.2 Clarify 7 x 4 x % angle. Detail 54 and 55/S3.2 24 Sht. S3.3 Submit calculations and details for slab shrinkage. Detail 33/S3.3 25 Sht. S3.3 Submit calculations and details for horizontal load. • Detail 51/S3.3 26 Sht. S3.3 Submit calculations for connections including edge distance. • Details 44 and 53/S3.3 27 Sht. S3.3 Submit calculations for expansion anchor with load at end of anchor. Detail 54/S3.3 JOB NAME!* Four Story Parking Garage & Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall BUILDING DEPARTMENT DATE: January 21, 2004 13125 SW HALL BOULEVARD TIGARD, OR 97223 SHEET 3 of 3 "031082 STRUCTURAL PLAN REVIEW #1 Building Permit (Plans Date 12/12/2003) BUP 2003 -00700 Corr. Item Page No. Comments Made No. 28 Sht. S3.4 Submit calculations for connection, including bending, for guardrail to Detail 21 and angle in concrete. 22/S3.4 29 Sht. S3.4 Submit calculations and details for connections of bent plate. Detail 24/S3.4 30 Sht. S3.4 Submit calculations for 9 - #4. Detail 32/S3.4 31 Sht. S3.4 Submit calculations with truck loading. Detail 42/S3.3 32 General Reviewed and initialed deferred submittals shall be submitted to the City of Tigard for precast concrete, post- tensioned slabs, signs, and stairs 60 days before delivery to job site. 33 General Submit one set of reinforcing steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 34 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 35 Structural Structural observation by the structural engineer per Section 1702 is Observation required for moment frame placement and connections and review, with letter, on special inspection per 1701. 36 Special Inspection Special inspection and testing per Section 1701 is required by the soils engineer for concrete auger — cast piles. 37 Special Inspection Special inspection, per Section 1701, under the supervision of a licensed engineer is required for all concrete, reinforcing steel and prestressing strand placement, stressing and grouting of tendons in prestressed concrete, piling, all welding, bolting, anchor bolts, masonry, expansion bolts, screw anchors, adhesive anchors and headed or reinforcing steel concrete shear connections. 38 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the City of Tigard building department. FEB 12 2004 11:39 AM FR MILLER CONSULTNG ENG246 1395 TO 5036847297 P.02 • • .JOB.NAME: Four Story Parking Garage & Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall BUILDING DEPARTMENT DATE: February 12, 2004 13125 SW HALL BOULEVARD TIGARD, OR 97223 SHEET 1 of 4 031082 STRUCTURAL PLAN REVIEW #2 Building Permit (Plans Date 02/04/04) BUP 2003 -00700 Corr. Item Page No. Comments Made No. 2/12/04 1 Shts A8.0.A Submit calculations and details for stairs and handrails. A8.1A Note: Deferred Submittal A8.2A 2/12/04 2 Sht. S0.1 Precast prestressed units. Structural Notes Item number 2. Engineer required to be registered in the state of Oregon. 3 Shts. S1.0A, S3.0 Submit calculations and detail for concrete auger - cast piles with vertical and lateral load combinations including pile to pile cap interaction. Note: Submit calculations with lateral loads from analysis distributed to piles at moment frames including shear and axial loads. Conflict between soils report values and lateral load analysis. 4 Sht. S3.0 Submit calculations and details for anchor bolts including uplift. Detail 12/S3.0 Note: Details in conflict with calculations Sht. S3.2 Details 33 and 34/S3.2 2/12/04 5 Sht. S1.0A Submit calculations and details for grade beam at grid KK.1 between grids 7 and 7.5 2/12/04 6 Sht. S1.0A Submit calculations and details for building at grid 7 between grids JJ.1 and KK.1.. 2/12/04 7 Sht. S1.0A Submit calculations and details for P/T slab at grids 5.5 to 6.0 and grids SS to TT. 2/12/04 8 Shts. S2.0A and Submit calculations and details for methods used to transfer lateral S2.1A loads from all parts of diaphragm to moment frame. 2/12/04 9 Sht. S5.1 Clarify ties at second level between grids PP1 and PP8. Calculations Detail 21/S5.1 note 3' /z" o.c. Drawing notes 4" o.c. 10 Sht. S5.1 Submit calculations and details for coupling of moment frames at grids Detail 31/S5.1 4 to 5.5. Note: Calculations in conflict with plans and concrete beam schedule. FEB 12 2004 11:40 AM FR MILLER CONSULTNG ENG246 1395 TO 5036847297 P.03 .JOB. NAME: Four Story Parking Garage & Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall BUILDING DEPARTMENT DATE: February 12, 2004 13125 SW HALL BOULEVARD TIGARD, OR 97223 SHEET 2 of 4 • 031082 STRUCTURAL PLAN REVIEW #2 Building Permit (Plans Date 02/04/04) BUP 2003 -00700 • Corr. Item Page No. Comments Made No. 2/12/04 11 Sht. S5.1 Submit calculations without moment frame beam at top level. Details 31/S5.1 and 51/S5.1 2/12/04 12 Calculations Page Submit calculations with "Rho" Factor. 204 through 207 2/12/04 13 Calculations for Clarify column reinforcing steel. Calculations note more reinforcing Concrete Columns bars then note on drawings. 14 Sht. S2.10A Submit calculations and details at framing to existing building. Bridge 1 and 2 Note: Details for C12 x 20.7 connections. 2/12/04 15 Sht. S2.10A Submit calculations and details for sloped steel member connection to Bridge 1 and 2 W36 x 150 and W36 x 210. 2/12/04 16 Sht. S2.10A Clarify detail 32/S3.4 at precast column. Bridge 1 17 Sht. S3.0 Clarify detail 12/S3.0 and details 33 and 34/S3.2. Detail 12/S3.0 Note: Calculations in conflict with plans. No difference noted on plans. 2/12/04 18 Sht. S3.0 Submit calculations for wall with impact loading. Detail 25/S3.0 2/12/04 19 Sht. S3.0 Submit calculations for pile reinforcing steel embedment considering Detail 26/S3.0 uplift. 2/12/04 20 Sht. S3.1 Submit calculations for detail. Detail 55/S3.1 21 Sht. S3.2 Clarify anchor bolt number. Details 33 and 34 Note: Details in conflict with plans and calculations. 2/12/04 22 Sht. S3.2 Submit calculations for connection of steel tube to steel plate and Detail 54/S3.2 anchor bolts. 2/12/04 23 Sht. S3.2 Clarify 7 x 4 x'/ angle. Detail 54 and 55/S3.2 2/12/04 24 'Sht. S3.3 Submit calculations and details for slab shrinkage. Detail 33/S3.3 FEB 12 2004 11:40 AM FR MILLER CONSULTNG ENG246 1395 TO 5036847297 P.04 • • JOB. NAME: Four Story Parking Garage & Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall BUILDING DEPARTMENT DATE: February 12, 2004 13125 SW HALL BOULEVARD TIGARD, OR 97223 SHEET 3 of 4 031082 STRUCTURAL PLAN REVIEW #2 Building Permit (Plans Date 02/04/04) BUP 2003 -00700 • Corr. Item Page No. Comments Made No. 2/12/04 25 Sht. S3.3 Submit calculations and details for horizontal load. Detail 51/S3.3 26 Sht. S3.3 Submit calculations for connections including edge distance. Details 44 and Note: Reduced value for tension. 53/S3.3 27 Sht. S3.3 Submit calculations for expansion anchor with load at end of anchor. Detail 541S3.3 Note: Detail method used to keep pipe from bearing on anchor and how load is transferred to shear. Provide calculations for CMU bearing at pipe. 2/12/04 28 Sht. S3.4 Submit calculations for connection, including bending, for guardrail to Detail 21 and 22/S3.4 angle in concrete. 2/12/04 29 Sht. S3.4 Submit calculations and details for connections of bent plate. Detail 24/S3.4 2/12/04 30 Sht. S3.4 Submit calculations for 9 - #4. Detail 32/S3.4 2/12/04 31 Sht. S3.4 Submit calculations with truck loading. Detail 42/S3.3 32 General Reviewed and initialed deferred submittals shall be submitted to the City of Tigard for precast concrete, post- tensioned slabs, signs, and • stairs 60 days before delivery to job site. 33 General Submit one set of reinforcing steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 34 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 35 Structural Structural observation by the structural engineer per Section 1702 is Observation required for moment frame placement and connections and review, with letter, on special inspection per 1701. 36 Special Inspection Special inspection and testing per Section 1701 is required by the soils engineer for concrete auger - cast piles. 37 Special Inspection Special inspection, per Section 1701, under the supervision of a licensed engineer is required for all concrete, reinforcing steel and prestressing strand placement, stressing and grouting of tendons in prestressed concrete, piling, all welding, bolting, anchor bolts, FEB 12 2004 11:40 AM FR MILLER CONSULTNG ENG246 1395 TO 5036847297 P.05 JOB. NAME: Four Story Parking Garage & Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall BUILDING DEPARTMENT DATE: February 12, 2004 13125 SW HALL BOULEVARD 'TIGARD, OR 97223 SHEET 4 of 4 031082 STRUCTURAL PLAN REVIEW #2 Building Permit (Plans Date 02/04/04) BUP 2003 -00700 • Corr: Item Page No. Comments Made No. masonry, expansion bolts, screw anchors, adhesive anchors and headed or reinforcing steel concrete shear connections. 38 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the City of Tigard building department. ** TOTAL PAGE. 05 ** FEB 26 2004 4:53 PM FR MILLER CONSULTNG ENG246 1395 TO 5036847297 P. 02/04 JOB NAME: Four Story Parking Garage & Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall BUILDING DEPARTMENT DATE: February 26, 2004 13125 SW HALL BOULEVARD SHEET 1 of 3 TIGARD, OR 97223 031082 STRUCTURAL PLAN REVIEW #3 Building Permit (Plans Date 02/23/04) BUP 2003 -00700 Corr. Item Page No. Comments Made No. 2/12/04 1 Shts A8.0.A Submit calculations and details for stairs and handrails. A8.1A Note: Deferred Submittal A8.2A 2/12/04 2 Sht. S0.1 Precast prestressed units. Structural Notes Item number 2. Engineer required to be registered in the state of Oregon. 2/26/04 3 Shts. S1.0A, S3.0 Submit calculations and detail for concrete auger - cast piles with vertical and lateral load combinations including pile to pile cap interaction. Note: Submit calculations with lateral loads from analysis distributed to piles at moment frames including shear and axial loads. Conflict between soils report values and lateral load analysis. 2/26/04 4 Sht. S3.0 Submit calculations and details for anchor bolts including uplift. Detail 12/S3.0 Note: Details in conflict with calculations Sht. S3.2 Details 33 and 34/S3.2 2/12/04 5 Sht. S1.OA Submit calculations and details for grade beam at grid KK.1 between grids 7 and 7.5 2/12/04 6 Sht. S1.0A Submit calculations and details for building at grid 7 between grids JJ.1 and KK.1. 2/12/04 7 Sht. S1.0A Submit calculations and details for P/T slab at grids 5.5 to 6.0 and grids SS to TT. 2/12/04 8 Shts. S2.0A and Submit calculations and details for methods used to transfer lateral S2.1A loads from all parts of diaphragm to moment frame. 2/12/04 9 Sht. S5.1 Clarify ties at second level between grids PP1 and PP8. Calculations Detail 21/S5.1 note 3 %" o.c. Drawing notes 4" o.c. 2/26/04 10 Sht. S5.1 Submit calculations and details for coupling of moment frames at grids Detail 31/S5.1 4 to 5.5. Note: Calculations in conflict with plans and concrete beam schedule. 2/12/04 11 Sht. S5.1 Submit calculations without moment frame beam at top level. Details 31/S5.1 and 51/S5.1 2/12/04 12 Calculations Page Submit calculations with "Rho" Factor. 204 through 207 FEB 26 2004 4:54 PM FR MILLER CONSULTNG ENG246 1395 TO 5036847297 P.03/04 . JOB NAME: Four Story Parking Garage & Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall BUILDING DEPARTMENT DATE: February 26, 2004 13125 SW HALL BOULEVARD SHEET 2 of 3 TIGARD, OR 97223 031082 STRUCTURAL PLAN REVIEW #3 Building Permit (Plans Date 02/23/04) BUP 2003 -00700 • Corr. Item Page No. Comments Made No. 2/12/04 13 Calculations for Clarify column reinforcing steel. Calculations note more reinforcing Concrete Columns bars then note on drawings. 2/26/04 14 Sht. S2.10A Submit calculations and details at framing to existing building. Bridge 1 and 2 Note: Details for C12 x 20.7 connections. 2/12/04 15 Sht. S2.10A Submit calculations and details for sloped steel member connection to Bridge 1 and 2 W36 x 150 and W36 x 210. 2/12/04 16 Sht. S2.10A Clarify detail 32/S3.4 at precast column. Bridge 1 2/26/04 17 Sht. S3.0 Clarify detail 12/S3.0 and details 33 and 34/S3.2. Detail 12/S3.0 Note: Calculations in conflict with plans. No difference noted on plans. 2/12/04 18 Sht. S3.0 Submit calculations for wall with impact loading. Detail 25/S3.0 2/12/04 19 Sht. S3.0 Submit calculations for pile reinforcing steel embedment considering Detail 26/S3.0 uplift. 2/1 2/04 20 Sht. S3.1 Submit calculations for detail. Detail 55/S3.1 2/26/04 21 Sht. S3.2 Clarify anchor bolt number. Details 33 and 34 Note: Details in conflict with plans and calculations. 2/12/04 22 Sht. S3.2 Submit calculations for connection of steel tube to steel plate and Detail 54/S3.2 anchor bolts. 2/12/04 23 Sht. S3.2 Clarify 7 x 4 x 1 /4 angle. Detail 54 and 55/S3.2 2/12/04 24 Sht. S3.3 Submit calculations and details for slab shrinkage. Detail 33/S3.3 2/12/04 25 Sht. S3.3 Submit calculations and details for horizontal load. Detail 51/S3.3 2/26/04 26 Sht. S3.3 Submit calculations for connections including edge distance. Details 44 and Note: Reduced value for tension. 53/S3.3 FEB 26 2004 4:54 PM FR MILLER CONSULTNG ENG246 1395 TO 5036847297 P.04/04 • , JOB NAME: Four Story Parking Garage 8 Bridges CITY OF TIGARD JOB ADDRESS: Washington Square Mall BUILDING DEPARTMENT DATE: February 26, 2004 13125 SW HALL BOULEVARD TIGARD, OR 97223 SHEET 3 of 3 • 031082 STRUCTURAL PLAN REVIEW #3 Building Permit (Plans Date 02/23/04) BUP 2003 -00700 • Corr. Item Page No. Comments Made No. 2/26/04 27 Sht. S3.3 Submit calculations for expansion anchor with load at end of anchor. Detail 54/S3.3 Note: Detail method used to keep pipe from bearing on anchor and how load is transferred to shear. Provide calculations for CMU bearing at pipe. 2/12/04 28 Sht. S3.4 Submit calculations for connection, including bending, for guardrail to Detail 21 and 22/S3.4 angle in concrete. 2/12/04 29 Sht. S3.4 Submit calculations and details for connections of bent plate. Detail 24/S3.4 2/12/04 30 Sht. S3.4 Submit calculations for 9 - #4. Detail 32/S3.4 2/12/04 31 Sht. S3.4 Submit calculations with truck loading. Detail 42/S3.3 32 General Reviewed and initialed deferred submittals shall be submitted to the City of Tigard for precast concrete, post- tensioned slabs, signs, and stairs 60 days before delivery to job site. 33 General Submit one set of reinforcing steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 34 General Submit one set of miscellaneous steel shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 35 Structural Structural observation by the structural engineer per Section 1702 is Observation required for moment frame placement and connections and review, with letter, on special inspection per 1701. 36 Special Inspection Special inspection and testing per Section 1701 is required by the soils engineer for concrete auger — cast piles. 37 Special Inspection Special inspection, per Section 1701, under the supervision of a licensed engineer is required for all concrete, reinforcing steel and prestressing strand placement, stressing and grouting of tendons in prestressed concrete, piling, all welding, bolting, anchor bolts, masonry, expansion bolts, screw anchors, adhesive anchors and headed or reinforcing steel concrete shear connections. 38 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the City of Tigard building department. ** TOTAL PAGE. 04 **