Loading...
Plans . 1 t ^ innutbdtiPlakillMIMPIMIPM110111111 " CO q 1 '%iq N1 c c c c c c' �. s) c c c c c c , ° O CO Gp Cp 4 mik r _iii r 0: _ T . I - -h. I IIIIIII . II 1 19 C ? 20 0 -' .• - 1 41 Wilb 4 47, W /�i�- 7 _1 - ii - - •■ ■ 6 __ - _--- - P - I th 0 18 4 ^ N l G O 14 (- 8ETL pL m a o o - SOUTH SITE g_. CJMPOSITE UTILITY PLAN 1 SCALE: 1 20' C4.0 sgS S. (4) . W 4- )IQ 6_ S Q • . . 1 c/# -4 7 C • 8EI/ 3, 3 /s/ott LX SU MH 11 INSTALL A "RELINER" INSIDE DROP BOWL & DOWN PIPE. IE 8" IN= 219.64 (NW) 1 EX IE OUT = 196.5± (W) V CURB • REMOVE AND DISPOSE OF EXISTING 12" SD LINE IN ITS ENTIRETY AS SHOWN. ® STORM LINE IS TO REMAIN IN SERVICE. COORDINATE W/ STRUCTURAL & ARCHITECTURAL PLANS TO ENSURE PIPE IS PROTECTED. 023 PROTECT EXISTING CATCH BASIN. IN POINTS. ® EX SD MH JATION. RIM= 220.94 MIN. TO EX IE 36" IN= 190.60 )W EX IE 42" OUT = 190.10 CONNECT PARKING STRUCTURE 12" SD TO EXISTING MANHOLE. IE= 214.90, INSTALL INSIDE DROP IN MANHOLE. CONNECT FOUNDATION DRAIN FROM BASEMENT WALL FOUNDATION. SEE SHEETS P1.O.A AND S3.0. 16 INSTALL 59 LF 3 SD CO S= 0.0200 MIN. SEE PLUMBING PLANS FOR CONTINUATION. IE =2.5' BELOW EXISTING GRADE. 23 INSTALL STANDARD CLEANOUT PER DETAIL 5/C4.3. 18 CONNECT 4" SD FROM OIL /WATER 3= 0.0837. SEPARATOR @ S= 0.0200 MIN. CONTRACTOR TO VERIFY EXISTING PIPE DEPTH. SEE SHEET P1.0.A FOR PLUMBING PLA k . 19 INSTALL 4 ABS PERFORATED PIPE, WITH FILTER SOCK, ALONG THE BASEMENT WALL FOUNDATION. SLOPE PERF. PIPE @ 0.5090 TO 4" SOLID ABS PIPE (SEE NOTE 20). 20 INSTALL 4" ABS SOLID PIPE AS SHOWN. CONNECT PIPE TO EXISTING MANHOLE CD MINIMUM SLOPE OF 0.502 • 7, 1 • a N PROVIDE IMPERVIOUS MATERIAL IF SLAB IS NOT PRESENT : II `dt e FLOOR SLAB OR GROUND BASEMENT WALL OR I CANTILEVER RETAINING WALL r l %' 5 Ea CLEAN (NOT MORE THAN 2% II F^s PASSING NO. 200 SIEVE BASED RANDOM =s BACKFILL �°' 1 ON WET SIEVE ANALYSIS) (1) (2) ® '� .�� -� FINE TO MEDIUM SAND (1) 2 3' MIN.`" " ` frfti III 1 FLOOR SLAB OR GROUND 1 I ttiwo,R,- : . 4" PERFORATED , ^ t : " :':, rD °,z fi N PIPE WITH FILTER SOCK (3) I NOTES: (1) COMPACT RANDOM BACKFILL AND CLEAN SAND TO 90 PERCENT OF THE MODIFIED PROCTOR MAXIMUM DRY DENSITY (ASTM D1557). I RANDOM FILL MATERIALS SHALL BE PROPERLY MOISTURE CONDITIONED SUCH THAT MOISTURE CONTENT IS WITHIN 2 PERCENT OF OPTIMUM MOISTURE CONTENT (2) RANDOM BACKFILL SHALL CONSIST OF: I SAND AND /OR GRAVEL EXCAVATED ON -SITE MATERIAL FREE OF ORGANIC AND DELETRIOUS MATERIAL ` ! ED I (3) PERFORATED PIPE SURROUNDED BY A 6 -INCH ENVELOPE OF 1.5 -INCH MINUS CRUSHED ROCK GEI MAY BE USED IN LIEU OF FILTER PIPE & 1 *1‘ I MAR G\i\( 0, 11GA ON gvILp1NG p���S I Washington Square Mall - Phase I I Tigard, Oregon - BACKFILL & DRAINAGE DETAILS September 2003 24 -1- 03221 -003 SHANNON & WILSON, INC. FIG. and Environmental Consultants FIG. 2' loa s • .. ,.. .. „- J., • •,,.. . , -•.,..••:--....• — ,,,... , . .. . . _„ ‘. .......,.., . . „,. . - : • I IW DLR Group -.. Calculations • •• Date /52_ (26/0 4 • -- • mpu Subject ted Checked Project Narne f 4 c q __ re .> Project Number o l s z_ ----/ 4._ a 3 to 3 - c2 0 Page (of pages) 48, 6 .0 2- - 3 >lis&L. . G a * co -* g . ' :,: el,34/ 9,11341 g,,226,4 R." 4 3 s,11341 10,340 290 t , 0--- 3„ , 1 . : • I. .; • ', c` - ..)421.. .e‘8. • ,' .44-rug 12 // 1:700* 5, so 4/ - 1 - 7,55o 41 NEw NEw , kEw ...., A I E iAl 12 • 1.6Z , • I S i; • -, 6 - 7 1 g is 4/ ,J,/ s000 ill /5 _ R Av.43z . • (120,350 iii) c /v6vu 4- cx•.st:1/4-t. —I 1(-2 AU.ouis , 'To tat. Po-DP areei 8 0, 3o0 41 p I 2' 0 1.5 L MEL..1 + gki sh @ 2' /Lir / 20, '3 co ril - 7 - 17.1.e t-2 A (low 5 11 8, 400 iti for- 150 i% & 2 lbw • - E. • . kECEI\I Isl■PA 4164 • • • -1•\GNRD i O w{ C). s‘00 • i ON i A . I • • . . I 1 ® DLR Group Calculations 0 Subject 5_Ki_ns^ „.rax e_ C ^_ _thA Z �9� �`(L. `� o oy Computed o� N V n � ( 1 Checked Mho F \G N Project Name . .. 1 c ,. 011 NG o1v1s1� Project Number o !- P • 7 - 1 0 2 -„ BV 0 • Page (of pages) 2 ... ■o0 4 $ zonorig 8,610 ttg .. - troop 200. -i7,00 41 ii , AP ; w . 1%400 tit , i. - • Gc7 co LA (8 6 If. iy 8 ; ' 1 400rb(g@�y @/ 199390 ., • : • • • 3 0 ` ,L76.00 43 5 14 . g 11 t •4400 d 1 a @ t; 6�@ 0 So, /90 4 . P2 "@ 2% ®. • • • • A • GAS & WATER TIGHT THREADED PVC CAP NON— SHRINK GROUT STANDARD CAST IRON FRAME AND COVER STANDARD MANHOLE GRADE RING A wow. • 116 4" MIN. Nor e / N Z FINISH A wow. 111 a ' o v / 1 • •'/ , •••-. ° o ` • e• ,; • •; v ° PROVIDE 3/4 0 FOR A • .a.00 MINIMUM OF 6" AROUND ° CLEANOUT • d i �;;• ° , , • . e :. •G �D a_. - • G° • • • NOTE-` o . ..CI' . . • I. ° : , ". ; , - \ \O':; CONCRETE ENCASED • 3/4 " - 0 BOTTOM OF WYE FOR PLASTIC PIPE 3/4 - 0 R E o a • NOTE: CONCRETE ENCASE ENTIRE WYE SECTION AND 45 BEND IF CONCRETE PIPE A AR 2O Y Of \G S'0 STANDARD CLEANOUT guILD SCALE: N. T S. C. W.S. DRAWING N0. 150 °/58 kJo -4 , Sd , Rol P L frt 2 - o cro . 49 • • w New =... :nine maim, 11"111M,..alt mom= ..) WATER METER PLAN VALVE BOX • I 1 11 • j ( j l \ , , l en L . �/� \� \ 1'1 \ `% \ %\ TEST COCKS (4) �j / � . 1:11:4111111101111: MIN \ j, I IN VERTICAL \� �.1 . , POSITION (TYP) 8 MIN WATER METER rn 12" - .A MIN G - 41M , i SHUT OFF VALVE 40311 411Ar Wring�,� . 0 � 4 , ; mo w , � � ' ••, - e, . , , • 4" CLEAN CRUSHED ROCK BASE • • ELEVATION • 1. VALVE BOX SHOWN IS APPROX 15 "W X22 "L X12 "D WITH 12 "D EXTENSION. 2. DOUBLE CHECK ASSEMBLY MUST HAVE A SHUT OFF VALVE ON THE INLET SIDE. 3. UNIONS ARE REQUIRED AT EACH END OF ASSEMBLY IF USING METALLIC PIPING. 4. ASSEMBLY MUST BE INSTALLED SO THE TEST COCKS ARE VERTICAL. 5. NON - CORROSIVE CAPS OR PLUGS MUST BE INSTALLED ON TEST COCKS. 6. ADJACENT GRADE MAY NOT DRAIN SURFACE WATER INTO THE VALVE BOX. 7. SERVICE PIPING MUST BE A MIN 24" BELOW GRADE. NO SCALE BUILDING awSON IRRIGATION DOUBLE CHECK HAP . o „, dr y , � q l b (,a 13125 S.W. KAU. BLW. an =� f VALVE ASSEMBLY 9 -13 01 TIGARD