SDR12-79 POOR QUALITY RECORD
PLEASE NOTE: The original paper record has been archived and
put on microfilm. The following document is a copy of the
microfilm record converted back to digital. If you have questions
please contact City of Tigard Records Department.
p •
'�I r
HAtiLB=RG OFFICE, 6O LL SDR l'2,,=�� I _
j
' Hunziker Road 'at 7S� id A,venq,er t ' k,
' 1 6 I OF 2,,,,
, ,, ,
.. . 1 1 ,
, , ,
, ,
, ,
, ,
. 4 . ■•• I , , , , ,
�r ,...a,r �„r�r� r r.,>,,,.,.-a ..,..c .M.,., .w..S...,,r-,.r ,w n,. ,. ....�.,�_,.r4 •,.r,.,..um,.._,..r..,,,.tm .•.....x.r1....,...,,x.. x'nnr r,:.
5t
,
C
C
F.
I
,,,,'ra
•
•
•
•
,
•
f
u o
4 i.
,.
ii [ ,
•
•
1 iI
•
•
r
f
i•
•
•
,, t ' • , r
i
RECEvEt
• v, 4,4 •t SAY 7-
„.!T'IGAFRD ''
Y,,Un r CITY OF TIGARD
• t ur TIGARD
NCO t.0M Alto 0
P.O. Box 23397
12420 S.W. Main
Tigard,Oregon 9722;3' V
s,AY r)
May 2, 1979 1979
HALLBFm
M ;
Hallberg Homes
1710 N.E. 82nd
Portland, Oregon 97220
Re: SDR 12-79 - Hallberg Office Complex
Dear Sirs
Please be advised that the Planning Director on April 30, 1979 approved
your request for site plan and architectural review of the above referenced
project.
This approval is subject to the following conditions:
1. That the applicant sign a nonrsmonstra.nce agreement for future street
improvements to Hunziker Road.
2. No changes will be made to approved plans or specifications unless
formal application is made to the appropriate department and changes
• are approved by that department. Application for changes will be made
in writing and shall include applicable drawings, engineering
specifications and other details requested by the department. No con-
struction shall take place in these instances until after the changes
have been approved. Any deviation from this condition will result in
the immediate posting of a stop work order on the project or any portion
of the project.
If we can be of any further assistance, please do not hesitate to contact this
office at 639-4171.
S iric�e�, ;
/2Wer2_,,Li
ilary 1ackensie
cc: Harry Newton & Assoc. Assistant Planner
HH/p j t
�� m the City tea
i ' � g acknowledgment
fourteen (14) days of��your t must be received y th City Ti �rd.� within
�flT�: The follow�.n ack d men ce1 d b
y n by the City . .
y receipt of this letter: Fai to return this
acknowledgment may result in actio y y of Tigard,
I hereby ac1':riowledge this letter documenting the action of the Tigard Planning Dept.
received and g and 1 agree o documented and
.
I have ree: dread this letter: an' grey to the decxs:� �c here. d ,.
to a •.e by any terms ,rndfor conditions attacbcd..
lett_ s45:1
f
e
na tt�r e Dtu
HARRY NEWTON & ASSOATES
architects & planners • 646-7129 10700 s. w, beaverton highway • suite # 11 0 beaverton, Oregon 97005
April 25, 1979
A;77179
Planning Department
City of Tigard CITY OF TIGARD •
12420 S. W. Main Street
Tigard, Oregon 97223
• ' ' Attention: Hillary McKenzie
Subject: Hallberg Office Complex Staff Report April 3, 1979
Deer Ms. McKenzie:
In reference to the Design Review Staff Report of the Hallberg
Office Complex we would like to request that the landscaping in
the parking area remain as submitted in order that we can main-
.
tain the maximum number of parking areas. It is our feeling that
an office complex of this nature needs more than -he required
number of parking areas. We would also like to point out that •
the landscape plan indicates an excellent combination of plant-
ing in relation to the buildings and the site, and we feel that
• to leave the parking area as it is will in no way detract from
the project.
We plan to replace the missing arborvitae hedge on the South prop-
erty line with one of the fotina varieties which should give us a
sight-obscuring hedge very quickly. Apparently the existing hedge,
as well as many of the other plants which were to have been reused
• in the new landscaping plan, were removed by County personnel; how-
,
ever, it is the intention of the Own0r to replace these.
I am enclosing letters covering the other subjects which We dis-
cussed last week.
•
Ver truly yours,
• Harry Cia Newton, A.I.A.
HCN/dk
Enc. : Letters from Oeorge Otten and from Hallberg Homes, Ince
•
CC! Hallberg Homes, Inc.
•
, .
HALLBERG HOMES, IN 1714 N.E. 92nd AVENUE
PORTLAND, OREGON 97220
PHONE 252-2455
April 20, 1979 APR
City of Tigard PLI ?F TI GAR �
12420 SW Main Street r
Tigard, Oregon 97 223
Re: 751. 0 SW Hunziker Road
Attn: Planning�� Dept.
.
Gentlemen:
We propose to water the landscaping on the subject site with
garden hose and sprinkler and we choose this method as opposed
to an underground system for several reasons.
Since we will be the owner operator furnishing full service
space to our tenants we will have personnel on site a great .deal
of the time. This allows us to attend to sprinkling while doing
other things. It is also our experience with other commercial
properties we now own and manage and that do have underground
systems that the cost of maintenance far exceeds the old fashioned
hose system. Vandalism has caused us to abandon the underground
system at one complex. Finally, it is much less expensive to
�
provide f acilat ZeS for manual irrigation a s co m pa red to under g round.
We hope this answers the questions you have expressed concerning
irrigation.
Sincerely,
HALLBERG HOMES, INC.
•
Richard P. Reiver
}
e i
•
HALLBERG HOMES, INC.
1710 N.E. 82nd AVENUE
PORTLAND, OREGON 97220
NOSE •
PHONE 252-2456
1 April 20, 1979
• APR /979
City of Tigard C1Ty ki
12420 SW Main Street i-A
Tigard, Oregon 97223 DEFT®
,•
I I
Re: 7540 SW Hunziker Rd.
Attn: Planning Dept.
0 Gentlemen:
This letter is to confirm to you that as the owner of the
subject property we would not object in any future participation
in an LID for improvements to Hunziker Road. In fact we would
be in favor of said improvement using the LID Bancrofted concept.
We would be opposed to any design that would remove the two
accesses to our property as these are vital.
Finally we question the need for any improvements as we understand
• • . the State of Oregon proposes some change to the land they own
between our property and the existing Hunziker roadbed. With
this in mind we feel that improvements to Hunziker should occur
only after the State' s clans have been finalized.
Sincerely,
HALLBERG HOMES, INC.
6,7,`-
Richard P. Reiver
•
1 r
h i
GCORGC WIY1. OTTC-,N .
landscape architect
April 19, 1979
v /97
,;,,,, o,
DE
pt.Homes Inc.
`� �
1710 N.E. 82nd
Portland, Oregon 97220
Dear Mr. Hallberg:
When I made the tree survey on the property located at 750
• S.W. Hunziker, Tigard, Oregon I examined the large Walnut
tree in the westerly portion of the site.
This tree is in need of extensive' pruning and other repair,
much of the tree being decayed and hollow. In my opinion,
it would not survive nor would it look attractive as a
landscape 'feature if it should survive
I therefore recommend it be removed during construction.
i.on
Respectfully,
/00r/
or 1
:«.►rge Wm. Otten
a, ,.scape Architect
0/pp
.
z
r
(1:1:‘?,
r
APR 2 1979
•
NEWTON ,,ND ASSOCIATES
aRCHITEC,1-
I I,,
rrrrr.wrw" ..,r.r. y�' r��w�wi �i .• r.r.w
7 nr
Post Office Box.213 • BedVerton Oregon 97005 Phone (503) 644-5066 ' '1
0
r .
.., , .. .,. .'__..,.,:.,., .......-. __...I......_, . ,., ,.... .. ., ,_._...._,i,,.... .. ....,k. ........ .....i.N ..,,.,t ....„_ r,..., ,._..- . L _•rne runt ,... .0
TIGARD SITE DESIGN REVIEW
STAFF REPORT
April 3, 1979
Tigard City Hall
12420 SW Main Street, Tigard, Oregon
Docket: Site Design Review SDR 12-79 - Hallberg Office Complex
Applicant: Hallberg Homes, Inc.
Location: Hunziker Road at 72nd Avenue (Wash. Co. Tax Map 251 1DB Tax Lots
101, 102).
Request: For site plan and architectural review of a new office complex.
Site Plan and Architectural Review:
The applicant is proposing to build two 8,000 sq. ft. two-story buildings
on a 1.1 acre site. The site is currently zoned commercial-professional
1 and designated as the same on the VP0 #4 plan. The site is bounded by apartments
to the west, a vacant lot and houses to the south and to the north, Hunziker ,
Road. The project conforms to the NPO #4 plan and the zoning requirements of
the site as to use and site layout.
Parking Requirements:
l space per 350 sq. ft. of floor area X 16,000 sq. ft. = 45.7 or
46 spaces required. The applicant proposes 55 spaces.
Access to the site is adequate and would be off Hunziker Road. Hunziker
Road has adequate right-of-way but no curbs or sidewalks. The percentage
of on site landscaping exceeds the required 20% of total site area. However,,
the landscaping around the parking area needs to be increased. The. Tigard
Municipal Code specifies landscape islands of 8' minimum width placed 70'
on center in parking areas or an aggregate amount and a minimum 5 land-
scape strip along any lot boundary where a yard is required. Yards are
required on 'loth lot lines of the parking area.
The applicant has submitted to irrigation or site drainage plans at this date.
The fintsh materials are acceptable. Cedar siding; and trim with a blue
metal roof are proposed for the office buildings.
Staff Recommendation
Staff recommends approval of the general plans with the following conditions
for final project apprcaval
applicant. s pe'plans the �d
1. � ghat, 'the D.bm?�t revised landscape showing he widened
landscape strip around the parking area as well a.s additional landscape
islands in the parking area including the landscape area in the south—
west corner of the project.
TIGARD SITE DESIGN REVIEW
April 3, 1979
TIGARD CITY HALL
Page 2
SDR 12-79
J • 2. That site drainage and irrigation plans be submitted for design review
approval.
3. That the applicant provide for a half street improvement to City of
Tigard standards on Hunziker Road and that the revised plans reflect
the improvement.
4. That elevation drawings be submitted for the east and/or west sides
of the complex.
5. That the existing trees on the site be preserved especially those
located in the proposed parking, and building area. These trees
should be relocated and incorporated into the landscaping plan or
included in landscape islands where possible. ..
Written by• ;14,14',fy �'���,�ien.zie � � � Appto�Approved by: Al e i�o�iard
Pia ,,,*dg Assi jtant P1anti E%irector
i ,
•
' SITE DEVELOPMENT PLAN i, D DESIGN REVIEW
Site Plat r
File No. , ti / r'� �, ,� -� :,
.�. , Architectural Review
Fee Received .
APPLICATION Receipt # g. 3
Tigard Pia Yning Department Date Received
12420 SW Main Street, Tigard, Or. 97223
639-4171
Project Title Ha llherc Office Complex Date Filed March 19, 1979
. r..,....ew.....nr.u.u.o.. wn"...�«wwr .,e. a.'... ►.e+'+e+.m.e'.+r
Project Address Hunziker Road at 72nd Ave.
•
Tax Map No h -81- Tax Lot NO 1:01 & 102
Y Hallberg
Developerts Name mes Homes
Address 1710 N. E. 82nd, Portland, Oregon 97220
Telephone 252-2456 r---- � i4V ,,'f
•
Owner's Name same Address
Telephone
. oil. pa Signature How__ r f . �,r "r
Description of Proposed Use General office use
UrwwweL 4`.L Y4 IMLeAm ewrw w.m.w+<av,.Y.M "L$ww..+:+� EL`.�r....o.r.. iI.,.w'..n ....nG+.fima.7 iW....N.wr""+MW
•
Acz' 641 t
D RI OF PROPERTY
•
0 os d O',
�. v
'x' .. ..e.;..°:�28 e i�dix! 3 .� ni s 2 0 5 F't 16,0 9° ,
Site Size 43, 950 T
` 43 950. q Buildings �8 OOO � 2 YW,N
Tot. S a Ft. of Du"
g's
S . ,. t. of Paving 'Landscaping q F . - � ?13�,.�.��,..�..w.� S q a Ft. of ''�a�d� g 12 i 4 5 3
Anticipated
-.
Lev lb ment Date.
Anticipated
. . Development Phases
Valuation $ 448,000
0 • ,
[Page Too Large for OCR Processing]
[Page Too Large for OCR Processing]