Correspondence d ".. Request for Information #004 ••:• 50P 000 S3 • PARAD;IGM CONSTRUCTION'LLc 10260 SW Greenburg Rd, Ste 400 Date: 06/24/11 Portland, OR 97223 Owner /Contractor MCJ Investments, LLC. Ph: (503) 452 -6922 Project Name/No: 11 -0008 — Wetzel's Pretzels WS Fx: (503) 452 -6923 RFI No: 004 Issue No: To: Laurie Keys — (Rep.) MCJ Investments, LLC. Subject: Hardlid Ceiling /Storefront Framing Ref: Attached Detail SSK01 Cost: Per RFI #002 the bu lkh ead framing framin comes down to an elevation of 12' -0" AFF and the Landlord has Question: . indicated that they do not want any finishes or framing using the bulkhead structure for vertical support. Additionally, the roof structure above has only the bottom cord of engineered web joists to attach to, which are likely. not built to support the weight. Per discussion with the Owner's Rep. a structural engineer was engaged to determine an acceptable method of support for the hardlid ceiling in the Service Area and the storefront framing in front of the bulkhead which will run on the mall side of the bulkhead structure flush with the framing at the recessed sign per RFI #003. Attached is Detail SSK01 from KPFF Consulting Engineers showing the use of Rigid X suspended grid and drywall system attached to the roof structure for storefront and hardlid ceiling assemblies. Please confirm that this is acceptable. PLEASE NOTE: This detail has already been approved by the Landlord. Name: Chris Mullin — Paradigm Construction LLC Date: 06/24/11 Answer: Name: Date: CC: Name: Co: Name: Co: Name: Co: Name: Co: N APPROVED By prattaar at 2 :02 pm, Jun 22, 2011 4. 4t, J 1 • ( D i g .E rz.c,,..s I I ) 6, k- Sp.x •Ir w I N- - . o I. e 12_ -o o_ ,, I • I 1 -- +' Ink.. -rrct- 'TU-v ce-V.— I' lz— 1//x.1 / j% ------- Pa /t-uv 1 ogi ell o S _y — - P s,o-9 Lr ! 11 ..0°.4' Ce + N�..�¢ wig C +J l2. Gam) r �� �t.) v i +oc , Z— w t 17) CE- Gt�D T is � I C U56) GE-►U Pr , 'I"`. w/ Do) L1 )2- mA01 I. . il i#. We& 1 T e �t 17.6,1-434-z4 4 ill 1 - x +:'7'� N 7 . . 1 I -....„ Sri/ �. MOM S m S '24 m i n s IEXPIRE9: '3 11. I '. cl Ft-1Tr -T- r ev., A r-+.L N-_ Z z 0 CI • - - Chris Mullin / From: - Michael Cooper [mcooper @pdmsdesign.com] / Sent: : Friday, June 24, 2011 8:51 AM To: r Chris Mullin Cc: -. Ilkeysl @cox.net; Randall Rowntree Subject: FW: Wetzel's Pretzels WS - RFI #004 Attachments: RFI #004 Attachment.pdf; Wetzel's Pretzels WS - RFI #004.pdf The attached structural engineer's detail is acceptable. Please accept this email as our approval to the attached RFI #004. Thank you, Michael Cooper I Project Lead PDMS Design Group 3100 E. Randol Mill Rd. I Arlington, TX 76011 Ph: 1817.701.4848 I Fax: 817.633.4153 mcooper@)pdmsdesign.com I www.pdmsdesign.com From: Chris Mullin jmailto: cmullin (alparadigmconstruct.com] Sent: Friday, June 24, 2011 10:39 AM To: Ilkeysl @cox.net Cc: Michael Cooper Subject: Wetzel's Pretzels WS - RFI #004 Laurie /Mike: I may have tried to do too much with this RFI, but I wanted to get all of the information incorporated into our design somehow. I wrote the whole thing so that the answer of a simple "Yes" will be sufficient. Please let me know if you have any questions. Thanks Chris Mullin, LEED AP Paradigm Construction LLC Mobile: 503- 209 -3976 Direct: 503 -452 -6922 Fax: 503 -452 -6923 PARADIGM coksaoucflou,a4 1