Correspondence d "..
Request for Information #004
••:• 50P 000 S3
•
PARAD;IGM
CONSTRUCTION'LLc
10260 SW Greenburg Rd, Ste 400 Date: 06/24/11
Portland, OR 97223 Owner /Contractor MCJ Investments, LLC.
Ph: (503) 452 -6922 Project Name/No: 11 -0008 — Wetzel's Pretzels WS
Fx: (503) 452 -6923 RFI No: 004
Issue No:
To: Laurie Keys — (Rep.) MCJ Investments, LLC.
Subject: Hardlid Ceiling /Storefront Framing Ref: Attached Detail SSK01 Cost:
Per RFI #002 the bu lkh ead framing framin comes down to an elevation of 12' -0" AFF and the Landlord has
Question: . indicated that they do not want any finishes or framing using the bulkhead structure for vertical
support. Additionally, the roof structure above has only the bottom cord of engineered web joists to
attach to, which are likely. not built to support the weight. Per discussion with the Owner's Rep. a
structural engineer was engaged to determine an acceptable method of support for the hardlid ceiling
in the Service Area and the storefront framing in front of the bulkhead which will run on the mall side
of the bulkhead structure flush with the framing at the recessed sign per RFI #003. Attached is Detail
SSK01 from KPFF Consulting Engineers showing the use of Rigid X suspended grid and drywall
system attached to the roof structure for storefront and hardlid ceiling assemblies. Please confirm
that this is acceptable. PLEASE NOTE: This detail has already been approved by the Landlord.
Name: Chris Mullin — Paradigm Construction LLC Date: 06/24/11
Answer:
Name: Date:
CC:
Name: Co:
Name: Co:
Name: Co:
Name: Co:
N
APPROVED
By prattaar at 2 :02 pm, Jun 22, 2011 4. 4t,
J 1 •
( D i g .E rz.c,,..s I I
) 6, k- Sp.x •Ir w I N- - .
o I.
e 12_ -o o_
,, I • I 1
-- +'
Ink.. -rrct- 'TU-v
ce-V.— I' lz— 1//x.1 / j% ------- Pa /t-uv 1
ogi ell
o
S
_y — - P s,o-9 Lr
! 11 ..0°.4' Ce + N�..�¢ wig C +J l2. Gam)
r �� �t.) v i +oc , Z— w t 17) CE- Gt�D T is � I
C
U56) GE-►U Pr ,
'I"`. w/ Do) L1 )2- mA01 I.
. il i#. We& 1
T e �t 17.6,1-434-z4 4
ill
1 - x +:'7'� N 7
. . 1 I -....„ Sri/ �.
MOM S m S
'24 m i
n
s
IEXPIRE9: '3 11. I '.
cl
Ft-1Tr -T- r ev., A r-+.L N-_ Z z
0
CI
•
- -
Chris Mullin
/ From: - Michael Cooper [mcooper @pdmsdesign.com]
/ Sent: : Friday, June 24, 2011 8:51 AM
To: r Chris Mullin
Cc: -. Ilkeysl @cox.net; Randall Rowntree
Subject: FW: Wetzel's Pretzels WS - RFI #004
Attachments: RFI #004 Attachment.pdf; Wetzel's Pretzels WS - RFI #004.pdf
The attached structural engineer's detail is acceptable. Please accept this email as our approval to the attached RFI #004.
Thank you,
Michael Cooper I Project Lead
PDMS Design Group
3100 E. Randol Mill Rd. I Arlington, TX 76011
Ph: 1817.701.4848 I Fax: 817.633.4153
mcooper@)pdmsdesign.com I www.pdmsdesign.com
From: Chris Mullin jmailto: cmullin (alparadigmconstruct.com]
Sent: Friday, June 24, 2011 10:39 AM
To: Ilkeysl @cox.net
Cc: Michael Cooper
Subject: Wetzel's Pretzels WS - RFI #004
Laurie /Mike:
I may have tried to do too much with this RFI, but I wanted to get all of the information incorporated into our design
somehow. I wrote the whole thing so that the answer of a simple "Yes" will be sufficient. Please let me know if you
have any questions.
Thanks
Chris Mullin, LEED AP
Paradigm Construction LLC
Mobile: 503- 209 -3976
Direct: 503 -452 -6922
Fax: 503 -452 -6923
PARADIGM
coksaoucflou,a4
1