Report �vt�ZolZ^ 00/2
IP
CL S E
ENGINEERING INC.
1S5 NE REVERE AVE, SUITE A PH: (541) 389 -9659
BEND, OR 97701 FAX: (541) 312 -8708
WWW.ECLIPSE- ENGINEERING.COM
Clarification Item #1
Date: November 27, 2012 N OV 2012
. 14O
Project: Clean Water Services Inverter Foundation `� . c , ,
16060 SW 05 Street 4) �
Tigard, Oregon 97224 �I o.
Project #12- 10-207 4 / V
GREG )N
To: Todd Andsfch & Derek Cropp / 4
SolarCity o �' 19 2- 11-.
From: Robert VanCamp, EIT �c `P Aay �G
1 Expiration Date: - 1
Re: Concrete Special Inspection F OES 3 1 20
For the above noted project, 3000 psi concrete shall be used for durability;
however, we have engineered the slab foundation based on a 2500 psi concrete
strength. For 2500 psi concrete strength, special inspection of the concrete is
not required.
If you have any questions please feel free to contact us at 541- 389 -9659
Attachments: none
End of clarification item #1