Loading...
Report �vt�ZolZ^ 00/2 IP CL S E ENGINEERING INC. 1S5 NE REVERE AVE, SUITE A PH: (541) 389 -9659 BEND, OR 97701 FAX: (541) 312 -8708 WWW.ECLIPSE- ENGINEERING.COM Clarification Item #1 Date: November 27, 2012 N OV 2012 . 14O Project: Clean Water Services Inverter Foundation `� . c , , 16060 SW 05 Street 4) � Tigard, Oregon 97224 �I o. Project #12- 10-207 4 / V GREG )N To: Todd Andsfch & Derek Cropp / 4 SolarCity o �' 19 2- 11-. From: Robert VanCamp, EIT �c `P Aay �G 1 Expiration Date: - 1 Re: Concrete Special Inspection F OES 3 1 20 For the above noted project, 3000 psi concrete shall be used for durability; however, we have engineered the slab foundation based on a 2500 psi concrete strength. For 2500 psi concrete strength, special inspection of the concrete is not required. If you have any questions please feel free to contact us at 541- 389 -9659 Attachments: none End of clarification item #1