4.) AFTER SCREED IS LAID OUT PER YOUR FLOOR PLAN, CHECK ALL DIMENSIONS. CORNERS
II MUST BE LAID SQUARE. CHECK LOCATIONS AND DIMENSIONS OF DOOR OPENINGS IN
1 SCREED AGAINST FLOOR PLAN. IF SCREEDS CHECK OUT PER THE FLOOR PLAN, BEGIN "
;1 INSTALLATION. •
!:i 5.) DETERMINE WHERE SHIMS ARE NEEDED FOR LEVELING. VINYL FLOOR TILE OR WOOD SHIMS
.1 CAN BE USED. . •
` 6.) CUT SHIMS TO WIDTH OF SCREED AND POSITION.:
:1:- NOTE: REMEMBER TO SHIM SCREEDS TO ASSURE A LEVEL SURFACE. GAPS BETWEEN
SCREED AND BUILDING FLOOR CAN BE FILLED WITH SEALANT AFTER SCREEDS ARE IN
. :. POSITION AND SECURE.
7.) TURN SCREED OVER AND APPLY A 3/4" BEAD OF SEALANT ON EACH OUTSIDE BOTTOM EDGE,
ABOUT 3/4" FROM THE OUTSIDE EDGE. SEE FIG. 1 -2.
8.) REPOSITION SCREED, BEING SURE TO SQUARE WITH CHALK LINE AND SHIMS, AND ALLOW
ADHESIVE SEALANT TO SETUP OVERNIGHT. THE SCREEDS MUST BE SECURED TO THE FLOOR
ITH NAILS, LAG BOLTS, OR OTHER SUITABLE FASTENER(S) IF THE WALK -IN IS TO BE
� EcENEIIRECTED ON THE SAME DAY AS THE SCREEDS HAVE BEEN LAID. SEE FIG. 1 -3.
NOTE: IF SECURING THE SCREED TO THE FLOOR WITH FASTENERS EACH SECTION OF F.
I JUN 2 4 2009 SCREED IS TO HAVE A MINIMUM OF TWO FASTENERS; ONE NEAR EACH END. FOR LONG
} SCREED SECTIONS THE SCREED SHOULD ALSO BE FASTENED AT A MAXIMUM OF FOUR fi
FEET BETWEEN FASTENERS.
CITY OF TIGARD NAIL OR SUITABLE
: ;IIUILDING DIVISION [FASTENER
1 / 1
2" • SEALANT-7 - - ---= _-!- J I
/ , "7": SEALANT
F .,
\ SEALANT -' -
1 1 . ; / /,�'�. . REDWOOD
•• �\ 1u = 1% J MEMBER
i ��' '/ LAG BOLT F
•1 i it
;4' { ..„„.. ,-.
_1 1( 1 •
4 SEALANT
FIG. 1 -2 SEALANT F
— EXPANSION
I SHIELD
2 • FIG_1 _3
;
1' ( Page 2 or4, Pape O Rrvieino Pepe
' _ 4 . 111
:1
•
•
----- -- �PREPAREDBY: _— _ NUMBER : A200- 639.�— Yu_- �._._.,:
REVISION DATE: 1/31/2002 is
CDL REVISION: APPROVALS: INSTALLATION [.,
4 _ - L.Rasmusson INSTRUCTION -
4- :
TITLE: U- SHAPED SCREED E
I i t
ITEMS SUPPLIED: RECEIV i
1.) U-SHAPED VINYL SCREED, PRE -CUT AND LETTERED.
ED
2.) RIVETS DRIVE i '
3.) ADHESIVE.
JUN 2 4 2009
s
. 4.) SILICONE SEALANT. CITY OF TIGARD
PROCEDURE: BUILDING DIVISION 1
1.) FOLLOWING THE SUPPLIED FLOOR PLAN, MARK THE OUTSIDE PERIMETER OF THE WALK. -IN '
F ;
;I ON EXISTING BUILDING FLOOR. CHECK CORNERS TO ASSURE THAT INTERSECTIONS ARE
1 SQUARE. t
't NOTE: ADD 7/8" TO OVERALL DIMENSIONS SHOWN ON THE FLOOR PLAN. THIS IS TO
ALLOW FOR THE COVING ON THE VINYL SCREED. SEE FIG. I -1-
CHALK LINES
:4 SHOWING SCREED LOCATION t`
t I t.
3
-t _ S - - - - - --- — .
M ,�
I Fq
., '# - rt./14., - o 6
i _.---- < i p
GGNp,L ` -�-- '
,O �
`1 -_.._ i ,
L - -- - - - -- - - - =y - -- __ ..
'
L ___ —_— _ .
. , -- WALK -IN O.D. +7/„ --
I ;
1 f,
' FIG. 1 -1
1 2.) FIND THE HIGH POINT OF THIS PERIMETER LINE. THE FLOOR SCREED MUST BE LEVELED TO t.
THIS HIGH POINT.
q 3.) LAY OUT SCREED SECTIONS AS PER YOUR SCREED PLAN IN INSTALLATION PACKET. THE
SCREEDS ARE LETTERED AND THUS MUST BE ERECTED IN THE SAME POSITION AS SHOWN L
ON THE FLOOR PLAN. E
1 r :
• ' ' Page I ere, Page 0-Revision Page
•
•
f;
.
- - -- PREPARED BY: - y _--�� _�_..�,,....�__..�_ -- - - -
NUMBER: A200- 639
CDL REVISION DATE: 1/31/2002 ['
l- APPROVALS: INSTALLATION REVISION:2
I L . Rasmusson INSTRUCTION
ii
TITLE: U- SHAPED SCREED
9.) SCREED INSTALLATION FORA WALK -IN WITH A PARTITION IS THE SAME AS A WALK -IN j
1 WITHOUT A PARTITION EXCEPT: t
f A. WHEN INSTALLING PERIMETER SCREED MAKE SURE THE NOTCH FOR THE PARTITION r
SCREED 1S IN THE CORRECT LOCATION AND IS ON THE INTERIOR OF THE WALK -IN. SEE k.
;i FIG.l -4. s
.4 EXTERIOR EDGE OF SCREED I '
S
i , , . . \ •
AME AS c; ,., 1 ,,:
,.
JUN 2:4 2049 F
i _ CITY OF MA" D i;
INTERIOR EDGE OF SCREED :' - "`'a ^aION
•
L4" REF. \ \\ —NOTCH FOR '
li
,t FIG. 1 -4 PARTITION SCREED
. j —
4 B. INSTALL ONE (1) PERIMETER SCREED PAST THE. PARTITION LOCATION. PLACE PARTITION 4
SCREEDS IN POSITION AND USE AS A GUIDE FOR INSTALLING THE PERIMETER SCREED ON t •
THE OTHER SIDE OF THE WALK -IN. SEE SEQUENCE NUMBERS IN FIG. 1 -5.
f
PERIMETER\
1 '" � � , � - SCREED
r:
PARTITION SCREED
�/ ^ (GUIDE ONLY)
1 I I
I .! _..
r E
.,
...,
, ,
. _ _i_ ___:, , [,
, ,- , ,
.! ,
... ._ ______ _ ______ _ _ _ _ _ _ _ _ _ ._ . _ _ _ _:, ,
FIG. 1 -5 y ,
C. AFTER PERIMETER SCREED IS INSTALLED, THEN PARTITION SCREED CAN BE INSTALLED 1
FOLLOWING THE SAME PROCEDURE AS OUTLINED FOR PERIMETER SCREEDS. s
: Page 3 of 4, Page 0=Revisson Page 1
I F I
i 4 F.
•
PREPARED BY: NUMBER: A200 -639 ;
E
It CDL REVISION DATE: 1/31/2002 f
, , APPROVALS: INSTALLATION REVISION: 2 r':
L .Rasmusson r .
a_ i INSTRUCTION F
TITLE: U- SHAPED SCREED
10.) AFTER ALL SCREEDS ARE SECURED TO FLOOR, SILICONE SEALANT SHOULD BE APPLIED AT
ALL INTERIOR AND EXTERIOR JOINTS TO SEAL AGAINST AIR AND MOISTURE ENTERING THE
WALK -1N.
a I.
i t F
WHEN ENTIRE WALK -IN HAS .BEEN ERECTED:
11.) THE DRIVE RIVETS SHOULD BE INSTALLED ON THE EXTERIOR AND INTERIOR OF THE PANELS. r';
THIS WILL REQUIRE THE DRILLING OF VI" HOLES TO ACCEPT THE DRIVE RIVETS. THE SPACE
BETWEEN DRIVE RIVETS SHOULD BE APPROXIMATELY 2'. SEE FIG. 1 -6. K
a'
I
RECEIVE E
,,
.
a JUN 2 . 4 2009
I l / DRILL lie HOLE r;
CITY OF TIGARD t
BUILDING DIVISION
I.
-i / `:
r✓
7 �- /^
J r• AP PLY SILICONE SEALANT
�q�;. /, E
1 a . 1 I I :.
WALL PANELS R
I. , F
II SCREED---v
�� "'
� i s
i2 )INSERT DRIVE RIVET - I
N :
, -1
4 (4)APPLY JOINT SEALANT — 1 ` !
9 t `:
(3)DRIVE PIN INTO PLACE
1 FIG. 1 -6
12.) APPLY A BEAD OF SILICONE SEALANT ALONG THE TOP EDGE OF THE SCREED WHERE IT L.
14 MEETS THE WALK -IN PANELS. DO THIS ALL AROUND THE WALK -IN ON THE EXTERIOR AND t •