Report Bend Office (541) 330 -9155
Geotechnical Office (503) 601 -8250
Carlson Testing, Inc. Eugene Office (541)345 -0289
Salem Office (503) 589 -1252
Tigard Office (503) 684 -3460
Special Inspection
FINAL SUMMARY LETTER
Date: October 12, 2012
Job #: T1206578
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn Building Division
Re: Project Name: Twality Middle School — Seismic Upgrade
Address: 14650 SW 97 Avenue — Tigard, OR
Permit #: BUP2012 -00051
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Screw Anchors, Adhesive Anchors and Wedge Anchors
Structural Steel
Wood Construction
The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non - compliance
report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As -Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by
CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially
generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance
of the non - compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
P \ Projects \GeneraR201 21T1 2 0657811 0 -1 2 -1 2 Final Letter.doc Updated 11/30/11
•
Bend Office (541) 330 -9155
Geotechnical Office (503) 601 -8250
Carlson Testing, Inc. Eugene Office
Salem Office (541) 345 -0289
(503) 589 -1252
Tigard Office (503) 684 -3460
Special Inspection
FINAL SUMMARY LETTER REcEivE
Date: October 12, 2012 OCT-2 2 2012
Job #: T1206578
CITYOFTIGARD
City of Tigard BUILDING DIVISION
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Division
Re: Project Name: Twality Middle School — Seismic Upgrade
Address: 14650 SW 97 Avenue — Tigard, OR
Permit #: BUP2012 -00051
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Screw Anchors, Adhesive Anchors and Wedge Anchors
Structural Steel
Wood Construction
The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non - compliance
report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As -Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by
CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially
generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance
of the non - compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
P:\ Projects \General\2012 \T1206578 \10 -12 -12 Final Letter.doc Updated 11/30/11
Date: October 12, 2012
Job #: T1206578
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CAR l .ON TESTING INC.
F. Hietpas
Pr c t Manager
J H /pl
, ttachment
I J fcc: Tigard - Tualatin School Dist C/O Hubbard & Associates hubbard.associates @frontier.com
City of Tigard Building Division
Nishkian Dean Structural Engineers — Ed Dean ed.dean @nishkiandean.com
Dull Olsen Weekes Architects — Rebecca Stuecker Rebecca.stuecker @dowa - ibigroup.com
2KG Contractors Inc — Kevin Folker 2kgcontractors @msn.com
2KG Contractors Inc — Trevor Mael Trevor @2kgcontractors.com
Nishkian Dean Structural Engineers— Nathan Hoesly nathan.hoesly @nishkian.com
NISHKtAN DEAN
CONSULTING AND STRUCTURAL ENGINEERS
October 22, 2012
Rebecca Stuecker
Dull Olson Weekes — IBI Group Architects, Inc.
907 SW Stark Street
Portland, OR 97205
Reference: Twality Middle School Incremental Seismic Upgrade
PERMIT No.: BUP2012 -00051
NDI Project No.: 1107
Dear Rebecca:
Subject: Structural Observation - FINAL REPORT
In accordance with the 2010 OSSC Section 1702 we have performed structural observation for
this project. Based on those observations, and Carlson Testing, Inc. "Final Summary Letter ",
dated October 12, 2012, we believe that the above referenced project structure was constructed
in general compliance with the approved plans and specifications.
Sincerely,
opp
NISHKIAN DEAN
40 ,
Nathan J. Hoesly, P.E.
Enclosure: � Ek ,
(1) Carlson Testing, Inc, Final Summary Letter, dated 10/12/ 2
Cc: Contractor: Kevin Folker, 2KG Contractors, Inc.
Owner: Philip Wentz, TTSD
Special Inspector: Jim Hietpas, Carlson Testing, Inc.
h: I nd1107 trva /ityms upgradeiconst admin )field reports)nd1107 final acceptance letter docx
1022 SW Salmon, Suite 300, Portland, OR 97205 li' (503) 274 -1843 FAX (503) 273 -5696
(> NISHKIAN DEAN
CONSULTING AND STRUCT ..RAL ENGINEERS SINCE 1919
NISHKIAN DEAN 1 1022 SW Salmon Street, Suite 300 Portland, OR 97205
Transmittal
ID: 00038
Date Sent: 10/22/2012
Project: TWALITY MIDDLE SCHOOL UPGRADE
Number: 01107.00
To: Rebecca Stuecker
DOWA -IBI Group
915 SW Stark Street #100
Portland, OR 97205
United States of America
(503) 226-6950 (Phone)
(503) 273 -9192 (Fax)
From: Nathan Hoesly
NISHKIAN DEAN
1022 SW Salmon Street, Suite 300
Portland, OR 97205
(503) 445 -8690 (Phone)
Subject: Twality MS Incremental Seismic Upgrade - FINAL Letter
Via: Email
Purpose: For your use and distribution
Remarks: See attached for our final structural observation summary letter.
CC: Phil Wentz(Tigard Tualatin School District)
Jim Hietpas(Carlson Testing, Inc.)
Kevin Folker(2KG Contractors, Inc.)
Description of Contents
Quantity Title Number Date Scale Size Revision
1 10 -12 -12 Final 10/22/2012
Summary Letter.pdf
1 ND1107 FINAL 10/22/2012
Acceptance Letter
20121022.pdf
•
•Date: October 12, 2012
Job #: T1206578
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CAR LON TESTING INC.
i
F. Hietpas
Pr.l ct Manager i H /pl
tt achment
cc: Tigard - Tualatin School Dist C/O Hubbard & Associates hubbard.associates @frontier.com
City of Tigard Building Division
Nishkian Dean Structural Engineers — Ed Dean ed.dean @nishkiandean.com
Dull Olsen Weekes Architects — Rebecca Stuecker Rebecca.stuecker @dowa- ibigroup.com
2KG Contractors Inc — Kevin Folker 2kgcontractors@msn.com
2KG Contractors Inc — Trevor Mael Trevor@2kgcontractors.com
Nishkian Dean Structural Engineers — Nathan Hoesly nathan.hoesly @nishkian.com
Carlson Testing, Inc. •
Incompleted Items List (NCL)
Oct 12, 2012
T1206578.
Project Name: TWALITY MIDDLE SCHOOL — SEISMIC UPGRADE
Project Address: 14 650 SW 97TH AVENUE TIGARD OR
Permit No: BUP2012 -00051
P.O. No: Project Manager: JAMES F. HIETPAS
Item # Insp. Date Item Description Compliance CTI Sign -Off Date
Corrected
3 AT 08/17/2012 CTI WAS ONLY ABLE TO VERIFY ANCHOR SIZE FOR PERIODIC IS REQUIRED. JAMES F. HIETPAS 08/22/2012
ANCHORS INSTALLED TODAY. ENGINEER OF RECORD'S
REVIEW AND ACCEPTANCE REQUIRED FOR AS BUILT
CONDITIONS.
CC:TIGARD — TUALATIN SCHOOL DIST C/O HUBBARD & ASSOCIATES
CITY OF TIGARD BUILDING DIVISION
NISHKIAN DEAN STRUCTURAL ENGINEERS — ED DEAN
DULL OLSEN WEEKES ARCHITECTS — REBECCA STUECKER
2KG CONTRACTORS INC — KEVIN FOLKER
NISHKIAN DEAN STRUCTURAL ENGINEERS — NATHAN HOESLY Page: 1