Loading...
Report Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Carlson Testing, Inc. Eugene Office (541)345 -0289 Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Special Inspection FINAL SUMMARY LETTER Date: October 12, 2012 Job #: T1206578 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn Building Division Re: Project Name: Twality Middle School — Seismic Upgrade Address: 14650 SW 97 Avenue — Tigard, OR Permit #: BUP2012 -00051 Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the following item(s) per our inspection reports only: Screw Anchors, Adhesive Anchors and Wedge Anchors Structural Steel Wood Construction The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non - compliance report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the "As -Built Condition" or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance of the non - compliance items and as -built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested /inspected only. P \ Projects \GeneraR201 21T1 2 0657811 0 -1 2 -1 2 Final Letter.doc Updated 11/30/11 • Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 Carlson Testing, Inc. Eugene Office Salem Office (541) 345 -0289 (503) 589 -1252 Tigard Office (503) 684 -3460 Special Inspection FINAL SUMMARY LETTER REcEivE Date: October 12, 2012 OCT-2 2 2012 Job #: T1206578 CITYOFTIGARD City of Tigard BUILDING DIVISION 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Division Re: Project Name: Twality Middle School — Seismic Upgrade Address: 14650 SW 97 Avenue — Tigard, OR Permit #: BUP2012 -00051 Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the following item(s) per our inspection reports only: Screw Anchors, Adhesive Anchors and Wedge Anchors Structural Steel Wood Construction The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non - compliance report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the "As -Built Condition" or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance of the non - compliance items and as -built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested /inspected only. P:\ Projects \General\2012 \T1206578 \10 -12 -12 Final Letter.doc Updated 11/30/11 Date: October 12, 2012 Job #: T1206578 Page 2 of 2 CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CAR l .ON TESTING INC. F. Hietpas Pr c t Manager J H /pl , ttachment I J fcc: Tigard - Tualatin School Dist C/O Hubbard & Associates hubbard.associates @frontier.com City of Tigard Building Division Nishkian Dean Structural Engineers — Ed Dean ed.dean @nishkiandean.com Dull Olsen Weekes Architects — Rebecca Stuecker Rebecca.stuecker @dowa - ibigroup.com 2KG Contractors Inc — Kevin Folker 2kgcontractors @msn.com 2KG Contractors Inc — Trevor Mael Trevor @2kgcontractors.com Nishkian Dean Structural Engineers— Nathan Hoesly nathan.hoesly @nishkian.com NISHKtAN DEAN CONSULTING AND STRUCTURAL ENGINEERS October 22, 2012 Rebecca Stuecker Dull Olson Weekes — IBI Group Architects, Inc. 907 SW Stark Street Portland, OR 97205 Reference: Twality Middle School Incremental Seismic Upgrade PERMIT No.: BUP2012 -00051 NDI Project No.: 1107 Dear Rebecca: Subject: Structural Observation - FINAL REPORT In accordance with the 2010 OSSC Section 1702 we have performed structural observation for this project. Based on those observations, and Carlson Testing, Inc. "Final Summary Letter ", dated October 12, 2012, we believe that the above referenced project structure was constructed in general compliance with the approved plans and specifications. Sincerely, opp NISHKIAN DEAN 40 , Nathan J. Hoesly, P.E. Enclosure: � Ek , (1) Carlson Testing, Inc, Final Summary Letter, dated 10/12/ 2 Cc: Contractor: Kevin Folker, 2KG Contractors, Inc. Owner: Philip Wentz, TTSD Special Inspector: Jim Hietpas, Carlson Testing, Inc. h: I nd1107 trva /ityms upgradeiconst admin )field reports)nd1107 final acceptance letter docx 1022 SW Salmon, Suite 300, Portland, OR 97205 li' (503) 274 -1843 FAX (503) 273 -5696 (> NISHKIAN DEAN CONSULTING AND STRUCT ..RAL ENGINEERS SINCE 1919 NISHKIAN DEAN 1 1022 SW Salmon Street, Suite 300 Portland, OR 97205 Transmittal ID: 00038 Date Sent: 10/22/2012 Project: TWALITY MIDDLE SCHOOL UPGRADE Number: 01107.00 To: Rebecca Stuecker DOWA -IBI Group 915 SW Stark Street #100 Portland, OR 97205 United States of America (503) 226-6950 (Phone) (503) 273 -9192 (Fax) From: Nathan Hoesly NISHKIAN DEAN 1022 SW Salmon Street, Suite 300 Portland, OR 97205 (503) 445 -8690 (Phone) Subject: Twality MS Incremental Seismic Upgrade - FINAL Letter Via: Email Purpose: For your use and distribution Remarks: See attached for our final structural observation summary letter. CC: Phil Wentz(Tigard Tualatin School District) Jim Hietpas(Carlson Testing, Inc.) Kevin Folker(2KG Contractors, Inc.) Description of Contents Quantity Title Number Date Scale Size Revision 1 10 -12 -12 Final 10/22/2012 Summary Letter.pdf 1 ND1107 FINAL 10/22/2012 Acceptance Letter 20121022.pdf • •Date: October 12, 2012 Job #: T1206578 Page 2 of 2 CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CAR LON TESTING INC. i F. Hietpas Pr.l ct Manager i H /pl tt achment cc: Tigard - Tualatin School Dist C/O Hubbard & Associates hubbard.associates @frontier.com City of Tigard Building Division Nishkian Dean Structural Engineers — Ed Dean ed.dean @nishkiandean.com Dull Olsen Weekes Architects — Rebecca Stuecker Rebecca.stuecker @dowa- ibigroup.com 2KG Contractors Inc — Kevin Folker 2kgcontractors@msn.com 2KG Contractors Inc — Trevor Mael Trevor@2kgcontractors.com Nishkian Dean Structural Engineers — Nathan Hoesly nathan.hoesly @nishkian.com Carlson Testing, Inc. • Incompleted Items List (NCL) Oct 12, 2012 T1206578. Project Name: TWALITY MIDDLE SCHOOL — SEISMIC UPGRADE Project Address: 14 650 SW 97TH AVENUE TIGARD OR Permit No: BUP2012 -00051 P.O. No: Project Manager: JAMES F. HIETPAS Item # Insp. Date Item Description Compliance CTI Sign -Off Date Corrected 3 AT 08/17/2012 CTI WAS ONLY ABLE TO VERIFY ANCHOR SIZE FOR PERIODIC IS REQUIRED. JAMES F. HIETPAS 08/22/2012 ANCHORS INSTALLED TODAY. ENGINEER OF RECORD'S REVIEW AND ACCEPTANCE REQUIRED FOR AS BUILT CONDITIONS. CC:TIGARD — TUALATIN SCHOOL DIST C/O HUBBARD & ASSOCIATES CITY OF TIGARD BUILDING DIVISION NISHKIAN DEAN STRUCTURAL ENGINEERS — ED DEAN DULL OLSEN WEEKES ARCHITECTS — REBECCA STUECKER 2KG CONTRACTORS INC — KEVIN FOLKER NISHKIAN DEAN STRUCTURAL ENGINEERS — NATHAN HOESLY Page: 1