Report Bend Office (541) 330 -9155
• Geotechnical Office (503) 601 -8250
C arlson Testing, Inc. Eugene Office (541)345 -0289
Salem Office (503) 589 -1252
Tigard Office (503) 684 -3460
RECEIV Ei_..
Special Inspection
FINAL SUMMARY LETTER MAY — 8 2012
Date: May 3, 2012 CITY OF TIGARD
Job #: T1205710 BUILDING DIVISION
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Division •
Re: Project Name: Consumer Cellular (219) @ Oregon Business Park III - TI
Address: 15605 SW 72 Avenue — Tigard, OR
Permit #: BUP2011 -00267
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Reinforced Concrete
Adhesive Anchors
Structural Masonry
Structural Steel (Shop)
The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non - compliance
report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As -Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by
CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially
generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance
of the non - compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractors work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
P.\ Projects \General\2012 \T1205710 \05 -03 -12 Final Letter.doc Updated 11/30/11
Date: May 3, 2012
Job #: T1205710
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
j( Steven W. Leach
Project Manager
SWL /pl
Attachment
cc: Pactrust— Dennis Pagni dennisp @pactrust.com
City of Tigard Building Division
Nordling Structural Engineers — John Nordling jnordling @integra.net
Pactrust— Martin Hanson martinh @pactrust.com
Carlson Testing, Inc.
Incompleted Items List (NCL)
May 03, 2012
T1205710.
Project Name: CONSUMER CELLULAR (219) @ OREGON BUSINESS PARK III - TI
Project Address: 15605 SW 72ND AVENUE PORTLAND OR
Permit No: BUP2011 -00267
P.O. No: Project Manager: STEVEN W. LEACH
Item # Insp. Date Item Description Compliance CTI Sign -Off Date
Corrected
1 KP 01/26/2012 CONCRETE MIX DESIGN NOT ENGINEER OF RECORD RECEIVED APROVED MIX STEVEN W. LEACH 05/03/2012
APPROVED. CAL PORTLAND #0725 USED. DESIGN.
2 GMG 02/13/2012 SUBSTITUTION OF EPDXY ANCHORS FOR CAST -IN -PLACE RECIEVED APPROVED DETAIL STEVEN W. LEACH 05/01/2012
LEDGER BOLTS CALLED OUT IN DETAIL 4/S2 AND CHANGE DATED 1/11/12.
OMITTED. REQUIRES ENGINEER OF RECORD'S APPROVAL.
3 GMG 02/13/2012 MASON'S SUBMITTAL PACKAGE (BLOCK, GROUT AND RECIEVED APPROVED STEVEN W. LEACH 05/01/2012
MORTAR CERTIFICATIONS, MIX DESIGNS AND TEST SUBMITTAL PACKAGE.
RESULTS) NOT YET SUBMITTED TO ENGINEER OF RECORD.
4 GMG 02/13/2012 PERMIT ISSUED PRIOR TO SUBMITTAL OF CITY OF RECIEVED APPROVED STEVEN W. LEACH 05/01/2012
TIGARD REQUESTED ELEVATOR ENGINEERING. CITY STRUCTURAL DRAWINGS FOR
APPROVAL OF STRUCTURAL DRAWINGS USED FOR ELEVATOR ELEVATOR DATED 1/31/12.
CONSTRUCTION IS NOT ON SITE.
5 CDS 02/16/2012 NO APPROVED MIX DESIGN FOR GROUT MIX 207009, 7 RECIEVED APPROVED MIX STEVEN W. LEACH 05/01/2012
SACKS OF 3/Q 70 -30 MIX FROM WILSONVILLE WAS USED DESIGN.
WITH INSTRUSION AID.
CC: PACTRUST - DENNIS PAGNI
CITY OF TIGARD BUILDING DIVISION
NORDLING STRUCTURAL ENGINEERS - JOHN NORDLING
PACTRUST - MARTIN HANSON
Page: 1