Date: July 24, 2012
Job #: T1206576
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Division
Re: Project Name: LDS (Tigard Seminary) — New Roof /Partial Seismic
Address: 16055 SW 92 Avenue — Tigard, OR
Permit #: Roofing (RER2012- 00010) / Seismic (BUP2012- 00092)
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Structural Nailing
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
P:\ Projects \General\2012 \T1206576107 -24 -12 Final Letter.doc Updated 11/30/11
q: Date: July 24, 2012
Job #: T1206576
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
Keith R. Gauvin
Project Manager
KRG /pl
cc: LDS WA Seattle Project Management — Scott Robison robisonst @ldschurch.org
City of Tigard Building Division — Rick Bolen
Erickson Structural Consulting Engineers PC — B Erickson Brandon @ericksonstructural.com
Bella Opus LLC — John Stark jsbellaopus@msn.com
Silco Commercial Construction Inc — Tom Silvey tsilvey @silco.info
t�;