Loading...
Plans DEMOLITION NOTES FIRE SPRINKLER G GRADE f t- / .� RISER RM 1 GR O.D. �i �`�/ A PATCH AND REPAIR EXISTING SURFACES THAT REMAIN. MATCHING SUBSTRATE f ±9' -11 X 3 _ AND FINISHES OF ADJACENT EXISTING SURFACES 'y ] < .. i `' /O /z,i/ rz - � _ 7-.61%117 — B VIDE SHORING AND BRACING AS REQUIRED. a 1 - 4 • 1 RM 418 zi G• PROTECT ALL ITEMS FROM DAMAGE DURING DEMOUTION. a t1$' - X 23' - X � • JA IC — s D. OWNER SHALL HAVE RIGHT OF FIRST REFUSAL FOR EQUIPMENT AND MATERIALS ll • I_ _ _I It ....- 0 ...///����1 REMOVED DURING DEMOLITION AND WILL PROMPTLY REMOVE SELECTED ITEMS J . I 1 SALVAGEABLE / RECYCLABLE EQUIPMENT AND MATERIALS SHALL BE STOCKPILED AT AN OWNER PROVIDED ON-SITE LOCATION FOR FUTURE USE I RECYCUNG ALL �I SHOWER RM << I ( — V OTHER DEMOLISHED MATERIALS ARE TO BE REMOVED DAILY. FEES ASSOCIATED I` ` ` _ )c1 // t14' - X 4' -7° I ! i-i 1���'�I =, WITH DISPOSAL SHALL BE INCLUDED IN TIM CONTRACTORS BASE BID I anal ` `� It RM 46 E ALL ITEMS NOT REUSED FOR NEW CONSTRUCTION TO BE RECYCLED TO THE Ir -11 i it � ±28' - X 24' - I MAXIMUM EX ALLOWED PER LOCAL CODE VERIFY WHICH ITEMS TO BE �� QQ REUSED W/ BUILDING OWNER AND ARCHITECT PRIOR TO REMOVAL RM #20 o RM #19 RESTROOM L1ii__J F CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL STRUCTURAL ELEMENTS FIELD dt16' - X 9' ±16' - X 13' - t7' - X 8' - +® • VERIFY EXACT LOCATIONS REMOVE ONLY THOSE THAT SUPPORT CONSTRUCTION I BEING DEMOLISHED ALL STRUCTURAL ELEMENTS THAT SUPPORT EXISTING aaaaaa ====. CONSTRUCTION TO REMAIN OR OVERALL BUILDING ARE TO REMAIN CONSULT WITH p a Pa m p =ann A STRUCTURAL ENGINEER AS REQUIRED / MEN'S G REMOVE ALL DROPPED CEILINGS IN ROOMS BEING DEMOLISHED RESTORE TO naanaaaa RESTROOM ORIGINAL CEILING TO STRUCTURE ABOVE PROVIDE MINIMUM FOOTCANDLE a RM .97 RM :i �'' --'1 {'--'( REQUIREMENT FOR NEW LIGHTING LAYOUT PER 2007 OSSC. RE -USE EXISTING a U 13' - X 9' x14 %0° X 10' t20' - X 7' -0° . J LIGHTING WHERE POSSIBLE a RM 121 H. REMOVE ALL ELECTRICAL ELEMENTS IN WALLS AND CCILINGS BEING DCMOUSHED. ENTRY L T II ±10' -7° X 23' - 9" 1 q 0 P 0 RELOCATED AS REQUIRED- COORDINATE NEW LOCATION WITH BUILDING OWNER. p r ' 444 J u ________ CONSULT WITH A ELECTRICAL ENGINEER AS REQUIRED. - �aa'a —a�a �' ± RM #5 1 a �^, �•y( �� QAA 27' 6" I. REMOVE ALL HVAC ELEMENTS THAT SERVE ROOMS BEING DEMOLISHED H�'�, O a O ' 1 1 p Y �� I ( iI Il RE-BALANCE HVAC SYSTEM TO MEET REQUIREMENTS OF NEW LAYOUT CONSULT p WITH AN HVAC ENGINEER AS REQUIRED A I J - N REMOVE PORTIONS OF MEZZANINE IN ENTIRETY AS SHOWN ON PLANS INCLUDING II 1 / C I B d B, d 6 FLOORS, CEILINGS, WALLS, ETC ' ® RESTROOM n Ca - I' O RM #1 `- t ' 9 P P • 20' -1' X 15' 0 9 ±20' -0° X T -10° r t •� I is KEYNOTES RM #22 n o „,_, , —<^ t47• -8° X 16• l 1 REMOVE EXISTING PLUMBING SYSTEMS 4 ( , SHOWROOM l L a O REMOVE EXISTING STAGE II r R M ±20 ' I{14 - X e - ± 47' OFFICE -6" X 39' -10" ± 65' -6" X 66' -0" 0 O REMOVE EXISTING RAMP a �1 b I� a 'Oan� YSTJ'CICIL' I O REMOVE EXISTING MOBILE WALL SYSTEM AND STRUCTURAL BEAM. CONFIRM W I% I 1 � � . _ R R I THAT BEAM IS INTEGRAL WITH WALL SYSTEM PRIOR TO REMOVAL 1 R M 410 RM „� 1 ll it a ' O REMOVE PORTION OF DRYWALL TO RESTORE EXISTING OVERHEAD DOOR ±12' - X 12' - a ±12' - X 14' - 1 I ® 1 RESTROOM Al It _ aa It_ _ t I' - 6 " X ' i - 7 " RM #4 O RELOCATE MPOE (COPPER) PPER) •COORDINATE WITH BUILDING OWNER MAIN ELECTRICAL DISTRIBUTION TO REMAIN RM #2 I 3'•10° X 10' - O — RM #23 ® a —_ a —_ a ® _ L L&! ® ±20-1° X 26-2' B 0 6 • PATCH AND REPAIR ENTRY CEILING •TAG PINE • O 1 I LLLFFF I II O REPAIR FLOOR, WALLS, AND CEILING - MATCH ADJACENT FINISH Igo a I t =1. ENTRY II a� \„ RM1t #,1 n RM � n 1I u O ROOFTOP ACCESS VIA MEZZANINE TO REMAIN R #24 t 12' -9" X 12' -0' a ±12' -9° X 14'-4 L � I / a ��� "� °•� I I 0 r J J `� F 1 " #3 1, REM S OUND BOOTH t8 -0" X 16 e t 0 �` J t11' -55' X 15' -10° ±6- O`1 annn— a n > _ L J I REMOVE FLOORING • RESTORE EXISTING CONCRETE TO MATCH EXISTING r— I I b 4 :aaa z =12 RM #13 ! 7 Y \ / LLL��� 12• -0° X 12' -0 _ � - -= WAREHOUSE 0 ±143' -8" X 48' -0" ' DEFERRED _ C ITY OF TIGARD Fire Sprinkler LEGEND IC , Fire Alarm _ RM 417 It I RM #15 Approved .DA"tu ,2-,41 -4" x.e. 144,6.7 ' EXISTING CONSTRUCTION TO REMAIN ±44' -10" X 23' -10" ±51' -10° X 23' -0'• Mechanical �� t 40R0 j X 2 23' -9' ; ' ® Conditionally Approved [ ] Plumbing _ • EXISTING CONSTRUCTION TO BE REMOVED See Letter to: Follow [ ] Electrical .. 1116141 RM #16 en a r Attached ] Truss Engineering ° IIEMMEIE t,z -5 r„ x _ • .J�D (O- 00 ( t[3 S hop D rawings � �p Permit Number: _ 0 II Address:lb Su! CAScan W.v . Other u ® 11 By: MA Date: 55 -10 - w o p t a DOCK HIGH 1 0' -0' OD O MEZZANINE O FIRST FLOOR OFFICE COPY • j 10795 SW CASCADE BLVD TIGARD OR 0 5 10 M Y H R E° G A o U P a r c h i t e c t s r ' 700 SW Taylor Street Salle 400 Portland, Oregon 97205 • DEMOLITION PLAN 101690 06.25.2010 I 503 2313 6000 1503.238.7500 SWAY myhregroupcom <1•43t O10Li MO"[Cn • DEM WANING, ME DE PrOhx:va '''' l W. 31101,110=111.AE ,"r re la AMCD.®w.wwwu Excmwrx nErrmxwrrtx.rwwuv VA. GROW Mnar¢-E FIRE SPRINKLER LEGEND RISER XM GRADE r t9' -11• X 3'-8' 12' -0_O D I /\W . EXISTING CONSTRUCTION TO REMAIN • • • SHOWER RM— ® 314' -2° X 4' - ,� - 10 RESTROOM ±7' -3• X13 MEN'S RESTROOM ±20' -0• X 7'-6' — 1 f L 1 ENTRY j • e .,l 14 O1 10 oil 4F { P Ws WOMEN'S �t d 6 d G I � , RESTROOM \ G] ±20 # 15' -0• 9 : 9 p 1 n l t20' -0• X T -10' Ir r GEM se. r_ ni . . „11)--1 , 1 OFFICE . ±47' -6" X 39' - ± 65' -6" X 66' -0" • ® 4 ,_ ,V1 r 1 - d! V RM #2 RM #4 ±20' -1' X 26' -2° d a d C, • 13' -10• X 10' -5 +_ 9 0 ' 9 P e1 I ENTRY 1 ® 6 RM #3 - — _ ±11' -5° X 15' -10' —_ 1 _ I' WAREHOUSE ±143' -8" X 48' -0" • E 8 Jr �` Jr r- i ...... �� DOCK HIGH 10'-0° O.D. 1 O MEZZANINE O FIRST FLOOR r 10795 SW CASCADE BLVD, TIGARD, OR 0 s 10 M Y R R E• G R OUP a r c h i t e c t s 700 W Ta tree Srdte 400 r Orepon 97 �' FLOOR PLAN 101690 06.29.2010 Is0323 S (503.2307500 P wrw.m 20.5 .� ��ro � "'