Special Inspection
FINAL SUMMARY LETTER
Date: November 30, 2011
Job #: T1105349
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Division
Re: Project Name: Plastic Metals — Tank Installation
Address: 7051 SW Sandburg Road — Tigard, OR
Permit #: BUP2011 -00192
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Installation of Adhesive Anchors
The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non - compliance
report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As -Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by
CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially
generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance
of the non compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do no constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
12/1/'ZO11 3:Zb PM Carlson Testing inc. -> 13b03bZ43681 3
•
Date: November 30, 2011 •
Job #: T1105349
Page 2 of 2
CTI's services did not include responsibilities related to determining supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
/ d
teven W. Leach
Project Manager
SWL /eah
cc: Airgas Nor Pac (Portland) — Mark Waldbillig mark.waldbi I lig(iairgas.com
City of Tigard Building Division
Zarosinski Engineering & Design Inc — Dean Zarosinski d7aroQzarocng.com
•
P:\ Projects \GeneraR2011\11105349 \11 -30 -11 Final Letter.doc Updated 11/30/11
Bend Office (541) 330 -9155
Geotechnical Office (503) 601 -8250
C arlson Testing, Inc. Eugene Office (541)345 -0289
Salem Office (503) 589 -1252
Tigard Office (503) 684 -3460
Special Inspection
FINAL SUMMARY LETTER
Date: November 30, 2011
Job #: T1105349
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Division
Re: Project Name: Plastic Metals — Tank Installation
Address: 7051 SW Sandburg Road — Tigard, OR
Permit #: BUP2011 -00192
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Installation of Adhesive Anchors
The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non - compliance
report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As -Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by
CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially
generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance
of the non - compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do no constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
Date: November 30, 2011
Job #: T1105349
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
F
teven W. Leach
Project Manager
SWL /eah
cc: Airgas Nor Pac (Portland) — Mark Waldbillig mark.waldbillig @airgas.com
City of Tigard Building Division
Zarosinski Engineering & Design Inc — Dean Zarosinski dzaro @zaroeng. com
P:\ Projects \General \2011 \T1105349 \11 -30 -11 Final Letter.doc Updated 11/30/11
Bend Office (541) 330-9155
Geotechnical Office (503) 601 -8250
C arlson Testing, Inc. Eugene Office 041)345 -0289
Salem Office (503) 589 -1252
Tigard Office (503) 684 -3460
Special Inspection
FINAL SUMMARY LETTER
Date: November 30, 2011
Job #: T1105203
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Division
Re: Project Name: Plastic -Metal Technologies — Bulk Storage Tank Pad
Address: 7051 SW Sandburg Road — Tigard, OR
Permit #: BUP2011 -00192
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Reinforced Concrete
The non - compliance (NC) items recorded for each of the above inspection categories, as listed on the non - compliance
report, have been either repaired and re- inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As -Built Condition" or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re- inspected by
CTI. CTI did not provide any additional review or re- inspection of those items beyond the inspections that initially
generated each of these individual items on the non - compliance list. The engineer of record has provided the acceptance
of the non- compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications. approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do no constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, aeficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested /inspected only.
Date: November 30,.201
Job #: T1105203
Page 2 of 2 •
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
•
Respectfully submitted,
CARLSON TESTING INC.
Keith R. Gauvin
Project Manager -
KRG /eah
cc: Stride Corporation — Aaron Lothrop aaron @strideco.com
City of Tigard Building Division
Zarosinski Engineering & Design Inc — Dean Zarosinski dzaro@zaroeng.com
Stride Corporation — Tony Wright tonywright @strideco.com
P:\ Projects \General\2011 \T1105203 \11 -30 -11 Final Letter.doc Updated 11130/11