Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
ELCZO1I- a O69L- i' � I ZOO Sw 70 _ Av 16 _ -r1f y JOB: RED ROCK ACCUPUNCTURE DEC 21 2011 CITY OF TIGARD VOLTAGE: PANEL: PHASE ��.DING DIVISION 120/ 208 V BUSS AMPACITY: 200 A A 3 4 ( LOAD LOAD • CKT BKR * DESCRIPTION A B C C B A DESCRIPTION * BKR CKT 11 20 R 120,110,126 RECEP 1080 * * ** * * ** A * * ** * * ** 1080 101,120,119 RECEP R 20 2 31 20 R 110 DED RECEPTACLE * * ** 1800 * * ** g. * * ** 360 * * ** 103 RECEPTACLES R 20 9 51 20 R 110 RECEPTACLES *. * ** * * ** 1260 C 360 * * : ** * * * *. 103 RECEPTACLES R 20 6 71 20 R 105 RECEPTACLES . 1500 * *** * * ** A * * ** * * ** 540 103 RECEPTACLES R 20 8 _ ' 91 20 R 105 RECEPTACLES * * ** • 1500 * * ** B * * ** 360 * * ** 103 RECEPTACLES R 20 10 . 11 20 E I ': * * ** * * ** C 1080 * * ** * * ** 115,116,118 RECEP R 20 12 • 13 20 E * * ** - * * ** A * * ** * * ** 1080 114,113 RECEP R 20 14 15 20 • E * * ** * * ** B * * ** 1080 * * ** 112,122 RECEP R 20 16 17, 20 E * * ** ** ** C 1080 * * ** * *** 121,123 RECEP R 20 18 19 20 E * * ** • * * ** A * * ** * * ** 1080 124,125 RECEP R 20 20 21 20 E * * ** * * ** B * * ** 1620 * * ** 108,107,106 RECEP R 20 22 23 20 ,E * * ** * * ** C 360 * * ** * * ** WATER FILTER E 20 24 . 25 20 E * * ** * * ** A * * ** * * ** 2880 WATER HEATER R 20 26 27, 20 E * * ** * * ** B * * ** 2880 * * ** WATER HEATER R 20 28 29, 20 E * * ** * *** C • * * ** , * *** 2'' -•t E 20 30 31 20 E * * ** * * ** A * * ** * * ** 1080 110 RECEPTACLES R 20 32 33 20 E * * ** * * ** B * * ** 852 * * ** LED. LIGHTING L 20 34 35 20 E * * ** - * * ** C 100 * * ** * * * *, EXIT LIGHTS L 20 36 37, 20 L 400 * * ** * * ** A * * ** * * ** 6720 sue PANEL B M 20 -38 34 20 R TIME CLOCK * * ** 180 - * * ** B * * ** 6720 * * ** SUB PANEL B M 20 90 91 20 L LED LIGHTING * * ** * * ** 1060 C 6720 * * ** * * ** SUB PANEL B M 42 12020 17352 • 17440 CONNECTED LOAD (VA) 13Z.-e- 100.2 144.6 145.3 CONNECTED AMPS /PHASE 46.8 TOTAL CONNECTED LOAD (KVA) ! 130.1 TOTAL CONNECTED AMPS - . LOAD LOAD CONN. DEMAND DEMAND TYPE DESCRIPTION LOAD (VA) FACTOR LOAD (VA) E I NONCONTINUOUS 360 100% 360 40 TOTAL DEMAND LOAD (KVA) R 1 RECEPTACLE 23880 10K + 50% 16940 112 TOTAL DEMAND AIDS L I LIGHTING 2412 125% 3015 H ' HVAC 0 100% 0 . M ! MOTORS 20160 125% + BALANCE 20160 1 I i JOB: RED ROCK ACCUPUNCTURE VOLTAGE: PANEL: LIGHTING PHASE WIRE 120/ 208 V BUSS AMPACITY: • 100 A B 3 4 i LOAD LOAD CKT BKR * DESCRIPTION A B C C B A DESCRIPTION * BKR CKT 11 40 M RTU 1 3360. * * ** * * ** A * * ** * * ** 3360 RTU 2 M 2 13 40 M RTU 1 * * ** 3360 * * ** B * * ** 3360 * * ** RTU 2 M 4 15 40 M RTU 1 * * ** * * ** 3360 C 3360 • * * ** ** ** RTU 2 M 6 1 7 * * ** * * ** A a * ** ** ** 8 1 9 * *** * * ** B * * ** * * ** 10 3 1 aaa* a * ** C ** **a* 12 1 3 ** ** * * ** A * * ** *aaa 14 15 * * ** ** ** B '* *** • 16 17 ** ** * * ** C - * * ** * * ** 18 19 * *a* * * ** A **** aaa* 20 21 ** ** * *** B ** ** * * ** 22 23 * *** - ** ** ' C **** a * ** 24 25 ** ** *aaa A * *** * *** 26 27 a * ** **** B * * *a ** * *. 28 . 29 * * ** * * ** C a*** ' * * ** 30 31 * *** * *** A * * ** *a ** 32 3 3 a * ** aaa* B * * ** * * *a 34 3 5 **** * *** C ** ** * * ** 36 37 * * ** * * ** A * * ** * * **• 38 39 **** * * ** B * * *a * * ** 40 6720 6720 6720 CONNECTED LOAD (VA) 24.3 24.3 24.3 CONNECTED AMPS /PHASE . - 20.2 TOTAL CONNECTED LOAD (KVA) 56.0 TOTAL CONNECTED AMPS LOAD LOAD CONN. DEMAND DEMAND. I TYPE DESCRIPTION LOAD (VA) FACTOR LOAD (VA) El NONCONTINUOUS 0 100% - 0 R , RECEPTACLE 0 10K + 50% 0 L 1 LIGHTING • 0 125% 0 H 1 HVAC 0 100% 0 20.2 TOTAL DEMAND LOAD (KVA) M I MOTORS 20160 125% LARGEST + BALANCE 20160 56.0 TOTAL DEMAND AMPS B ussmann ® Short Circuit Calculation Results 12/20/2011 12:54 PM Three Phase System Fault at the End of a Run of Cable Three single conductors Aluminum Conductor Magnetic Conduit Wire Size 250 85 ft Length of Run 1 Conductors Per Phase 35402 amp Line -to -Line Short Circuit Current at Beginning of Run 208 V Line -to -Line Voltage Three Phase Line -to -Line Short Circuit Current = 11542.580 AMPS HAINJ ce4412 -b Pi i ` ussmann "Ifcuit PI Ot&ctioi i Solution • • Short Circuit Calculation Results 12/20/2011 12:56 PM Three Phase System Fault at the End of a Run of Cable Three single conductors Aluminum Conductor Magnetic Conduit • Wire Size 1 8 ft Length of Run 1 Conductors Per Phase 11543 amp Line -to -Line Short Circuit Current at Beginning of Run 208 V Line -to -Line Voltage Three Phase Line -to -Line Short Circuit Current = 9903.549 AMPS T EL ' t § : • • • /: • ; e48 ReGyreiFeva,.:- 12 516/1 /Zei6t4dx ------- S ..69 e • Z 1 . cA44-rrituretrat___ 51 LoC APPIAR•44 (SeroliCA X 17-,0 1TU4 16,3e0 z-ru 10 IA :::_ur10 65 ; V4 /34-e J7- WO) oak CEZLK ACD pov rU (1) 2.5 II Co OD wl (4)41 zsa )(444wk.1/40) +it. UNA (By a-44am) APK0C. BS 2a8J � iamb cci4vge I w Zc w.o E A�, 4 1'403 151tALED a /OK RFC Ito/10W 1,543-'s a 35, 402. () Zar.0 rusts 00A p a� a Yac. l4) xiii A/ i10c.4u,4n Ae [Page Too Large for OCR Processing] [Page Too Large for OCR Processing] [Page Too Large for OCR Processing]