Loading...
Plans[Page Too Large for OCR Processing] � ' : ' : ::• : :• •' :: :• I I I o I suV (,.�,h,�,u Rd ... • • •• • • • • • • • .. 41441\ PGE P ortland gengril Electric Gompariy 9480 SW BoecgmnrCRDjrd • Wilsenvilie, Ol egon ••• • • •• ••. ••• • • „ • • • • • • • ••• •• •• • • • ••• • • July 1, 2009 Carl Duncan AC &E Electric 3535 Del Webb Ave, Suite 100 Salem, OR 97301 RE: Robinson Construction Co. (PGE job # 578060). Carl, Enclosed is a drawing detailing the new underground power line PGE will install to the new 800 amp service to the building at 11101 SW Greenburg Road in Tigard. You will be responsible for the trenching, backfill, conduit, pull- string, metering gear for the project. The free standing gear must conform to section 10 of PGE's 2009 electric service requirements book (Figure 10 -7.) The fault current for this new service will be 34,925 AIC. All conduit must be 4" PVC with 36" radius long -sweep elbows. Please review the enclosed information and call me if you have any questions. Please have your excavator call me at least three days prior to digging to arrange a pre- construction meeting with our general foreman on'site. The excavator will, need to call Jim Kacalek (503- 672 -5502) for inspection of the conduit and pad installation 'prior to backfilling. You will also need to get city of Tigard approval on the termination can and meter base installation. After the City approves the installation call 503- 736 -5450 for final inspection by PGE.• There is no billing from PGE for this job. Once all inspections are completed PGE will schedule the work. There will be a power shutdown required during this job. I will arrange the time and date with you and the affected tenants a few days prior. Sin -rely, a • arrish Project Manager • Service Design & Construction PGE — Wilsonville 503 - 570 -4421 0 1 ti� ��� ' • T • � y • . •S. •• • • • • • • . ' : REPL 460 �� COMMERCIAL LEGEND _ � • •• • • • • • • .. 1 " �� W j : : 225 L�. y m m *��E - . NEW PGE FACILITIES TO . BE INSTALLED . - r �� CD J J52327 -86 01541 -1I • BCA: f : • !: J •Q 00 304/ (UNLESS OTHERWISE SPECIFIED) • • WITH _ 7200V PL 1/: I J0: TE.•:• . • • • • •• PAD �� - INSTALL I - "350 AL - OX IN 2 OF 3 -4" PVC CONDUIT SW NORTH • ••• •3 '•• ••• MT 300 30' 277/4 �I il PROVIDED & INSTALLED BY CUSTOMER (ONE SPARE) ., yr 0009z C) �eee 4o REMOVE ��C 2_pa 00 52.5 DAKOTA ST:'` :'7 cn • _ •• • ••• • — JH1254 -91 ), B -2 A / ♦ ��' • �' a • J61588-74 I l' . C' 1200A L -08 (I1 ('`f (Y� o s �� • • • •• • 01541 CUSTOMER TO DIG SPLICE PIT & STUB A ♦ •• • • • • • 1 � 4 ' 6 4° CONDUIT TO SPLICE PIT. CUSTOMER VICINITY M •, . I' TO BE ON SITE. TO CONNECT NEW 4° PVC O' I C-2/O AL o: I 1 0 cu x THE RITE �� 1F1 CONDUIT TO EXISTING 4° CONDUIT AFTER THOMAS GUIDE Q P 217 • ooa n ) J 1 65 7 5- CENTER :CAL- B PGE CREW HAS DE- ENERGIZED & REMOVED 11101 SW GREENBURG RD A 75 9924 EXISTING UNDERGROUND CABLE. 655 -D3 VI INITY MAP 1740 AIC= 34.925A ` 39 ox,� 27D7�48OV PD 0004 i % IN - P A 225 460 +► '� . i , _ CONSTRUCTION NOTES SFEXT -N 800 AMP /o OP A-2 AL -D: L! - 1 VT 00091 1 D 00205 I CU TO PROVIDE ALL TRENCHING AND BACKFILLING. TRENCH TO BE I O V f O 36 INCHES DEEP AND 24 INCHES WIDE. MEASURED FROM FINAL GRADE. WR CHECKLIST \ 6-S=�_@i28li 9sFt 480 68'', � o308z. a ITEM YES COMMENT \ .�4 , � , _ _ �' 0 :' ' i 0 ► ►90 + �Q . . 2. CONDUIT (IF NECESSARY) WILL BE GRAY. SCHEDULE 40. ELECTRICAL GRADE. HOLEDIGGER \ S00 AL x`P '��� Z PVC CONDUIT WITH NYLON PULL STRINGS (MIN. 500 LBS. TEST). 05 \ 1 -4 /a 990 PD 14582 c ■ 1 ' P c ° yo- PGE • TO DETERMINE THE _SIZE AND NUMBER OF CONDUITS REQUIRED. BOOM X \ - 2007-45 050I'qt� 2 -350 " 3 AL-OX -; ABC - • - D: ;o '� ` ' j ti MAINTAIN 12 VERTICAL - INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN SPA RE BACKHOE \ • 05017 1 \ • SW NORTH DAKOTA S 1994 -45 aBC -336 AAC / =�n� C3 GAS AND OTHER. UTILITIES.. ALL ELBOWS TO BE 36 INCH (MIN) RADIUS. ALL BENDS MUST BE FACTORY MADE. CONDUIT RUNS LONGER THAN 150 FEET 1-� 4 ► N - 1/0 ACS• REQUIRE RIGID STEEL ELBOWS OR PGE APPROVED FIBERGLASS AND MUST BE PGE TRENCH r APPROVED BY PGE PRIOR TO INSTALLATION. THE MAXIMUM TOTAL BENDS IN ANY RUN IS 270 DEGREES. p3`-6 A L-TX 1 11-25 LOCATES \ o \ F Q ' ' 1541 - /' 01541 - p�6 P 43 mp 3. CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS. USE ONLY GRAY. SCHEDULE 40. • STAKING \ /9 A 15 34065 PL o 6i ?75 \ 6762 50 . �- o"J t C 0 05021 -40 PL05021 ELECTRICAL GRADE. PVC CONDUIT WITH NYLON PULL STRINGS (MIN. 500 LBS. TEST). � v e -2` AL -813 1967 • FLAGGING \ \ B 15 34061 G •' tip' O�' y� AB - At D8 ` w��\ 4. SINGLE PRIMARY INSTALLATIONS - CONDUIT TO EXTEND A MINIMUM OF 10' FROM C 15 34059 • 4 25 48316f `\` � \` � t-iii4 TREETRIM \ A 5 1167 \ 6T . 25 ;, : 00046 ►B TRANSFORMER PAD. LANDSCAPE \ \ A 10 20696 � + PD I75 0004E 1 .. of ► X7504/ •1990 -30 5. ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET (MIN) FROM ANY COMBUSTIBLE EASEMENT ABC 795 • • \ N \ ABC -336 AAC d 7 . 9ez ' 1 ' = ACS 1 •3-30 BUILDING. WALL OR OVERHANG • AND 4 FEET (MINI FROM ANY FIRE HYDRANT. N - 4/0 AAC 0 1541 - 17 - q0 " 1•a • I54I - PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA. CUTSHEET , \ 1992 -55 015 - PL 06717 0 . 0 o00811 PERMITS \ 00061 J6 '5 -85 . - ,/ 11 35 . �l O �• 00312/ ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. 07 2/ o UG CIR. VER. \ P 120611 _ Ay 6. CUSTOMER TRENCH AND ELBOW CONFIGURATIONS MUST BE INSPECTED BY PGE PRIOR TRANSMISSION • 30 " u • TO BACKFILLING. PLEASE CALL 503 736 - 5450 TWO DAYS PRIOR TO INSPECTION. SHUTDOWN TIE'600A \ 1 960 4 60 \ o + , 6 0 't% I 536 7 , DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT. NON- STANDARD UNDGERGROUND E CUSTOMER \ oI I - \ 1/4 + A 25 3 • 39 P 1 4 EQUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST TO THE CUSTOMER. SHUTDOWN X 9 METERS 1603 \ 07 -• / \ ;: a B 25 '4551 J63783 -69 , 00047 0 DOOR HANGER - PL : A. C 25 0672 AS BUILT VERIFICATION CONTACT LOAD SUMMARY Y pp�� This document accurately COMPANY LOAD TYPE CONNECT DEMAND CST & NESC VIOLATIONS CORRECTED represents FIELD construction. • . KW FACTORS* DEMAND Foreman: • Date: PH5 C° COOKING 01 ' 0 :30 0 SDOEngineer: - Date: • DATE TIME LIGHTING 141 0.90 126.9 Designer: • Date: RECEPTACLES 40 • ; 0.10. 4 WATER HEATING 0 0.20 0 www.PortlondGenerol.com wwW.PortIondGenerol.biz www.EorthAdvontoge.com •• • CALL BEFORE YOU DIG: OREGON LAW REQUIRES YOU TO REQUEST UTILITY LOCATION ELECTRIC HEAT 0 - 0.75' 0 TITLE JOB NO. 2' BUSINESS DAYS PRIOR TO EXCAVATION. FOR LOCATES CALL THE OREGON UTILITY , t, \ AIR CONDITIONING 0' . 0.75 0 y ROBINSON CONSTRUCTION 578060 NOTIFICATION CENTER AT 811. REFRIGERATION - 180' 0.75 • 135 ° CIRCUIT SIZE CONTACT 'GENERAL FOREMAN AND /OR CONDUIT INSPECTOR 7 TO 10 MOTORS 0 0.50 • • 0 PRGRS- GREENBURG 11x17 • WORKING DAY'S PRIOR TO EXCAVATION. 0'' + : N COMPUTERS 121 ' . 0.67' 8.04 PGE DESCRIPTION SCALE CONDUIT INSPECTION REQUIRED PRIOR TO BACKFILL. WELDERS 0'. • 0.10 0 NEW 3 PH 800 AMP SERVICE I' =100' PGE WILL NOT INSTALL WIRE UNTIL TRENCH IS 100% BACKFILLED. ; , O 0.10 0 LOCATION ELEVATORS III0I.SW GREENBURG RD. TIGARD;WASHINGTON •CO • JIM KACALEK : IRRIGATION . 0 t ' .. 0.75 - 0 GENERAL. FOREMAN _ DATE SECTION(S) • WORK WITH SHEET PHONE: (503) 672 -5502 CELL: 969 -6103 • MISCELLANEOUS 0' 0.50 0 WILSONVILLE 06 -29 -09 CII -35C LINE CREW CENTER I OF I Know what's below. ' = ' i ' DES IGN BY PHONE (503) IDRAWN BY ' . STREETLIGHT SPECIALIST: JEFF STEIGLEDER TOTAL EST CONNECTED 373" Fti' y 9480 SW BOECKMAN RD LINDA PARRISH 570 -4421 1 JLC, - PHONE: (503f 570 .4404 CELL: 849 - 6548 Call before you dig. WILSONVILLE. OR 97070 TOTAL EST DEMAND 273.94 PORTLAND GENERAL ELECTRIC CO.- ALL RIGHTS RESERVED • ^ - II F _ •