SCOPE: CITY OF TIGARD
1. REPLACE EXISTING 800A P LONE
/ 1200A GFl MAIN DISTRIBUTION PANEL REINSTALL
// EXISTING CONDUITS & WIRE FROM PANELS
A THRU D.
2. PROVIDE NEW RACEWAY FROM NEW TRANSFORMER
PAD TO 24 "x48 "x48" NEMA 3R TRANSITION PULL
BOX TO BE MOUNTED ON OUTSIDE WALL OF
BUILDING OPPOSITE NEW MEP. RGC NIPPLE TO
COMPLETE RACEWAY THRU BACK OF CAN TO
MDP PANEL PGE TO PROVIDE AND INSTALL
SECONDARY CONDUCTORS FROM TRANSFORMER
TO UTILITY SECTIONS.
. CITY OF TIGARD
lk Approved
GE Conditionally Approved
For only work as described i ' " 1
PERMIT NOS b� T
See Letter to: Fcllow
Attach
EXISTING 800A DISTRIBUTION PANEL Job Address: r7 3 a j V) �^'ANlYm��4 ON \ o\ \
TO BE REPLACED WITH NEW . \ 00\M Date: 1 3
1200 AMP PANEL B
PLANNED EXPANSION 2005.
HIGHEST HISTORICAL LOAD
611 KW (11- 15 -04).
1 7_7)- \C C)DV1
4OOA ( 400A - •
q 35 ` 35 I �\ 3 r \1
I SPARE I SPARE
1 = I `•`.`, ' (' A0 �. (9 , ;10 0 - ; , ' l
4 /o ` . I ? � '� ' r c V, S I ' �
8 S / i a \ M 1 431 4 e)s 40
z 1..\
•
TVT Die Casting & MFG c k ( () \ PROJECT NO.Oec -ease 1F LE;ezes5 -E,
sCB
DRAWN BY Ic►+KOar�c /J()DATEf 12/3
7 3 3 0 S W landmark I , ., E � -1 c�� T i 1. c �_ R DATE 12/3/04
X] n e {,. �� '� ��Ic` �' t► . 5 SCALE N.T.S
Portland, OR ��
, a.nr..� ,� nan!�6 ° NUM9ER
i
i I
12.47KV
PORTLAND GENERAL ELECTRIC CO.
SCOPE:
1,500KVA XFMR 12KV, 480V, 30 WYE 1. REPLACE EXISTING 800A PANELBOARD WITH NEW
AVAIL FAULT CURRENT I 1200A GFI MAIN DISTRIBUTION PANEL REINSTALL
CT PGE 43,932A 0 480 VOLTS EXISTING CONDUITS & WIRE FROM PANELS
480V 30 Y CT • { A THRU D.
MDP CAN
2. PROVIDE NEW RACEWAY FROM NEW TRANSFORMER
EXISITING BLDG 2 1 -4" PVC
PAD TO 24 "x48 "x48" NEMA 3R TRANSITION PULL
4- 350MCM BOX TO BE MOUNTED ON OUTSIDE WALL OF
BUILDING OPPOSITE NEW MDP. RGC NIPPLE TO
LOAD 50KW COMPLETE RACEWAY THRU BACK OF CAN TO
(EXISTING) MDP PANEL PGE TO PROVIDE AND INSTALL
SECONDARY CONDUCTORS FROM TRANSFORMER
TO UTILITY SECTIONS.
•
- 5 -4" PVC CONDUITS
350 MCM
CONDUCTORS BY PGE
MAIN DISTRIBUTION PANEL - EXISTING 800A DISTRIBUTION PANEL
TO BE REPLACED WITH NEW
1200 AMP PANEL.
A PLANNED EXPANSION 2005.
T 1200A HIGHEST HISTORICAL LOAD
) DIGI TRIP RMS310 LSG 611 KW (11- 15 -04).
50 KAIC
1200A, 30, 4W, 480/277V, 65KAIC
6 b b b b A 1 A b 40 b A
C 200A
\ 1 35 A \ 2 A 35 \ 2 35 A \ 35 \ 4 35 \ 35 \ 4 35
PANEL D • EXISTING EXISTING L C PANEL B P E A SPARE SPARE I SPARE SPARE
I '
& ^ / r � PROJECT NO. oEC 82956 FILEa2956 -E1
TVT Die Casting I V 1 V �� �� �- �� DRAWN BY SCBICI1KD.8YIBC /JCIDATE 112/3
w
ELECTRIC z DATE 12/3/04
7330 SW landmark lane GR( p SCALE N.T.S.
Portland, OR ! « ° NUMBER Eli
N: \82956 -7VT Diecasting- mfg \82956- E1.dwg, Layout1, 12/6/2004 12:36:33 PM, HARJEF
— - - _- - —