Loading...
Report 01/04/2005 10:20 503598E1705 GEOP CiFTC ENG INC. PAGE 01 GettP4 Real -World 6eoteohnical Solutions January 4, 2005 investigation • Design •Construction Support Job No, 04 -8784 Attention: Andrew Thomas Venture Properties, Inc. 4230 Galewood Street, Suite 100 Lake Oswego, Oregon 97035 Fax No. (503)670.9009 RE: GEOTECHNICAL ENGINEER'S FOUNDATION EXCAVATION REVIEW THORNWOOD PARTITION — PARCELS 1 AND 2 CITY OF TIGARD, OREGON Reference: GeoPacific Engineering Inc., Soil Engineer's Summary at Conclusion of Earthwork, Thornwoo l City of Tigard, Oregon, dated March 10, 2003. .GeoPraoific Engineer, Jim lmbrie, has visited parcel 2 on December 22, 2004 and parcel 1 on January 4, 2005.. The purpose of our visits were primarily to review the foundation excavation subgrade, and footing proximity to existing slope faces and terrace cuts. The footing subgrades generally consisted of stiff native soil that is slightly mottled. The current subgrade is considered adequate for spread foundation support. Based on our observations, the roundation'subgrade and slope -to- footing setbacks should be acceptable for support of the proposed single - family home. No deck footing subgrades were observed. Some mucking is expected to be necoes;ary due to frost heave. Our work scope for this phase of geolw.hnical review pertains to foundation bowing conditions only and is limited to the conditions existing and exposed at the time of our site visits. This report is for Don Morfssette Homes only and information herein should not be relied upon by others without consulting GeoPacific Engineering, Inc. If you have any further questions, please call. Sincerely, GeoPecifie Engineering, inc. ,�a� . GINEe I esra /V% 74,3 ". 72. James O. Imbrie, P.E., C.E.G. / ,, OREGO, f Geotechnical Engineer ,, 4* thec,/,, . IN 7312 SW Durham Road Tel (503) 598 -8445 Portland, Oregon 97224 Fax (5d3) 5984705