Loading...
Permit a CITY OF TIGARD BUILDING PERMIT III ' COMMUNITY DEVELOPMENT Perm BUILDING BUP2012 -00262 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 12/18/2012 Parcel: 2$101 DC04000 Jurisdiction: Tigard Site address: 7550 SW TECH CENTER DR 250 Project: Cochran Subdivision: TECH CENTER BUSINESS PARK Lot: A Project Description: TI to enlarge (3) offices. Contractor: PERLO CONSTRUCTION LLC Owner: WALTON CWOR SOUTHWEST 12 LLC 7190 SW SANDBURG ST BY CTMT - WALTON RE TAX PORTLAND, OR 97223 4678 WORLD PARKWAY CIR ST LOUIS, MO 63134 PHONE: 503 - 624 -2090 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB DC Provision Review, COM TI - Ping 12/18/2012 $67.00 Occupancy Grp: B Occupancy Load: 210 DC Provision Review, COM TI - LRP 12/18/2012 $10.00 Permit Fee - Additions, Alterations, 12/18/2012 $564.15 Dwelling Units: 0 Demolition Stories: 1 Height: 0 ft 12% State Surcharge - Building 12/18/2012 $67.70 Bedrooms: 0 Bathrooms: 0 Plan Review 12/18/2012 $366.70 Value: $34,263 Plan Review - Fire Life Safety 12/18/2012 $225.66 Info Process /Archiving - Lg $2.00 (over 12/18/2012 $6.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,307.21 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952- 001 -0010 through OAR 952 - 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.80 .332.2344. Issued By: Permittee Signature: / Call 503.839.4175 by 7:00 a.m. for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. 1 11 1 14 ' Building Division Over - The - Counter (OTC) Building Permit l i c' A li D Check List Project Description: APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION *Class of Work: -kLT Occupancy Group: Type of Construction: *Type of Use: rid,-*( Occupancy Load: �.() Oregon Specialty Code: 26( 0 SPECIFICS Number of Stories: ! Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT - SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback — Left Sideyard Setback — Front Sideyard Setback — Right Sideyard Setback — Back , CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access. Parking Spaces: REQUIRED ITEMS Fire Sprinklers: Fire Alarms: Smoke Detectors: Parapet: Manual Pull Stations: Protected Corridors: Total Project Valuation: $ ? 4) 2h' ‘ CC) I FEES DUE $ b pp DC Prov Rvw, COM TI — Ping $ V , eo DC Prov Rvw, COM TI — LRP DC Provision Review Fee for COM TI $ ��' , Permit Fee — Add, Alt, Demo Project Valuation Planning LRP $ &',7C3 12% State Surcharge Up to $4,999 $0.00 $0.00 $tlir • Plan Review, Structural $5,000 - $74,999 $67.00 $10.00 $ 4,5, , , _ Plan Review, Fire Life Safety $75,000 - $149,999 $167.00 $25.00 $ b 06 Info Proc /Arch, Lg (over 11x17 $2.00) $150,000 and over $268.00 $39.00 $ Info Proc /Arch, Sm (up to 11x17 $0.50) $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee Planning Staff: $ Hourly Rate State Surcharge $ Misc. Admin Fee Permit Coordinator: $ Other: $ Other: Building Staff: $ Other: Date /Time: $ 1007.2( TOTAL FEES DUE *OPTIONS: TYPE OF USE: COM = commercial; CMS = commercial manufactured structure. CLASS OF WORK ACS = accessory; ADD = addition; ALT = alteration; FND = foundation; DEM = demo; FND = foundation; FPS = fire protection system; NEW = new; OTR = other (use for fences, decks, retaining walls, signs, awnings or canopies); REP = repair. I: \ Budding \Forms \OTC - BUP.docx 07/01/2012 UPI B uilding Division Development Code Provision Review (i A 1. F) Commercial Projects - No Associated Land Use Case Building Permit No: "teA-2a4-9 DD aq6 a- 'Expedited Review Submittal Date: 4,2 rF //02-- Q TL' To the Applicant: ➢ If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application. Building Permit Technicians (503) 718 -2439. ➢ If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section. Staff: please check items along left only if approved. Planning Review (contact C4 &11 I n C L at 503-718-.2'437 or GI t rct,1 c-- @tigard - or.gov) Proposal: M o A ;-C--.0 ci o-F --C; te._ la 1 6,,44- (, ex c,, d.; n 5 --h. ru_ c4 Ca .t) -(w a n t i i 54-' ") e l e ckvi c a l c• •-vi-.r a c.4-J,r , Zoning I - L 'L: q if S., d .4.) a L Permitted Use Yes ❑ No ® we i s d" C4 beet LAS ei r"•ic oa=k CA- tea.. 14, 'a- c. Land Use Required: Yes ❑ No A Notes: I G+4^ \SJ u e d a I T Se ..4.-E1 1d4 ,--J Q i . - -F,, - -I4. JJt 4 -t%; Iec4u• -,. - Thu rv..6d:.,'c&i ay. 1s n44 typRridi.,c U.1 C . 9 1 / Approved ❑ Not Approved Date: I a - I $ - 12. REVISED 10/4/12 Building Permit Application Commercial FOR OFFICE USE ONLY - City of Tigard Received Date /B : Permit No.: NI • 13125 SW Hall Blvd., Tigard, OR 97223 Plan Review Phone: 503.718.2439 Fax: 503.598.1960 Date /B : Other Permit: TIGARD Inspection Line: 503.639.4175 Date Ready /By: kris: ® See Page 2 for Internet: www.tigard or.gov Notified/Method: Supplemental Information TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ I- and 2- family dwelling ® Commercial /industrial Valuation: $ ❑ Accessory building ❑ Multi- family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 7550 SW Tech Center Dr New dwelling area: square feet City/State /ZIP: Tigard, Oregon Garage /carport area: square feet Suite/bldg. /apt. no.: Ste 250 Project name: Cochran TI Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: Lot no.: Permit fees* are based on the value of the work performed. Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Enlarge 3 offices Valuation: $$34,263.00 Existing building area: 20840 square feet New building area: 0 square feet ❑ PROPERTY OWNER I El TENANT Number of stories: I Name: Cochran Type of construction: III -B Address: 7550 SW Tech Center Dr Occupancy groups: City/State /ZIP: Tigard, Oregon 97223 Existing: B /S1 Phone: ( ) Fax: ( ) New: B /S1 0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* ease Business name: Mildren Design Group (Pl Structural plan review fee (or deposit): Contact name: Curt Trolan FLS plan review fee (if applicable): Address: 7650 SW Beveland St, Ste 120 Total fees due upon application: City/State /ZIP: Tigard, Oregon 97223 Phone: (503) 244 -0552 Fax: : (503) 244 -0417 Amount received: E -mail: curt @mdgpc.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof -top mounted Photo Voltaic Solar Panel System. Business name: Perlo Contractors Submit two (2) sets of roof plan with connection details and fire department access, along with the 2010 Oregon Address: 16101 SW 72 Ave, Ste 200 Solar Installation Specialty Code checklist. City/State /ZIP: Portland, Oregon 97224 Permit fee (includes p lan review $180.00 and administrative fees): Phone: (503) 624 -2090 Fax: (503) 639 -4134 State surcharge (12% of permit fee): $21.60 CCB lic.: 189245 Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained T � within 180 days after it has been accepted as complete. Print name: Curt Trolan Date: 12/11/2012 * Fee methodology set by Tri-County Building Industry Service Board. L:\Building\Permits \BUP -COM PermitApp.doc 02/24/2011 440- 4613T(1 I /02 /COM/WEB) Building Permit Application - Commercial RECEIVED FOR OFFICE USE ONLY City of Tigard 1 RCCO1V �.� 1 Permit N .. - • 1 3125 r SW H all Blvd., Ti aid, OR 97223 D 1 8 Q l2 DateB : 1 ', e tGAa0� dw?b g Plan Review Phone: 503.718.2439 Fax: 503.598.1�p p /g : � jl� Other Permit: T I G A R D Inspetion Line: 503.639.4175 l I OF TIGARD Date Read Ty: Jur' ® See Page 2 for Internet: www.tigand- or.gov BUILDING DIVISION Notified /Method: 71 Supplemental Information TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. — Indicate the value (rounded to the nearest dollar) of all ® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1- and 2- family dwelling ® Commercial /industrial Valuation: $ ❑ Accessory building ❑ Multi- family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 7550 SW Tech Center Dr New dwelling area: square feet City/State/ZIP: Tigard, Oregon Garage/carport area: square feet Suite/bldg. /apt. no.: Ste 250 Project name: Cochran TI Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: Lot no.: Permit fees* are based on the value of the work performed. Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Enlarge 3 offices Valuation: $$34,263.00 Existing building area: 20840 square feet New building area: 0 square feet ❑ PROPERTY OWNER I ® TENANT Number of stories: 1 Name: Cochran Type of construction: III -B Address: 7550 SW Tech Center Dr Occupancy groups: City/State /ZIP: Tigard, Oregon 97223 Existing: B /Sl Phone: ( ) Fa.: l 1 New: B /Sl ® APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* Business name: Mildren Design Group fP �fee schedule) Structural plan review fee (or deposit): Contact name: Curt Trolan FLS plan review fee (if applicable): Address: 7650 SW Beveland St, Ste 120 City/State/ZIP: Tigard, Oregon 97223 Total fees due upon application: Phone: (503) 244 -0552 Fax: : (503) 244 -0417 Amount received: E -mail: curt @mdgpc.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof -top mounted Photo Voltaic Solar Panel System. Business name: Perlo Contractors Submit two (2) sets of roof plan with connection details and fire department access, along with the 2010 Oregon Address: 16101 SW 72 Ave, Ste 200 Solar Installation Specialty Code checklist. City/State /ZIP: Portland, Oregon 97224 Permit fee (includes plan review $180.00 and administrative fees): Phone: (503) 624 -2090 Fax: (503) 639 -4134 State surcharge (12% of permit fee): $21.60 CCB lic.: 189245 Total fee due upon application: $201.60 Authorized signature: . e %"` This permit application expires if a permit is not obtained / .t �/ within 180 days after it has been accepted as complete. Print name: Curt Trolan I Date: 12/11/2012 * Fee methodology set by Tri- County Building Industry Service Board. 1:\Building\Permits \BUP -COM PennitApp.doc 02/ 24/2011 440-4613T( 11/02/COM/WEB ) _ Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ 34,263 MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 8565.75 ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ 250 (b) An accessible entrance: $ 0 (c) An accessible route to the altered area: $ 0 (d) At least one accessible restroom for each sex or a single unisex restroom: $ 750 (e) Accessible telephones: $ 0 (0 Accessible drinking fountains: and, $ 0 (g) When possible, additional accessible elements such as storage and alarms: $ 0 TOTAL (shall equal line [2] of Valuation Computation): $ 1000 I: \Building \Permits \BUP -COM PermitApp.doc 03/03/2011 • i _ ° Building Division Plan Submittal Requirements T I G A RD Commercial & Multi - Family - New, Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ❑ map & tax lot # ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking, including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape -ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit - based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey, and full set of architecture drawings. I: \Building \Permits \BUP -COM PermitApp.doc 03/03/2011 ill _ a Building Division Plan Submittal Requirement Matrix T I G A R D Commercial & Multi- Family - New, Additions or Alterations Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington County, and Tualatin Valley Fire & Rescue), if applicable. I: \Building \Permits \BUP -COM PermitApp.doc 03/03/2011