Permit /'-' � CITY OF TIGARD BUILDING PERMIT
PERMIT #: BUP2002 -00068
�� ); lLA DEVELOPMENT SERVICES DATE ISSUED: 5/21/02
" � I � 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171
PARCEL: 1S126C0 -01107
SITE ADDRESS: 09785 SW WASHINGTON SQUARE RD
SUBDIVISION: WASHINGTON SQUARE ZONING: C -G
BLOCK: LOT: JURISDICTION: TIG
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION
CLASS OF WORK: ALT FIRST: sf N: S: E: W:
TYPE OF USE: COM SECOND: sf PROJECT OPENINGS?
TYPE OF CONST: 5N : sf N: S: E: W:
OCCUPANCY GRP: M TOTAL AREA: 0.00 sf ROOF CONST: FIRE RET?
OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED:
STOR: HT: ft GARAGE: sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED
FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET:
DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC:
BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING:
VALUE: $ 10,000.00
Remarks: Tenant improvement, Install new hallway, ceiling grid with lights and shelves
Owner: Contractor:
PPR WASHINGTON SQUARE LLC BAKER CONSTRUCTION & DEV
P.O.BOX 21545 2711 E SPRAGUE AVENUE
SEATTLE, WA 98111 SPOKANE, WA 99202
Phone: Phone: 509 - 535 -3668
Reg #: uc 119103
FEES REQUIRED INSPECTIONS
Type By Date Amount Receipt Framing Insp
PLCK CTR 2/26/02 $71.83 27200200000 Misc. Inspection
Final Inspection
FIRE CTR 2/26/02 $44.20 27200200000
PRMT CTR 5/21/02 $139.30 27200200000
PLC2 CTR 5/21/02 $18.72 27200200000
(additional fees not listed here)
Total $285.57
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes
and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is
not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law
requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952 - 001 -0010 through OAR 952 - 001 -1987. You may obtain a copy of these rules or direct questions to OUNC by
calling (503) 246 -6699 or 1- 800 - 332 -2344.
w
Pe rm lttee
Signature: 6
Issued By: (— ��/
Call 639 -4175 by 7 p.m. for an Inspection the next business day
i evir--- /S tIz__
- ' ' Building Permit Applicati
Date received: A f e 49. Permit no.: R _ R--,;( ` ° City of Tigard
-, Project/appl. no.: date:
CiryojTigard Address: 13125 SW Hall Blvd, Tigard, OR 97223 CO
Phone: (503) 639 -4171 Date issued:
rig;
I Receiptno.: n
Fax: (503) 598 -1960 Case file no.: Payment type: V
Land use approval: l &2 family: Simple Complex:
TYPE OF PERiIIl
O 1 & 2 family dwelling or accessory X Commercial/industrial O Multi- family O New construction O Demolition
O Addition/alteration/replacement Tenant improvement O Fire sprinkler /alarm O Other:
Job address: 97 5 5 iv 4 4, 4 v"� n - f Bldg. no.: Suite no.: -42_ Lot: Block: seal I ji � n 4 ! / � l " I Tax map /tax lot/account no.:
Project name: to 514 t,)
Description and location of work on premises/special conditions: LOtil//t4n / 2 C er Iran 4/1e0470
OWNER FOR SPECIAL INFORMATION, USE CHECKLIST
Name: /I I � (Floodplain, septic capacit solar, etc.)
Mailing address: !3,2 7 ' I & 2 family dwelling: - -
City: To ast ce IState:C . ZIP:, /5 / Valuation of work $ ?
Phone134 j2 — 66(j Fax: ova I E -mail: No. of bedrooms/baths
Owner's representative: Ebcin. S M5 f e . his Total number of floors . - - - i---
Phone: Fax: E -mail: New dwelling area (sq. ft.) - i i
Garage/carport area (sq. ft.)
Name: E,,r yj ,m)Je, Covered porch area (sq. ft.)
Mailing address: / 7 } cc µ
/� Deck area (sq. ft.)
Other structure area (sq. ft.)
City: � !'i^tl/1GtP, I State:�j 1 ZiP:9lj�$p J �mmerciaUindastrisl /multi- family:
Phone: +� 3 - Vii/ Fax: p , E - mail:
a/44 CONTRACI.OR Valuation of work $ X77
Existing bldg. area (sq. ft.) 'G
i Business name: 4 a
L New bldg. area (sq. ft )
/J Address: - 1 t t , j
q Z Number of stories
N
\,/,
City: 99 I ZIP: { Q Type of construction - Phone: S0- .2S 5-31,( 4x:5 E-mail: Occupancy group(s): Existing: M
CCB no.: (9 16,-- j New:
City /metro ljc. no.: Notice: All contractors and subcontractors are required to be
licensed with the Oregon Construction Contractors Board under
Name:1 5 it E,>cpu ;45 provisions of ORS 701 and may be required to be licensed in the ,
Address: /32 7 1p5 are jf jurisdiction where work is being performed. If the applicant is
City: - 10 S: C417.11): �igfp/ exempt from licensing, the following reason applies:
Contact person: ' pt' )p /(f I I te
Plan no.:
Phone j -6 Fax: E -mail:
Name: Contact person: Fees due upon application $
Address: Date received:
City: (State: IZIP: Amount received $
Phone: I Fax: I E -mail: Please refer to fee schedule.
I hereby certify I have read and examined this application and the Not all jurisdictions accept credit cards, please call jurisdiction for more information.
attached checklist. All provisions of laws and ordinances governing this o visa o MasterCard
work will be complied wi �, whe a specified 1- number Expi /
Autho signature: , _ _ • j am , , a z 9 ; • te : G � /
'n not. Credit card
�/ Name of cardholder as shown on credit card
• Print name: l — �eh zt " $ .
Cardholder signature Amount
Notice: This permit application expires if a permit is not obtained within 180 days after it has been accep as complete. 440-4613 (doacoM)
7/
4/
•
I
COMMERCIAL PLAN SUBMITTAL
REQUIREMENT MATRIX
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to
request additional plan sets for distribution purposes (for Contractor, City of
Tigard, Washington County, and Tualatin Valley Fire & Rescue).
. ,`.. .Total # o` :
. KEY:
'
,TYPt
'FAS. �liral r :All S n Plans`` ° . `kp s1r ' - ..\1 �i���:' ' t �1E 7 � 5 t}�.M 'C�
S = Site Work (must include
S (New, Add or Alt) 4 location of all accessible parking)
B (New, Add or Alt) 1* B = Building
F (New, Add or Alt) 3 ** F = Fire Protection System
M (New, Add or Alt) 2 M = Mechanical
P (New, Add or Alt) 2 P = Plumbing
E (New, Add, or Alt) 2 E = Electrical
New = New Building
Add = Addition
.Alt = Alteration to existing
building
*For over - the - counter commercial tenant improvements, submit 2 sets of plans.
** "New" requires that plans bear the original seal of an Oregon licensed fire
suppression engineer, or NICET level "3" technicians.
I:\dsts \forms\matrxcom.doc 10/27/00
CITY QF7" 24 -Hour
-'aJI[ NG Inspection Line: (503) 639 -4175
INSPECTION DIVISION Business Line: (503) 639 -4171 MST p
. BUP v` - �o D
Received Date Reque ted 6 AM PM - BUP
Location / 7 Fs L� S Q e 47' Suite MEC
Contact Person Ph ( .� . 4' 73 _ a? / g PLM
Contractor Ph ( ) SWR
BUILDING Tenant/Owner ELC
Footing
Foundation ELC
Access:
Ftg Drain ELR
Crawl Drain
Slab Inspection Notes: SIT
•
Post & Beam
Shear Anchors
Ext Sheath/Shear
Int Sheath/Shear
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Other:
Final
P ASS PART FAIL
PLUMBING
Post & Beam
Under Slab
Rough -In
Water Service
Sanitary Sewer
Rain Drains
Catch Basin / Manhole
Storm Drain
Shower Pan
Other:
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough -In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough -In
UG/Slab
. Low Voltage
Fire Alarm
Final Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE ❑ Please call for reinspection RE: Unable to inspect — no access
Fire Supply Line
ADA
Approach/Sidewalk Date Inspector Ext
Other:
Final DO NOT REMOVE this inspection record from the Job site.
PASS PART FAIL
CITY OF TIGARD 24 -Hour k
`'i1UIL'NG Inspection Line: (503) 639 -4175 .. " `
INSPECTION DIVISION Business Line: (503) 639 -4171 /J MST
/ BUP — 6-0 cc d
y
0
Received Date Requested AM PM BUP
[�
Location % 7 S 1-& k- So_ • - D Suite MEC
Contact Person > 4 i 0 ./� Ph ( ) Sa — 4 PLM
Contractor Ph j ZOI SWR
BUILDING Tenant/Owner � ELC
Footing ELC
Foundation Access:
Ftg Drain ELR
Crawl Drain
Slab Inspection Notes: SIT
Post & Beam
Shear Anchors _...-
Ext Sheath/Shear 0- .
Int Sheath/Shear lit / 4111W ey1 S : q� 6 5,4 1
Drywall Nailing ` L C ' .?_ Q Q / S 1. C7 ' )
Firewall 6 3 1 - 6 . 2 . - 0 0 ) — -o O — 0 a)-7 (y- e 6.)
Fire Sprinkler
Fire Alarm
Susp'd Ceiling /' J.__ r Roof
Other: u O - C d a -� , 12 S kf C Tr )
Final �.Q�, S , _ii. _ CO . 6 O
PASS PART 4
PLUMBING
Post & Beam
Under Slab / ' . r-e--5 i ( -747-) � fr'ri.....1/1/1 vr�
Rough -In
Water Service - U � r G
Sanitary Sewer /t
Rain Drains 7 S � ' U
Catch Basin / Manhole
Storm Drain
Shower Pan
c
Other: /J �J
Final 7 Va If v`1- 4 L S s .
PASS PART FAIL
MECHANICAL C„\S l/Vl-
Post & Beam
Rough -In r-''11'.°--j2
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough -In
UG/Slab
Low Voltage
Fire Alarm
Final ❑ Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE fl Please call for reinspection RE: ❑ Unable to inspect - no access
Fire Supply Line \
ADA /� /J l!
Approach/Sidewalk Date T �V� � Inspector " �` Ex Z
Other:
Final DO NOT REMOVE this inspection record from the job site.
PASS PART FAIL
1
CITY OF TIGARD 24 -Hour e 4
BUILDING Inspection Line: (503) 639 -4175
INSPECTION DIVISION Business Line: (503) 639 -4171 M ST //�� /
BUP n� -- eg
Received Date Requested `� AM PM BUP
Location 7 g s" w - SQ- S le MEC
Contact Person Ph (37 7' �� / PLM
Contractor P ( SWR
BUILDING Tenant/Owner ELC
Footing ELC
Foundation - ess
Ftg Drain _ ELR
Crawl Drain
Slab Inspection N s: A q9 /// SIT
Post & Beam
Shear Anchors
Ext Sheath/Shear
Int Sheath/Shear
Framing
Insulatio
all ailin
Firewafl
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Other:
PASS FAIL
MBING
Post & Beam
Under Slab
Rough -In
Water Service
Sanitary Sewer
Rain Drains
Catch Basin / Manhole
Storm Drain
Shower Pan
Other:
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough -In
Gas Line
Smoke Dampers
Final
PASS PART FAIL •
ELECTRICAL
Service
Rough -In (r
UG/Slab
Low Voltage
Fire Alarm
Final Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE 0 Please call for reinspection RE: 0 Unable to inspect — no access
Fire Supply Line
ADA /
Approach/Sidewalk Date 6 • 0 Z Inspector &ft-) v Ext
Other:
Final DO NOT REMOVE this inspection record from the job site.
PASS PART FAIL
CITY OF.TIGARD 24 -Hour
BUILDING Inspection Line: (503) 639 -4175 •' �'•
INSPECTION DIVISION Business Line: (503) 639 -4171
:UP -eve 6g
Received Date Requested �/ 0 2 AM PM _ BU'P
Location ' 7$,5 1.0/ SQ Q .D Suite MEC
Contact Person Ph ( ) SD 7 '476 - '0 101 e PLM
Contractor P ( ) SWR
BUILDING Tenant/Owner � SA -e_/4 ELC
Footing
Foundation ELC
Ftg Drain Access: R
Crawl Drain
slab pection Notes: Aiw detacua.1 L.e.t SIT •
Post & Beam
Shear Anchors SZcr c, •
Ext Sheath/Shear
Int Sheath/Shear
Framing
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling I
Roof
Other:
ma
SS PART FAIL '
PLUMBING
Post & Beam
Under Slab •
Rough -In as ` T � n �/ Q .
b
Water Service (� �
Sanitary Sewer o
Rain Drains
Catch Basin / Manhole
Storm Drain
Shower Pan
Other: /
Final /
PASS PART FAIL
MECHANICAL
Post & Beam
Rough -In
Gas Line
Smoke Dampers •
Final
PASS PART FAIL
ELECTRICAL
Service
Rough -In
UG/Slab
Low Voltage
Fire Alarm
Final ❑ Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE 1=1 Please call for reinspection RE: ❑ Unable to inspect — no access
Fire Supply Line
ADA
Approach/Sidewalk Date Inspector Ext
Other:
Final DO NOT REMOVE this inspection record from the Job site.
PASS PART FAIL
CITY OF TIGARD 24 -Hour
BUILDING Inspection Line: (503) 639 -4175
INSPECTION DIVISION Business Line: (503) 639 -4171 MST �r
BUP 2 c o
7/
Received - Date Requested °� AM PM �w BUR
Location 77 $ S U. - s� • ao, Suite MEC
Contact Person Ph ( 5C? ) 02 r PLM
Contr Ph ( ) SWR
BUILDIN Tenant/Owner ELC
Foundation ELC
Access:
Ftg Drain ELR
Crawl Drain
Slab Inspection Notes: SIT
Post & Beam
Shear Anchors
Ext Sheath/Shear
Ina Sheath /Shear J G — CO ley //�- `e.
Framing l ! � !J
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Are Alarm
Susp'd Ceiling
Roof
Q ti p_
i
4 1 PART FAIL
PLUMBING
Post & Beam
Under Slab
Rough -In
Water Service
Sanitary Sewer
Rain Drains
Catch Basin / Manhole
Storm Drain
Shower Pan
Other:
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough -In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough -In
UG/Slab
Low Voltage
Fire Alarm
Final Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE 0 Please call for reinspection RE: 0 Unable to inspect — no access
Fire Supply Line J a / iD
ADA / (p
Approach/Sidewalk Dat Inspector Ext
Other:
Final DO NOT REMOVE this Inspection record from the job site.
' PASS PART FAIL