Permit CITY OF TIGARD PERMIT
PERMIT #: BUP2000 -00190
DATE ISSUED: 5/25/00
, 4r � DEVELOPMENT SERVICES
" r ' 11 � 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171
SITE ADDRESS: 09800 SW WASHINGTON SQUARE RD PARCEL: 1S126C0 -01107 '
SUBDIVISION: SEARS ZONING: C -G
BLOCK: LOT: JURISDICTION: TIG
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION
CLASS OF WORK: OTR FIRST: sf N: S: E: W:
TYPE OF USE: COM SECOND: sf PROJECT OPENINGS?
TYPE OF CONST: UNK : sf N: S: E: W:
OCCUPANCY GRP: M TOTAL AREA: 0.00 sf ROOF CONST: FIRE RET?
OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED:
STOR: HT: ft GARAGE: sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED
FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET:
DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC:
BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING:
VALUE: $ 226,936.00
Remarks: Reroof permit, remove existing single ply of roof.
Owner: Contractor:
PPR WASHINGTON SQUARE LLC . FREAS ROOFING
BY THE MACERICH COMPANY 489 N 8TH ST
ATTN: JANET FISHER, ASSET MGNT HOOD RIVER, OR 97031 -1185
SiP11one ONICA, CA 90407 Phone: 541 - 386 -7663
Reg #: LIC 68802
FEES REQUIRED INSPECTIONS
Type By Date Amount Receipt Dryrot after tear -off
PRMT DEB 5/25/00 $1,140.25 0002434 Final Inspection
5PCT DEB 5/25/00 $91.22 0002434
Total V •
$1,231.47 CS)\\
•
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR.
Specialty Codes and all other applicable law. All work will be done in accordance with approved plans.
This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility
Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -1987. You
may obtain a copy of these rules or direct questions to OUNC by calling (503) 246 -1987.
•
Pe rm itee
Signs e:
Issued 1 4 L,1
Call 639 , 175 by 7 p.m. for an inspection the next business day
05/12/00 FRI 09:41 FAX 503 598 1960 CITY OF TIGARD I002
. ■
CITY OF TIGARD Plan eck :
13125 SW HALL BLVD. Rec'd :
TIGARD OR 97223 RE-ROOFING PERMIT APPLICATION Date Ree'd: 5 -7-0
V- 503-639-4171 X304 Date to PE: -----
F-503-598-1960 Date to DT:
Permit 12--acone5
rmit #: - (99
Incomplete or Illegible applications will not be accepted Called:
Name of Development/Business TM MA PAMMPA.,. SM .7
bE.C49.6 "MillatOralaa-06.010,APAPPeKda0- LOMMAMOT:MTP
Street Address Ste # Please fill out applicable section and attach copy of roofing -
Job Site 5R00 . .s.; (Appeal ie-671 ...) eel . specifications.
Bldg # 1,4/State Zip ser 'bly
h 6 g'722 3 A.
Name 1 1. Specification #: ...,? 11--- 6 n gri -
-;- ettf Its (0.
Applicant Meil -1
lAddress . 14 2. Manufacturer 7S 0 *...) V 1 LL C.-
City/State Zip Phone na UL Classification: et
( S 3 T i •
*IVO et tka, a9705
1*
Roofing Ni arnal . ,; Listed UL Building Materials Directory Page #: 221
Contractor rczt-'05 vez r kv (OR) , -
(Prior to issuance VIM, Addrem A 4. r.r *3b Wamock Hersey :
applicant must U , '0 — 5T -
provide a copy of City/State /Listed Warnock Hersey Directory Page #:
all contractor t„Ez Q lop 0 44 ( .. iiii
*COPY OF ASSEMBLY REQUIRED
licenses if Phone # (Fax # 2,
expired in COT 51/) .04 .., 7•1 - )‘ - ro - " t' 7 B. !CBO Research #:
database) MI Board # liate
1
DATED: if
Wijkkit4101010fAilVitialMEE:=Eita C. SPECIAL PURPOSE ROOFING: WOOD SHAKES
• Building - Type Of Use: (circle one) (review required by plans examiner)
SF SFA COM MF
Building - Type of Construction: VALUATION OFIROJECT S , e ...,.., oz.-
,....
sq.,ft. icioa Wof roof area
Existing Deck Type: . ' Permit fee based on valuation*
Combustible ( ) Non-Combustible * see chart on back - -2 //
0 ,`" ---)
_ :t .dcreggitoonatM t :Gtp66:450ifogIvAacycinplimeszio 41
- . - -. . - - - - ---- - - ' ------- • --A-- ,-._., _:,..L.,,,, ...-.a,,-...,-,A.I.g.i _..,,
a REPAIR (MAJOR) (review required by plans examiner) • v...3-:"3 iiitrji (Lt1014v.):.g.104-1'4Iliwg:•s o mi sE.k , ..If4:2.4,:'bjv.=. - f4.
Permit required ONLY when spaced sheathing is covered by . . ?/. 1?
solid sheathing. Changes to roof line require Building Permit 8% State Surcharge $
Application .eit a0",._( IEWAGOM5 -4 144 - 4.R221-Yi;g1 - 5! ,. . 1 ::
SUBMIT TWO (2) SETS OF PLANS SPECIFYING "
. - --'-' • ! ‘ 1-0 ?-. 44 t 0
'' P'.
: :'f;7 7- 7... - JEATV93 .1 2: - V :; ' -3--,-.:7-ftZ.74 . i s` r1.:Ii!=-7. , 57:;'"'"A r t h j 7 : 2- :'
A. Roof area & nearest street. *Required for major repairs of
Residential
B. Attic vents - Provide 1 sq. ft. for each 150 sq. ft. of attic or "C''. above ' 65% Plan Review $
space. Vents shall be located in the upper 1/3 of the roof. - .C.itytiis0:1601SrligMMINAPPF.n - .F 2 WV . ; 4 .-iiiAlliriIREFTP:i 1 9P : ;4t.: : .;::::M.
Provide 1 sq. ft for each 300 sq ft. when save & attic :;"1I 1-.;
venting is provided.
S_ 1 if 7
W
TOTAL $ /g -
, -o '
03411 , IM I acknowledge that I have read this application and that the
--MeAgrigtg.00,4 information given is correct that I am the owner or authorized
Describe work to be done: (check appropriate box) agent of the owner, and that the plans (if applicable) are in
O E-ROOF (circle A ,B or C) compliance with Oregon State law.
isting-beilt-ep roof coverhv to to REMOVED and deck
repaired " 44441-E- P " waa... Signature of Owner/Agent Date
B. Existing built-up roof covering to REMAIN: note applicant
must submit an engineer's review of the roof structural
elements. Review shall bear the seal (or stamp) of the
architect or engineer licensed in Oregon. Contact Person Name Telephone
C. Asphalt or wood shingle/shake
(PROCEED TO STEP 2) .--rov, i."-aits 5 --ep - 3
1:dsts■fonns\roof.res.doc
8/26/99 '
CLIA-41
C )-5 — 37 fS - Z I Col 6 3-o eD gii-r •
r
CITY 2 F RD
7100/ 90
ii; DEVELOCES DA TE ISSUED: 5/25/00
"- �� 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 '
SITE ADDRESS: 09800 SW WASHINGTON SQUARE RD PARCEL: 1S126C0 -01107
SUBDIVISION: JGTON SQUARE ZONING: C -G
BLOCK: LOT: JURISDICTION: TIG iri
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION
CLASS OF WORK: OTR FIRST: ST' N: S: E: W:
TYPE OF USE: COM SECOND: sf PROJECT OPENINGS?
TYPE OF CONST: UNK : sf N: 5: E: W:
OCCUPANCY GRP: M TOTAL AREA: 0.00 st L ROOF CONST: FIRE RET?
OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED:
STOR: HT: ft GARAGE: • sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQD SETBACKS ' j REQUIRED
FLOOR LOAD: psf LEFT: ft RGHT: ' f* FIR SPKL: SMOK DET:
DWELLING UNITS: FRNT: ft REAR: It FIR ALRM : HNDICP ACC:
BEDRMS: BATHS: IMP SURFACE: ;, 'PRO CORR: PARKING:
VALUE: $ 226,936.00
Remarks: Reroof permit, remove existing single ply of roof.
•T
. y _
Owner: Contractor:
PPR WASHINGTON SQUARE LLC FREAS RO=OFING
BY THE MACERICH COMPANY 489 N 8TH ST
ATTN: JANET FISHER, ASSET MGNT HOOD RIVER, OR 97031 -1185
SANTA MONICA, CA 90407
Phone: Phona: 541- 386 -7663
• Reg #: LAC 68802
1
FEES REQUIRED INSPECTIONS
Type By Date Amount Receipt D:yr ;_4 after tear -off
PRMT DEB 5/25/00 $1,140.25 0002434
Final inspection
SPOT DEB 5/25/00 $91.22 0002434 `-
Total $1,231.47 EXPIRED
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes IX
and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is C
not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law
requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 'Ni
952 - 001 -0010 through OAR 952 - 001 -1987. -You may obtain a copy of these rules or direct questions to OUNC by ,
calling (503) 246 -1987. Y
_ 0
Permitee O
Signature:
Issued By:
•
Call 639 -4175 by 7 p.m. for an inspection the next business day
N O
O
BUP - Building Permit ELC - Electrical Permit
I Inspection Description Date Passed By J Inspection Description Date Passed By
Footing /Setback Underground cover
Foundation walls Wall cover
Footing drain Ceiling cover
Waterproof bsmt walls Electrical rough -in
Slab Electrical service
Crawl drain Electrical final
Underfloor insulation
Post/beam structural
Shear walls /anchors ELR - Restricted Energy Permit
Roof nailing J Inspection Description Date Passed By
Firewall Low voltage
Tilt -up panel Electrical fmal
Masonry/Reinforcement
Framing
MFG - Structure set -up MEC - Mechanical Permit
Insulation ~LL,_ _ :;
D wall nailin: Inspection Description Date Passed By
Post/beam mechanical
Suspended ceiling
Gas line
•
Engineered soils
Welding Lab Final Mechanical rough -in
Fire damper
Concrete Lab Final Duct work
Bolting Lab Final Smoke detector
Fireproofing Lab Final Mechanical final
Structural observation
Final inspection
PLM - Plumbing Permit
Inspection Description Date Passed By
BUP - Fire Protection System Permit Plumbing underslab
Inspection Description Date Passed By Crawl drain
Sprinkler underfloor /slab Post/beam plumbing
Sprinkler rough -in Plumbing top -out
Sprinkler final RP /backflow preventer
Fire alarm final Rain drain
Storm drain
Water service
SIT - Site Permit Sanitary sewer
11 Inspection Description Date Passed By Culvert/catch basin
Footings Pump /fill septic tank
Foundation walls Plumbing final
Sprinkler supply lines
Sprinkler underfloor /slab
Catch basin /Manhole SWR - Sewer Permit
Engineered soils 1 Inspection Description Date Passed By
Engineering acceptance Sanitary sewer
Final inspection Final inspection
INSPECTION RECORD - BUP, PLM, SWR, ELC, ELR, MEC SIT PERMITS