Loading...
Correspondence OFFICE COPY ¥y Zoe Schmidt Contractors 2830 S. Grand Boulevard Spokane, WA 99203 RE: TENANT IMPROVEMENT @ WASHINGTON SQUARE MALL Building Permit: BUP2004 -00085 Occupancy Type: B Tenant Name: NUVO Construction Type: VN - Address: 9718 SW Washington Square Road Occupant Load: 9 Area: 2540 Sq Ft Stories: 2 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans are approved subject to the following conditions. 1. Provide one 2 -A rated fire extinguisher so that no usable space has a distance greater than 75 feet to the extinguisher. Standard 10 -1, Chapter 3 TVFR99 -01. 2. Deferred Submittal items; • Structural calculations and design for header in detail E/S 1. • Structural calculations and design for new "Storefront Framing ". Deferred submittals will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA requirements for the structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC which may not include all of the requirements of the ADA. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC Certificate of Occupancy: No building or structure shall be used or occupied until the Building Official has issued ace• cate of occupancy 109.1 OSSC Respectfull Brian Bla • ck, Senior Plans Examiner 3. -“P cog- cfrt' 7 &S • 0. 1111111111h sdIIIIII JEFF A. ANDERSON, INC. E-MAIL: jeffa @blackfoot.net 113 WEST FRONT, SUITE 201, MISSOULA, MONTANA 59802 PH/FX: (406) 880-7823 / 541-7824 April 5, 2004 City of Tigard. Attn: Brian Blalock 13125 SW Hall Blvd. Tigard, OR 97223 RE: Tenant Improvement for Nuvo International Tenant space #F -5 - Washington Square Mall - VIA FAX 503- 624 -3681 Brian, 4 For your review and approval, enclosed are th drawings in response to you review comments letter dated March 30, 2004. Comment #1 : Attached is a typical wall detail to be inserted in the set as 4/A5. Comment #2 : Attached is a revised detail 10 /A5 to replace the detail in the drawing set. A separate detail will be provided for the entry area gyp. bd. ceiling in conjunction with the storefront framing. (comment #5) Comment #3 : We ask that -this item be deferred until the structural engineer can complete the work. The detail and the calculations will be sent immediately when available. . Comment #4 : Attached is a revised detail C /S1 to replace the, detail in the drawings. Comment #5 : We ask that this item be deferred until the structural engineer can complete the work. The detail and the calculations will be sent immediately when available. Please feel free to contact me directly by telephone or e-mail if you have any questions. Sincerely, Jeff t . Anderson AlA JEFF A. ANDERSON, INC. E-MAIL jeffa @blackfoot.net 113 WEST FRONT, SUITE 201, MISSOULA, MONTANA 59802 PH/FX, (406) 880-7823 / 541-7824 2 /2:d 1892172920ST:01 :WOdj d2S:t'O 17002 -S -ddd r •F March 30, 2004 rApopmipli* Ron Hoel CITY OF TIGARI Schmidt Contractors OREGON 2830 S. Grand Boulevard Spokane, WA 99203 RE: TENANT IMPROVEMENT @ WASHINGTON SQUARE MALL Building Permit: BUP2004 -00085 Occupancy Type: B Tenant Name: NUVO Construction Type: VN Address: 9718 SW Washington Square Road Occupant Load: 9 Area: 2540 Sq Ft Stories: 2 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The following information is required prior to the approval of the submitted plans. 1. Provide a cross section indicating typical wall construction for the walls indicated by note 6 on sheet Al & A2. 2. Provide structural connections for the soffit indicated in detail 10 /A5. Connections should identify the plate /track connection to the trusses, stud connection to the plate /track and connections for any bracing to the soffit and to the supporting structure. 3. Provide structural calculations for the header indicated in detail E/S 1. Also, what supports the other end? 4. Provide support for the heel of the stair stringer indicated in detail C/S 1. As drawn, the member will fail. 5. Provide structural calculations for the new "Storefront Framing' indicated on sheet S 1. The calculations shall identify all loads including loads from materials spanning the new entry and clearly indicating how the loads will be transmitted to and supported by the structure. Please provide an item by item response. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respect , n :/' ock, Senio lans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772