Loading...
Correspondence , • City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 February 11, 2009 1111 • ., RE: TENANT IMPROVEMENT T I GARD Project Information Building Permit: BUP2009 -00018 Construction Type: 2 -B Address: 9724 SW Washington Sq. Occupancy Type: M Area: 8187 Sq. Ft. Stories: 1 Name: Gap Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; 2007 Oregon Fire Code. Please respond to conditions below. 1) Please provide engineered design for the grid ceiling supports, including seismic struts, taking into consideration the approximate 17 -20 ft. of interstitial space between the ceiling tile and the roof. Please include all calculations for engineered designs with all submittals. OSSC106.1 2) Provide calculations and construction details (including seismic bracing details for non full height partitions) for all walls. Note: The roof structure is approximately 30' above the finished floor. OSSC 106.1 3) Please provide calculations and construction details for the soffits and storefront construction. Every structure, and portion thereof, including non structural components that are permanently attached to structures and their supports and attachments, shall be designed and constructed to resist the effects of earthquake motions in accordance with ASCE 7 as modified by Section 1613.7. The seismic design category for a structure is permitted to be determined in accordance with Section 1613 or ASCE 7. OSSC 1613.1 4) Please submit plans and calculations for steel storage racks that comply with the design requirements of ASCE7 (15.5.3). When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Dan Nelson Senior Plans Examiner (503) 718 -2436 dann @tigard- or.gov Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard- or.gov • TTY Relay: 503.684.2772 3v,aa09- /c ' 97071-/ A444. $t. go/ BARRY LEVIN & ASSOCIATES, Inc. STRUC7'URA! ENGINEERS Atlanta e Los Angeles • New York • Chicago May 28, 2009 Greenberg Farrow Architecture 1430 West Peachtree Street, # 200 Atlanta, GA 30309 • Attn Mr Oscar Flores Moreno BLA Project No.: 208067 Project Name GAP — Washington Square- # 2805 — Tigard- OR Reference: Answer to RFI # 14 Dear Oscar: Per your request, please find below the answer to the RFI # 14 in regard the installation of the gypsum board ceiling on the above referenced store located in Tigard, Oregon. According to the information received from the manufacturer, the specifications of the project and the architectural drawing A6 -1 of the project, this is our understanding of the system that was installed at the mentioned building I- Framing of the ceiling provided by "Armstrong World" using a T shape HD 8906 (Armstrong Catalogue) as a main runner, spaced every four feet on center and running continuously from wall to wall. The ceiling is suspended from the structure of the roof above, with # 12 SWG galvanized steel wires every three feet and a continuous wall molding at the perimeter of the ceiling using 20 gauge "L" metal wall angle screwed off with #8 screws every 24" to 32" on center depending on the stud layout of the wall were attaching to. The cross runners are spaced every 16" on center using the Armstrong reference shape XL8945P 2- The ceiling type used is 5/8 gypsum board attached to framing at the perimeter According to the governing codes IBC 2006, ASCE 7 -05, the ESR -1289, the Guidelines for Seismic Restraint for Direct -hung Suspended Ceiling Assemblies (CISCA zones 3-4) and the Oregon local requirements this type of ceiling "gypsum board ceiling" is exempt from the lateral force bracing requirements. Lateral force bracing is the use of vertical struts (compression posts) and splay wires. Based on the above information, the installation of the referenced ceiling is structurally adequate If you have any questions, please call 5 �ED PR OA? ' ' NG1N ` Sincerely, � � � 16442P` R 29 Barry Levin and Associates, Inc. OREGO Project Manager GPI cc Mr Bill Bornhorst / Mr Jon Wittlin 4 RRY EXPIRATION DATE: 7' 3 F d/0 6675 Peachtree Industrial Blvd. • Suite 200 • Atlanta, Georgia 30360 Tel • 770 457 2376 • Fax 770 457 0514 • www BarryLevin corn