Inspection CITY OF TIGARD 24 -Hour
BUILDING Inspection Line: (503) 639 -4175
INSPECTION DIVISION Business Line: (503) 639 -4171 MST
BUP
Received Date Requested � AM PM BUP
Location lZ Zso ,N h 1S 7 l-M Suite MEC
Contact Person // -- �(PAn Ph ( ) te1Z-5 ,3-C() 2
--
Contractor 14 c St- Q —�J'� C7 e-VvP i ( ) SWR
BUILDING Tenant/Owner ELC
Footing
Foundation ELC
Access:
Ftg Drain ELR
Crawl Drain
Slab Inspection Notes: SIT
Post & Beam
Shear Anchors
Ext Sheath/Shear
Int Sheath/Shear _
Framing
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Other: _
Final
PASS PART FAIL
PLUMBING
Post & Beam i 1 -
Under Slab
Rough-In (6114,_,C)
Water Service
Sanitary Sewer
Rain Drains
Catch Basin / Manhole
Storm Drain
Shower Pan
Other:
Fin
(' ; PART FAIL
' ' ICAL
Post & Beam
Rough -In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough -In
UG /Slab
Low Voltage
Fire Alarm
Final ❑ Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd.
PASS PART FAIL
SITE ❑ Please call for reinspection RE: Unable to inspect — no access
Fire Supply Line
ADA Q /30
Approach/Sidewalk Date % / 3 Inspector Ext
Other: •
Final DO NOT REMOVE this inspection record from the Job site.
PASS PART FAIL