Loading...
Permit AL RECE WED : . ° III e Building Divis DEC 2 4 2012 Development Code Provision Revie • Cfry of TIGARD T[GARD Commercial Projects with Approved Land LinLDfNG DIVISION Building Permit No.: P o9 b 1 A - CO / SO Land Use Casefile No.: MME Ao/ a- OCX /ref .-ou rg0 Routed Plans: / PGA,J J1,j E, . PC. Submittal Date: /A any /V Submittal Date: (( A a # .oc, - f. n o eGC Submittal Date: To the Applicant: Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies to the Building Division. Only checked (✓) items are approved. Items not approved and those listed in the notes must be revised prior to re- submittal. For questions please contact the appropriate staff person(s) listed above each section. STAFF: please only mark those items on the left side that are approved. Planning Review (contact t4 I . at 503 -718 -2'1 or � @tigard- or.gov) A:rLand Use Approval ❑ Building Plans Match Approved Plan: Yes ❑ No ❑ 7 ❑ Maximum Building Height ❑ Conditions Met ❑ Street Trees ❑ Protected Trees Notes: go ' � /w 0 I 5 L kii ` eh - s bv(+ -pl MIL. Ervi.e. / w 1i,/ ,e1 f4f 4e ;1.0 obi / -7 - 13 I Original Plan: Approved .W Not Approved ❑ Date: / 2 " - / Revision 1: Approved ❑ Not Approved ❑ Date: Revision 2: Approved ❑ Not Approved ❑ Date: (Review Continues on Page 2) Page 1 of 2 Engineering Review (contact Mike White' t 503 - 718 -2464 or MikeW @tigard - or.gov) ❑ Actual Slope: % x ❑ PFI Permit # ❑ Conditions Met Notes: Original Plan: Approved Not Approved ❑ Date: 1 6/ (2- Revision 1: Approved ❑ Not Approved ❑ Date: Revision 2: Approved ❑ Not Approved ❑ Date: Permit Coordinator Review (contact Albert Shields at 503 - 718 -2426 or albert @ tigard - or.gov) ❑ Planning Okay to Issue Permit ❑ Arborist Okay to Issue Permit ❑ Engineering Okay to Issue Permit Notes: Original Plan: Date Sent to Applicant: Revision 1: Date Sent to Applicant Revision 2: Date Sent to Applicant Okay to Issue Permit: Yes ❑ No ❑ Date Routed to Building: Page 2 of 2 FOR OFFICE USE ONLY — SITE ADDRESS: /022/ 0/&) e,., — 'D 6. /E This form is recognized by most building departments in the Tri -County area for transmitting information. • Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 511 o Transmittal Letter T I G AR 1a 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard- or.gov TO: (//9 DAT Ii i".:::f ,E,(NE DEPT: BUILDING DIVISION _ DEC 24 2012 FROM: t), S A-1 /4 `5 CITY OF TIGARD e- Yo(Ai—) d A5 8t11LDtNG DIVISION DIVISION COMPANY: — 8 PHONE: 559-,2„9-2,- '&.0.0 c RE: /Do 3f Ac() 64 ,t iir.)E 4-t d dD /a -zro / S) (Site Address) 1 °"° -,,m0,.,!,------ 6/e. - Ne_ Si / .eD Gvf19- \ G, PLRarJ� rim (Project name or subdivision name and lot number) b b ATTACHED ARE THE FOLLOWING ITEMS: Ptl '4E't Copies: Description: Copies: i • • . •' . • - Additional set(s) of plans. d Revisions: - Ob_rf! 5 j Cross section(s) and details. Wall bracing and/or lateral analysis. Floor /roof framing. Basement and retaining walls. Beam calculations. .....3 Engineer's calculations. Other (explain): REMARKS: FOR FFIF E USE ONLY // \, Routed to Perm' echnici Date: '' ( '7 /' (3 // Initials Fees Due: Yes H'No Fee Description: /,/ Amount ue: /1 $ tkeD17, M am/ (t k) (' $ )P4), '---) \ $ $ Special / Instructions: _ �� Reprint Permit (per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: I:\ Building\ Forms \TransmittalLetter- Revisions.doc 05/25/2012 RECB'IED DEC 2 4 201Z W - BRAD YOUNG & ASSOCIATES Inc. p�TIGAF�D STRUCTURAL ENGINEERING CITY BUILDING DI N / 61°1° Transmittal BYA Project #: 12109 Date: 12/20/2012 Number of pages including the transmittal: To: City of Tigard Attn: Dan Nelson From: Travis Thomas Subject: Orchard Supply Hardware — Tigard, Or. Comments: Attached are 3 copies of the structural drawings and calculations for the delta 5 revisions. Please feel free to call me if you have any questions. Thank You, Travis Thomas, PE Project Manager Brad Young & Associates, Inc. 559- 222 -9600 ph 559- 222 -9633 fx 1320 W. Herndon Ave, Suite 101 • Fresno, California 93711 • 559- 222 -9600 • 559- 222 -9633 Fax www.byaengineering.com )1 - P1 e {L erg uP 1/21 (13 FOR OFFICE USE ONLY — SITE ADDRESS: /0 o a / , 64 -keno g �)11 This form is recognized by most building departments in the Tri -County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT _ . ' Illq Transmittal Letter T I G n R f) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard- or.gov TO: ( >a.t/■_____ DATE R,-,P DEPT: BUILDING DIVISION JAN 10 2013 • FROM: 6 I e, .0, _•i 44 CITY OF TIGARD COMPANY: I / BUILDI DIVISIO PHONE: C /J y: RE: l �� d CiAloL�7� `v c � /A /5o (Site Address) (ermit um,er C)i— 6 2 6,..<_,04)/ / // -- 2rv,9€_. (Project name or subdivision name and lot ntimber) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: 1 Additional set(s) of plans. o Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor /roof framing. Basement and retaining walls. Be. . cu . ' . - -. Engineer's calculations. • - lain): 1 / FOR OFFI E USE ONLY Routed to Pe • T- 1 i<cian: k∎ ate: ( i t• Initials: Fees Due: • Y: E o F ee Description: Amount Due: $ — $ Special ---) Instructions: Reprint Permit (per PE): ❑ Yes I AD No ❑ Do Applicant Notified: Date: /. /(,� // .b-2 � 4 Initial y (:\Building\ Forms \TransmittalLetter - Revisions.doc 05/25/2012 Debbie Adamski From: Eric Kauffman <ekauffman@waremalcomb.com> Sent: Wednesday, January 16, 2013 1:42 PM To: Debbie Adamski; Neville Willsmore Cc: Dan Nelson Subject: RE: Orchard Supply Hardware Revisions Debbie, Please route the plans an Nielson.I spoke with him on Moaysea theiarratives to him mail. Thank you, Eric Kauffma Production Cordinator d 925.480.6071 • p 925.244.9620 f 925.244.9621 ekau ffman@waremalcomb.com 2400 Camino Ramon Suite Mfl. Rmon. CA 94583 WARE MA ■T MR • • ARL� MAEOMB architecture I planning 1 interiors graphics I civil engineering 4® YEARS Celebrating Creativity, OF DESIGN Collaboration & Optimism! find us on. waremalcomb.com I facebook I twitter I linkedin From: Debbie Adamski [mailto:DEBBIECatigard- or.gov] Sent: Wednesday, January 16, 2013 1:36 PM To: Neville Willsmore; Eric Kauffman Cc: Dan Nelson Subject: Orchard Supply Hardware Revisions Neville & Eric, We received 2 sets of revisions on Thursday, 1/10/13 by FedEx (I think). There was not a transmittal letter with the 2 plan sets submitted. They are pages A0.1, AD.1, A2.1, A2.2, A6.6, A7.1, M2.2, M3.1, P1.0, P2.2, P3.1, E0.3, E2.1, E3.1 & 4.1. Can you let me know what they are for and who requested them. Thanks! 1 rim Debbie Adamski x a seninr P ntit Technician E oiaECr 503.718.2>150 EMAIL debbiel @tigard or. - WEB www.tig City cif Tigural I rcr%tatt:Nt'ry rtr.vi:r.oi'. u. "r 1312S SW Hall Boulevard, Tigard. OR 97223 DISCLAIMER: E -mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E -mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." • 2 Dan Nelson From: Eric Kauffman <ekauffman @waremalcomb.com> Sent: Thursday, January 10, 2013 9:46 AM To: Dan Nelson Cc: Anthony Cataldo; Neville Willsmore Subject: Bulletin #6 for Orchard Supply at 10031 SW Cascade Blvd Attachments: Delta -6 Narrative.pdf; 22753 OSH Tigard V3 HWSets.pdf; 1 -9 -13 Delta 6 Narrative.pdf Dan, Please see the attached narratives and door hardware schedule for Bulletin #6 for Orchard Supply at 10031 SW Cascade Blvd. The 2 printed sets of the revised sheets of Architectural and MEP was sent overnight to arrive to you today. Please let me know if you need anything else. Thank you, Eric Kauffman Production Coordinator d 925.480.6071 p 925.244.9620 f 925.244.9621 ekauffman @waremalcomb.com 2400 Camino Ramon Suite 390. San Ramon. CA 94583 WARE MALCOMB architecture I planning I interiors graphics I civil engineering 40 YEARS Celebrating Creativity, OF DESIGN Collaboration & Optimism! find us on. waremalcomb.com I facebook I twitter I linked in 1 WARP' MALCOMB Leading Design for Commercial Real Estate architecture planning interiors graphics site development Delta 6 Narrative Date: January 10, 2013 Project Name: Orchard Tigard To: Dan Nelson Project No.: SNR12- 0011 -01 From: Eric Kauffman Narrative Delta 6 Narrative Copies To: ESI Title: Delta 6 Client Revisions PLAN REVISIONS: The following changes have been made to the above referenced project and a Delta #6 01 -07 -13 "Client Revisions" and clouds have been added to the plan to indicate where the changes have taken place. Delta Sheet: Revision to plan: 6 A0.1 Title sheet (no changes). 6 AD.1 Demo existing roll up doors Note added 6 A2.0 Revised restroom /office area layout Updated path of egress per new layout 6 A2.1 Added infill walls where roll up doors were removed Updated the location of the openings in wall along grid line G Moved the notation for "prep to weld shut" to adjacent door per egress plan. Revised restroom /office area layout 6 A2.2 Revised restroom /office area reflected ceiling layout 6 A6.2 Revised nursery entrance columns. 6 A6.6 Revised restroom plan and ceiling plan per revised layout 6 A7.1 Revised door schedule to include door hardware numbers CIVIL 6 C2.0 Additional Erosion Control Measures added for Sanitary Sewer installation 6 C3.0 Additional Roof Drain laterals provided per WM request 6 C3.1 Additional Sanitary Sewer service to serve relocated restrooms per WM request 6 C4.4 Details provided for Sanitary Sewer installation waremalcomb.com - 5000 executive parkway suite 298 san ramon. california 94583 p 925.244.9620 f 925.244.9621 M: \Jnhs12 \Oppidan \SNR12 - 0011 -01 Orchard_ Tigard \Admin \Bulletin \Bulletin 06 \ _NARRATIVES \Della -6 Narralivc.duc Page 1 SpeXtra # 22753 Heading SL -01 1 SL Door 100 EXTERIOR / VESTIBULE 1 SL Door 100A EXTERIOR / VESTIBULE 1 SL Door 100C EXTERIOR / VESTIBULE 1 SL Door 112 FUTURE GREENHOUSE / SALES AREA 1 SL Door 111 NURSERY / SALES AREA 1 SL Door 100B VESTIBULE / SALES AREA Each Assembly to have: 1 EA MORTISE CYLINDER 80 -133 626 SCH ((VERIFY EXTERIOR OR INTERIOR) 1 EA PERMANENT CORE BY OWNER 626 BES BALANCE OF HARDWARE BY AUTOMATIC SLIDING ALUM. STOREFRONT DOOR SUPPLIER Heading 01 1 SGL Door 101 EXTERIOR / SALES AREA Each Assembly to have: . 4 EA HW HINGE 5BB1 HW SH 4.5 X 4.5 NRP 630 IVE 1 EA ELEC PANIC HARDWARE RX- ALK -99 -EO 626 VON 1 EA MORTISE CYLINDER 80 =132 626 SCH (@ ALARM) AT ALARM 1 EA PERMANENT CORE BY OWNER 626 BES 1 EA LOCK GUARD LG1 630 IVE 1 EA SURFACE CLOSER 4040XP SCUSH TBWMS 689 LCN 1 EA DRIP CAP 16A CL NGP 1 SET SEALS 5020B BRN NGP 1 EA DOOR SWEEP C627A CL NGP 1 THRESHOLD AS REQUIRED BY THRESHOLD SILL AL NGP DETAIL 1 EA DOOR VIEWER 698' 626 IVE (Where indicated on door schedule) Heading 02 1 DA Door 102 SALES FLOOR / RECEIVING STOCK ROOM Each Assembly to have: ALL HARDWARE BY DOOR RUBBAIR DOOR SUPPLIER / MANUFACTURER. Heading 03 1 SGL Door 106 HALLWAY / BREAK ROOM Each Assembly to have: 4 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA PASSAGE SET ND1OS RHO 626 SCH 1 EA SURFACE CLOSER 4040XP TBWMS 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW 630 IVE 1 EA WALL STOP WS406CVX 630 IVE 1 SET SEALS 5020B BRN NGP Heading 04 1 SGL Door 107 HALLWAY / CONFERENCE ROOM Each Assembly to have: 4 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA CLASSROOM LOCK ND7OHD RHO 626 ' SCH 1 EA PERMANENT CORE OWNER SUPPLIED 626 SCH 1 EA SURFACE CLOSER 4040XP TBWMS 689 LCN 1 EA KICK PLATE 840010" X 2" LDW 630 IVE 1 EA WALL STOP WS406CCV 630 IVE 1 SET SEALS 5020B BRN NGP Heading 05 1 SGL Door 110 HALLWAY / OFFICE 1 SGL Door 108 HALLWAY / COMPUTER MPOE / MDF Each Assembly to have: 4 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA STOREROOM LOCK ND8OHD RHO 626 SCH 1 EA PERMANENT CORE OWNER SUPPLIED 626 SCH 1 EA SURFACE CLOSER 4040XP TBWMS 689 LCN 1 EA WALL STOP WS406CCV 630 IVE 1 SET SEALS 5020B BRN NGP Heading 06 1 SGL Door 105 VEST / JANITOR Each Assembly to have: 4 EA HINGE 5BB1 4.5 X 4.5 652 IVE 1 EA STOREROOM LOCK ND8OHD RHO 626 SCH 1 EA PERMANENT CORE OWNER SUPPLIED 626 SCH 1 EA KICK PLATE 8400 10" X 2" LDW 630 IVE 1 EA WALL STOP WS406CVX 630 IVE 3 EA SILENCER SR64 GRY IVE PERMANENT CORE BY OSH. Heading 07 1 SGL Door 104 VEST / WOMEN'S RESTROOM 1 SGL Door 103 VEST / MEN'S RESTROOM Each Assembly to have: 4 EA HW HINGE 5BB1 HW 4.5 X 4.5 652 IVE 1 EA PUSH PLATE 8200 8" X 16" 630 IVE 1 EA PULL PLATE 8302 10" 4" X 16" 630 IVE 1 EA SURFACE CLOSER 4040XP 689 LCN 1 EA KICK PLATE 8400 10" X 2" LDW 630 IVE 1 EA WALL STOP WS406CVX 630 IVE 3 EA SILENCER SR64 GRY IVE RESTROOM SIGNAGE BY OTHERS Heading 08 1 SGL Door 113 Each Assembly to have: ALL HARDWARE BY DOOR MILLWORK DOOR SUPPLIER. Heading EXST -1 1 SGL Door EXISTING -2 EXTERIOR / RECEIVING STOCK ROOM 1 SGL Door EXISTING -3 EXTERIOR / RECEIVING STOCK ROOM 1 SGL Door EXISTING -6 EXTERIOR / SALES AREA 1 SGL Door EXISTING -7 EXTERIOR / SALES AREA 1 SGL Door EXISTING -4 EXTERIOR / RECEIVING STOCK ROOM Each Assembly to have: 1 EA ELEC PANIC HARDWARE RX- ALK -99 -EO 626 VON 1 EA MORTISE CYLINDER 80 -132 626 SCH (@ ALARM) 1 EA PERMANENT CORE BY OWNER 626 BES 1 EA LOCK GUARD LG1 630 IVE EXISTING DOOR AND FRAME TO REMAIN. MODIFY EXISTING & FRAME AS REQUIRED FOR NEW HARDWARE. Heading EXST -2 1 SGL Door EXISTING -5 EXTERIOR / RECEIVING STOCK ROOM Each Assembly to have: 1 EA STOREROOM W /DEADBOLT L9480L LLL 06A L283 -150 626 SCH 1 EA MORTISE CYLINDER 80 -132 626 SCH (@ ALARM) 1 EA PERMANENT CORE BY OWNER 626 BES 1 EA EXIT ALARM EAX -500 GRY DET EXISTING DOOR AND FRAME TO REMAIN. MODIFY EXISTING & FRAME AS REQUIRED FOR NEW HARDWARE. Heading G -02 1 SL Door 111B EXTERIOR / NURSERY 1 SL Door 112B EXTERIOR / NURSERY Each Assembly to have: 1 EA PADLOCK L /CYL -SFIC KS41 D1200 606 SCH 1 EA SFIC CONST. CORE 80 -035 SCH BALANCE OF HARDWARE BY GATE MANUFACTURER PERMANENT CORE BY OSH. Heading G -03 1 SGL Door 111A EXTERIOR / NURSERY 1 SGL Door 112A EXTERIOR / NURSERY Each Assembly to have: 4 EA HINGE /PIVOTS BY GATE SUPPLIER B/O 1 EA ELEC PANIC HARDWARE WP- RX- ALK -99 -EO 626 VON 1 EA MORTISE CYLINDER 80 -132 626 SCH (@ ALARM) 1 EA SURFACE CLOSER 4021 SRI 689 LCN 1 EA MOUNTING PLATE 4020 -18 SRI 689 LCN 1 EA FLOOR STOP FS18L BLK IVE BALANCE OF HARDWARE BY GATE MANUFACTURER FIELD DRILL 5 EACH EQUALLY SPACED 1/8" WEEP HOLES IN BOTTOM OF PANIC DEVICE PERMANENT CORE BY OSH. End of Schedule FOSTER DESIGN GROUP Suite1Cowan Suite #230 Irvine Ca 92614 CONSULTING ENGINEERS INC. Ph9492539630 Fax 949 253 9628 January 9, 2013 Eric Kauffman Ware Malcomb Architects 2400 Camino Ramon, Suite 390 San Ramon, CA 94583 Reference: OSH - Tigard FDG Job #12 -052 Dear Eric, This letter is a brief description of revisions made to the MEP drawings as part of Delta 6. Mechanical Sheet # Response MO.1 Revised ventilation calc for revised floor plan. M2.2 Revised floor plan for new office /restroom layout, etc. M3.2 Revised roof plan to match new office /restroom layout. Plumbing Sheet # Response P1.0 • Revised location and invert elevation of new sewer line coming out of the southwest corner of the building. P2.2 • Revised plumbing utilities for new restroom and break -room sink location along with associated notation. P3.1 • Revised plumbing piping layout for new location of restrooms and break -room that moved to the southwest corner of the building. Electrical Sheet # Response E0.3 Revised Fixture Type 3 to OSH standard for outdoor applications. PAGE 1 FDG CONSULTING ENGINEERS INC. E2.1 Revised lighting: Office 'area, Nursery and Track Lighting. Added (6) Type J fixtures in Nursery. E3.1 Revised power for Office areas. Added display receptacle in Nursery. Revised power at cashier area. E4.1 Revised circuits in Panels D and L. Sincerely, FDG Consulting Engineers PAGE 2 • , ,,.. I { _ GENERAL CONTRACTORS & CONSTRUCTION MANAGERS 3330 E Louise Dr Suite 300, Meridian, ID 83642 --- - Phone (208) 362.3040 Fax (208) 362.3113 EJ____' :FE0 S RE 5 (Nt. {I www.eslconstruction.com .>M ... x . OR Contractor's License 77160 LETTER OF TRANSMITTAL #C060 -71 Date: 12/11/2012 Page 1 of 1 [To: WARE MALCOMB Project ORCHARD SUPPLY HARDWARE 2400 CAMINO RAMON, SUITE 390 #0741, TIGARD, OR SAN RAMON, CA 94583 10031 SW CASCADE AVE TIGARD, OR 97223 ATTN: ERIC KAUFFMAN ESI Job No: C060- Phone: 925 - 244 -9620 Fax: 925-244-9621 Architect Project No: Email: ekauffman @waremalcomb.com Item Description Copies Status Remarks 210000-01 Are Protection 1 For Your Approval Notes: WARE MALCOMB 14.6.90.,-, fa Ca—n ial Red Es.an repaid= b ,902 TISduPiD ,. sia2- Qj!"6° 1Iir1Fte 93e TtO► • D NOSXCEPTIONSTAKEN D MAKE COxREC3rONSNO ,.D RA FOR REVIEW ONLY ❑ REVISE AND RESUB T D Ajco 0 SMUT SrsaFrED UFA grow body for MnlRmctee with el* deslrs cc xvpl et th2 F :oj i and Brost cebpSsnot weal the 1 ifo rm:Ian given kk t.+e c::1.vrt ecru-_-;49. As CZ" .t.• 11110•m is idlest to Qr rovten nts et the pleats aid c, ,:;1, -al K-s. Ct+ri: ar =r is ttlifMAle IOr di'tllwsicnt which shahte mei:ma:14ri crarl.>rc el t:-: ;_1 -: hbc.c hoe Moms and tse'hnllcxs c4 cavlr el:ar„ ¢oc= .1:u32a of iz, u�:k with est o1 ell otter cadet sad the eatsteto ;y pertorma.-1e of ;1" a m . AE Mf.Ltx::.!•d soco eXtCWive peirway Wu 205. vn ra =r•3 o S 45 Sp 4_5 244 c.:^_ : S2 2' "'r21 hew EWEO FDP AES TKETtCS agt.Y. PLEASE KATE T► sAydCJT 1$ BeitJG ' AEvab• For Your CC: Signature Approved As Action Needed TRAVIS KNUTSON Delivery Method PROJECT ENGINEER I � Shipi travisknutson @eSiconStnrction.com 'Experience ... Service ... Integrity LICENSES: AK, AR, AZ, CA, CO, GT, HI, IA, ID, IL, IN, KS, KY, LA MA, MD, ME, MN, MO, Mr. ND, NE, NV, NM, OH. OK OR, PA, SC, SD, TX. LIT, Vr, WA, WL WY AK #27939 AZ ROC 132139 CA 496242 HI BC -29254 ID RCE -31Q8 NM 098125 NV 0242668 OR CC8 #77160 FOR OFFICE USE ONLY - SITE ADDRESS: /DO3/ clGt) This form is recognized by most building departments in the Tri- County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. III City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT = T Letter T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard- or.gov TO: Dan Nelson DATE RECEIVED: DEPT: BUILDING DIVISION RECE �VED FROM: Eric Kauffman / Steve Beattie .JAN 2 9 2013 COMPANY: Ware Malcomb / Equipment Round -up CITYOFTIGARp BUILDING DIV ; ` i`�� " PHONE: 925.244.9620 / 360.576.1171 1 . RE: 10031 SW Cascade Blvd. %G4- 0 -0 ar 50 (Site Address) • (Permit Number) Orchard Supply (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: I Description: I Copies: Description: 4 Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor /roof framing. Basement and retaining walls. Beam calculations. 4 Engineer's calculations. Other (explain): REMARKS: FOR OF VI USE ONLY Routed to Permit Technici�an Date: 2 / A (3 T Initials Fees Due: ❑ Yes I U o Fee Description: Amount Due: $ _$ Special • Instructions: Reprint Permit (per PE): ❑ Yes I ❑ Don Applicant Notified: Date: , y/ . „g,,, ; A Initials. k (:\Building\ Forms\ TransmittalLetter - Revisions.doc 05/25/2012 .._...... ... _ IN . CITY OF TIGARD BUILDING PERMIT :. COMMUNITY DEVELOPMENT Permit #: BUP2012 00150 'TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 11/01/2012 Parcel: 1 S127DD01200 Jurisdiction: TIGARD Site address: 10031 SW CASCADE AVE Project: Orchard Supply Hardware Subdivision: CORAL COMMONS CONDO Lot: 14 Project Description: TI for new tenant Contractor: ENGINEERED STRUCTURES INC A CORP OF IDAHO Owner: KRAUSZ PUENTE LLC 3330 E LOUISE DR STE 300 BY THE KRUASZ COMPANIES INC MERIDIAN, ID 83642 44 MONTGOMERY ST STE 3300 SAN FRANCISCO, CA 94104 PHONE: 208 - 362 -3040 PHONE: FAX: 208 - 362 -3113 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee - Additions, Alterations, 10/30/2012 $10,473.95 Demolition Occupancy Grp: M Occupancy Load: 1286 12% State Surcharge - Building 10/30/2012 $1,256.87 Dwelling Units: 0 Plan Review 07/30/2012 $6,808.07 Stories: 1 Height: 0 ft Plan Review - Fire Life Safety 07/30/2012 $4,189.58 Bedrooms: 0 Bathrooms: 0 DC Provision Review, COM TI - Ping 10/30/2012 $256.00 Value: $1,586,661 DC Provision Review, COM TI - LRP 10/30/2012 $38.00 Info Process /Archiving - Lg $2.00 (over 10/30/2012 $108.00 11x17) Floor Areas: Info Process /Archiving - Sm $0.50 (up to 10/30/2012 $31.50 11x17) Total Area: 4924 Metro Const. Excise Tax - Commercial 10/30/2012 $2,760.00 Accessory Struct: 0 Use Basement: 0 Beaverton School CET - Non Residential 10/30/2012 $2,658.96 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $28,580.93 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: 1 Special Inspection (see plans) Fire Alarm: Yes Protected Corridors: No Smoke Detectors: Manual Pull Stations: Accessible Parking: 6 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in - • - . = with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ENTION: Orego law requires you to follow the rules adopted by the Oregon Utility Notification enter. Those rules are set forth in OAR 952- 1 -0010 through OAR 95 is -.090. You may obtain a copy of the rules or direct questions to OUNC by calling 503. .1987 or 1 800.332.2344. Is ued By: ..0 ) Permittee Signature: Call 503.639.4175 by 7:00 a.m. for the next available inspection d e. This permit card shall be kept in a conspicuous place on the job site until completion of the project Approved plans are required on the job site at the time of each inspection. • BullAin Permit A lication Commercia Rk d'° g ' 4 r !_ w s , FOR OFFICE USE ONLY 71 C1 of Tigard Received • I31 Hall Blvd., Tigard, OR 97223 L 0 Q ✓ Date 7 ' c wit.. Permit No �j(� �� — (�Q`_�� PIanR -' • a Phone: 503.718.2439 Fax: 503.598.1960 CI �, _; ri Date /By: � •, ( r �i ier Permiyg�e /� (769007 T I G A R D Inspection Line: 503.639.4175 �' ' u Date Rea. 9`3 mr;5: 1:,! i 1I 1 _� I ® See Page 2 for Internet: www.tigard- or.gov I Ii (:-;:c1', ttt t , t ,�. t ,. Noti i /0/ / X� • W'/ � Supplemental Information TYPE OF WORK EQUI D DATA: I- AND 2-FAMILY DWELLING ❑ New construction ❑ Demolition P ermit fees* are based on the value of the work performed. I ndicate the value (rounded to the nearest dollar) of all Tg.Addition/alteration/replacement ( Other: TI tok-r 1M " . ergova equipment, materials, labor, overhead, and the profit for the 3 CATEGORY OF CONSTRUCTION work indicated on this application. T ❑ I- and 2- family dwelling Commercial /industrial Valuation: $ Q Number of bedrooms: ❑ Accessory building ❑ Multi- family 1 ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: P Job site address: /Q S' U.2 / .) C4s'c4 ,6 e A--- / New dwelling area: square feet O City/State /ZIP: T1 cop1tz-t • 4 %12 -VS Garage /carport area: square feet Suite /bldg. /apt. no.: Project name: Q AQ,D 5VP71-1"( Covered porch area: square feet Cross street /directions to job site: VtRF•■•1AR.ti Deck area: square feet 6.0 V-14 fG R 0'F S . W . S C. 4 D 1.LS GStA7—`( re-1> Sc Other structure area: square feet S. v . 7 . G ASC AS $V%Jp % S,p%.*S lit S %t Of- s �ii( REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: T15, Pam), 1N11LA.Ame MrGi -.UIIA jLot no.: Permit fees* are based on the value of the work performed. 1S 12.1 t t' 0 j_ Indicate the value (rounded to the nearest dollar) of all Tax map /parcel / arcel no.: . . OO equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this appltion. - re.r3A, T impse:4414t<dls•f l'0 eXIs'C114 .4- O,000SV Valuation: sl1`f &L<r. 9 (SV 1�1.A1ta & . NeVJ 5,000 5F Oren Existing building area: p pp square feet Alit Nur- sfi}e,( Q►bprc t41 vAst..E goo? a 14117--1 New building area: S1 000 square feet ❑ PROPERTY OWNER jEL TENANT Number of stories: 1_ Name: 0 r - c - 1 ' 1 P i C = - 17. 5 F ' ( p l iAr.pw kg_ e. Type of construction: V.- $ Address: CO 4 o V l ik 1), U Oep Occupancy groups: M' 8 f 5- • City /State /ZIP: 5pItN "Z C.'PP ° °S 1'q Existing: M 1 g I Gs - a` Phone: (q•'08) ZSI. 35 Fax: (k'6 3 (0$ .-2.+2.5 New: M B I S 1 ❑ APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* Business name: WAR.I✓ hPeLC,0MS /PlearerejerrojceechednlJ "`� Structural plan review fee (or deposit): (Q 2o .0/ Contact name: NeV W� t 1.SMCi¢ ` � FLS plan review fee (if applicable): 4 l aol . Se Address: ( ( Cvra.l6v4vJ \L}i Pr-.1-4e, SV 1 115 1 City /State /ZIP: — Total fees due upon application: 1 O .....- .6 5 S�o,N �tr�(>o CR �' L1 2 '2. 1 ( es?) �3 e. • - i-2 (ese) G3.0, . o� Amount received: Phone: Fax: E -mail: n W I Its M or e. warE.MA\ connb , coL� PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR n roof -top mounted Photo Voltaic Solar Panel System. Business name: Eid e p3 €e ciTQu�Ue_t hk. A or /D6140 Submit two (2) sets of roof plan with connection details E. 2 and fire department access, along with the 2010 Oregon Address: 3 3 50 O G . /._04 t S E . z 300 Solar Installation Specialty Code checklist. City /State /ZIP: H f2, A, 4n) 1 /D g 36 4 Permit fee (includes plan revie S180.00 and administrative fees): Phone: I „t 3 ( 3O9O Fax: „Zoe- 34'Q 7 ,3 / / 3 State surcharge (12% of permit fee): S21.60 CCB tic.: 77/60 _ Total fee due upon application: $201.60 Authorized signature: , In This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: N, 4t'.'— V.31%-- \- gM OV--e Date: • ? /I( Iva_ * Fee methodology set by Tri- County Building Industry Service Board. 1 : \Building \Pennits \BUP -COM PennitApp.doc 02/24/2011 440- 4613T(l 1 /02 /COM /WEB) .51 Building Division Development Code Provision Review T I G A R D Commercial Projects with Approved Land Use Building Permit No.: - ezys- O Land Use Casefile No.: H } (T 8v9 / a _0006g Routed Plans: Submittal Date: Submittal Date: S . , 7 . Submittal Date: To the Applicant: Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies to the Building Division. Only checked (1) items are approved. Items not approved and those listed in the notes must be revised prior to re- submittal. For questions please contact the appropriate staff person(s) listed above each section. • STAFF: please only mark those items on the left side that are approved. Planning Review (contact at 503 -718- or @tigard - or.gov) _ .and Use Approval ❑ Building Plans Match Approved Plan: Yes ❑ No.-Er" ❑ Maximum Building Height 2 00 ❑ Conditions Met • Notes: 1 sE IPEV/ SE sae- 5' h *t0 5 (J( Aviv i 1 moo/ 7 cFApp fro Y�t( Original Plan: Approved ❑ Not Approved ,121 Date: 8 '2 0 '12 Revision 1: ApprovedAfr Not Approved ❑ Date: /& / L Revision 2: Approved ❑ Not Approved ❑ Date: Engineering Review (contact Mike White at 503 - 718 -2464 or MikeW @ tigard- or.gov) .ErActual Slope: 6 ❑ PFI Permit # ❑ Conditions Met Notes: Original Plan: Approved,EV Not Approved ❑ Date: / (Z Revision 1: Approved ❑ Not Approved ❑ Date: Revision 2: Approved ❑ Not Approved ❑ Date: (Review Continues on Page 2) Page 1 of 2 c y City Arborist Review (contact Todd Prager at 503 - 718 -2700 or-tod d- or.gov) ❑ Street Trees ❑ Protected Trees / Notes: Original Plan: proved ❑ Not Approved ❑ Date: Revision • Approved 0 Not Approved ❑ Date: Rev' ion 2: Approved ❑ Not Approved ❑ , Date: Permit Coordinator Review (contact Albert Shields at 503- 718 -2426 or albert @tigard - or.gov) ❑ Planning Okay to Issue Permit ❑_ Arborist Okay to Issue Permit ❑ Engineering Okay to Issue Permit Notes: Plan: Date Sent to Applicant: Revision 1: Date Sent to Applicant Revision 2: Date Sent to Ap licant Okay to Issue Permit: Yes _ i No Date Routed to Building: 10 iv I Page 2 of 2 , I Building Division ` Development Code Provision Review T[c:A Commercial Projects - No Associated Land Use Case Building Permit No: QuAS 042 - 004.5'Q ❑ Expedited Review '? Plan Submittal Date: 7/.Vo20 /dt .r To the Applicant: i2E — aQ /°Z -- 0000 ?° > If the proposed use is not permitted within the zone, please contact the Building Division to cancel the permit application. Building Permit Technicians (503) 718 -2439. If a land use is required and for all other questions, please contact the staff person listed above the Planning Review section. Staff: please check items along left only if approved. Planning Review (contact at 503 -718- or @tigard - or.gov) Zoning 11 ode Permitted Use Yes $ No ❑ El - Land Use Required: Yes Er No ❑ (explain below) 9 10 131 c td d+" ✓s6-164e Notes: P s'� /261 , 15-6 1 Ire YLif. - r pLarus pF/L ■ C' 9 r d- '-> 011 It- l-1A / In I11I ib 2ri, IZ t,00 of ❑ Approved Ja Approved Date: 8 k -/..--- Permit Coordinator Review (contact Albert Shields at 503 - 718 -2426 or albert @tigard - or.gov) Notes: Routed back to Building Division Date: V7 a , " f , 1 1 � I: \CURPLN _w. R E C E N JUL 3 0 2012 CITY CF P AA% Cardno TRANSMITTAL BUI :.NG n_'t/1810 ° WRG Shaping the Future To: Debbie Adamski Date: July 30, 2012 City of Tigard Project: OSH - Tigard 5415 SW Westgate Drive Suite 100 13125 SW Hall Blvd Project #: 2129973000 Portland, Oregon 97221 USA Tigard, OR 97223 Case /File #: Phone (503) 419-2500 Fax #: Total Pages: Fax (503) 419 -2600 From: Cardno WRG www.cardnowrg.com Transmitting Via: Purpose: Messenger ® For your approval ❑ Other: ❑ Other: Quantity Description 1 Building Permit Application 1 Check - Building Permit Fee ($10,997.65) 3 Architectural /Building Plan Set 3 Site Work Civil /Landscape Plan Set (F) 2 MEP Plan Set /f09 3 Structural Engineering Calculations 3 Stormwater Calculations • Comments: Building Permit Submittal materials for Orchard Supply Hardware, 9770 SW Scholls Ferry Road, Tigard, OR. Signature: C: Australia • Belgium • Indonesia • Kenya • New Zealand • Papua New Guinea United Arab Emirates • United Kingdom • United States • Operations in 60 Countries FOR OFFICE USE ONLY — SITE ADDRESS: 403/ O eil�" This form is recognized by most building departments in the Tri- County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. Er' City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard- or.gov TO: Debbie Martisak DATE ' ` t . 1.41 VFD DEPT: BUILDING DIVISION NOV 1 3 29 FROM: Eric Kauffman CITYOF TIGARD COMPANY: Ware Malcomb •�• BUIlDMK'D�114if10 --Ci— PHONE: 925.244.9620 RE: 10031 SW Cascade : vd. l P(96 -OD/Sa (Site Address) (Permit Number) Orchard Supply (Project name or subdi sion name a u mber) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: 2 Additional set(s) of plans. Revisions: 2 Cross section(s) and details. Wall bracing and /or lateral analysis. 2 Floor /roof framing. Basement and retaining walls. 2 Beam calculations. 2 Engineer's calculations. Other (explain): REMARKS: � � - Qa - • , _ , ^ 4 1 I ' it • .. y- Ad I ii ' 0 FOR OFFICE USE ONLY Routed to Per it Technician: Date: Initials: Fees Due: Yes [1] No Fee Description: P " j u e: $ a � a 0 r $ Special � Instructions: Reprint Permit (per PE): ❑ Yes ►: .No ! Done_ Applicant Notified: Date: ; , — , /rt Initials: 1r R EPr-C, w 1-�v -� ! 9 b .e-I Nc A-SCt vev @ r,�. , ., Icy w / I \Building\ Forms \ TransmittalLetter- ReNosions.doc 05/25/2012 . t Building Division Development Code Provision Review TIGARD Commercial Projects with Approved Land Use Building Permit No.: . 2 8! ?— 60/ 5 Land Use Casefile No.: ( poig - noco 8' Routed Plans: Submittal Date: it //3 /� ,3 // 9.-. I a� wo cf.)-19 �/' Submittal Date: i Submittal Date: To the Applicant: Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies to the Building Division. Only checked (✓) items are approved. Items not approved and those listed in the notes must be revised prior to re- submittal. For questions please contact the appropriate staff person(s) listed above each section. STAFF: please only mark those items on the left side that are approved. Planning Review (contact i ..� • . . . • ' at 503 - 718 - 2 -`434 or ) @tigard- or.gov) Land Use Approval )2- Building Plans Match Approved Plan: Yes - - No ❑ ,I" Maximum Building Height ❑ Conditions Met El - Street Trees ,l Protected Trees / ¢� Notes: f b+4 �SP.� c�6QS i l ti c�.CGIQ- 11, O ���h�7`ii q 1 ( L % Z) Ali S rru Q' -N /S ©k , Original Plan: Approved ❑ Not Approved 8" Date: 11 / Z Revision 1: Approved.& Not Approved ❑ Date: it ' 2 7 — / Z_ Revision 2: Approved ❑ Not Approved ❑ Date: (Review Continues on Page 2) Page 1 of 2 Engineering Review (contact Mike White at 503 - 718 -2464 or MikeW @tigard - or.gov) /Actual Slope: 5 ,PFI Permit # -Er Conditions Met Notes: Original Plan: Approved. Not Approved ❑ Date: // a /2 Revision 1: Approved Not Approved ❑ Date: NEU I ti- Revision 2: Approved ❑ Not Approved ❑ Date: Permit Coordinator Review (contact Albert Shields at 503- 718 -2426 or albeit @ tigard - or.gov) ❑ Planning Okay to Issue Permit ❑ Arborist Okay to Issue Permit ❑ Engineering to Iss Per /� C Notes: .e s���Q' L�O�/j- /. v N-u. �/1 i Original Plan: Date Sent to Applicant: Revision 1: Date Sent to Applicant Revision 2: Date Sent to Applica t Okay to Issue Permit: Ye No x / 21 / " 1/— Date Routed to Building: —.Arme!' Page 2 of 2 lig _ Building Division Development Code Provision Review TI G A R D Commercial Projects with Approved Land Use Building Permit No.: 06 u �°d / 2 — 00 J. Land Use Casefile No.: 1M. p& 2 /v? -QO 0D cP Routed Plans: Submittal Date: l/ c ,2/ X02 " 2E7/'S /oA/ Submittal Date: // Z - / Z / /A/G ( //L2/ / OA./ty ' Submittal Date: To the Applicant: Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies to the Building Division. Only checked (✓) items are approved. Items not approved and those listed in the notes must be revised prior to re- submittal. For questions please contact the appropriate staff person(s) listed above each section. STAFF: please only mark those items on the left side that are approved. Planning Review (contact at 503 -718- or @tigard- or.gov) ,12--Land Use Approval la Plans Match Approved Plan: Yes AT No ❑ H" Maximum Building Height ,l Conditions Met 4,0 Street Trees r i f ❑ Protected Trees Notes: /V o 1'/it" 4 I1 IS 1,,,, ! Lt {') � � Original Plan: Approved ❑ Not Approved. ❑ Date: A 1' @ • I L Revision 1: Approved, ® Not Approved ❑ Date: i I - 2- / L Revision 2: Approved ❑ Not Approved ❑ Date: i (Review Continues on Page 2) Page 1 of 2 Engineering Review (contact Mike White at 503 - 718 -2464 or MikeW @tigard - or.gov) ❑ Actual Slope: ErPFI Permit # AEr Conditions Met Notes: Original Plan: Approved. Not Approved ❑ Date: ///2 6 1 L Revision 1: Approved Not Approved ❑ Date: ( 1 J 27/ ' ft. Revision 2: Approved ❑ Not Approved ❑ Date: Permit Coordinator Review (contact Albert Shields at 503 - 718 -2426 or albert @ tigard - or.gov) ❑ Planning Okay to Issue Permit ❑ Arborist Okay to Issue Permit ❑ Engineering Okay to Issue Permit Notes: Original Plan: Date Sent to Applicant: Revision 1: Date Sent to Applicant Revision 2: Date Sent to Applic. t Okay to Issue Permit: Yes ill No 0" i r % Date Routed to Building: t h., 71; Page 2 of 2 This form is recognized by most Building Departments in the Tri- County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. BUILDING SERVICES DIVISION TRANSMITTAL LETTER TO: Dan Nelson DATE RECEIVEED: DEPT: BUILDING SERVICES DIVISION RECEIVED NOV 21 212 FROM: Eric Kauffman CITYOFTIGARD COMPANY: Ware Malcomb BUILDING DIVISION PHONE: (925) 244 -9620 RE: 10031 SW Cascade Blvd. eUA20/0 —00/. ( (Site Address) (Permit/Case Number) Dig Cl2ZS S k_/ /31 (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: 2 Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and /or lateral analysis. Floor /roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other (explain): REMARKS: Structural and Civil submitted separately FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑ No Fee Description: Amount Due: Special Instructions: Reprint Permit (per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: Rev 4/07 'RECEIVED WARE MALCOMB NOV 91 ?012 Leading Design for Commercial Real Estate architecture BUILDING DIVI3 ON planning interiors graphics site development .Delta 3 & 4 Narrative Date: November 21st, 2012 Project Name: Orchard Tigard To: Project No.: SNR12- 0011 -00 From: Bryan Walker Narrative Delta 3 & 4 Narrative Copies To: File Title: Delta #3 & #4 Client and Office & Entrance Changes PLAN REVISIONS: The following changes have been made to the above referenced project and a Delta #3 10 -26 -12 "Client Revisions" and a Delta #4 11 -21 -12 "Office & Entrance Revisions" and clouds have been added to the plan to indicate where the changes have taken place. Delta Sheet: Revision to plan: 3 A0.1 Added equipment plan. 3 A1.1 Revised sizes of automatic doors at main entrances. 4 A0.1 Revised sheets A0.3a, A6.6, and A8.4. 4 AD.1 Revised toilet partition specification on plan specific note #5. 4 A0.2 Demolished existing restroom, updated existing dimension at front entrance. 4 A1.1 Revised outdoor nursery area and adjacent parking spaces, which added 1 parking space. 4 A2.0 Revised fixture plan an exiting layout. 4 A2.1 Relocated office and restrooms, updated front entrance, updated nursery layout with new fencing and gate location and shifted main entrance to building. 4 A2.2 Added ceiling in relocated office and restroom area, revised lighting in main sales and nursery area. 4 A3.1 Revised roof above nursery area. 4 A4.1 Revised nursery elevation. 4 A5.1 Revised section of roof above nursery area and added handrail to enlarged floor plan and exterior elevation. 4 A6.2 Revised roof and column locations for canopy. 4 A6.4 Revised section of nursery canopy. waremalcomb.com 4 A6.5 Revised interior elevations to match new fixture layout. 5000 executive parkway 4 A6.6 Added sheet for new restrooms. suite 298 4 A7.1 Updated door schedule. • san ramon. california 4 A8.4 Added sheet for new office area. 94583 p 925.244.9620 f 925.244.9621 M: Uubs12 \Oppidan \SNR12 -01111 -01 Orchard Tigard \Admin \Bulletin\ Bulletin 03 and 04 \ ARCH \ Delta-3 & 4 Narrative.doc Page 1 • 17701 Cowan 1 FOSTER DESIGN GROUP Suite #230 Irvine Ca 92614 �^ J CONSULTING ENGINEERS INC. Ph9492539630 Fax 949 253 9628 11 -20 -12 RECEIVED Luis Ibanez NOV 2 1 2712 Ware Malcomb Architects CITY OFTIGARD 10 Edelman BUILDING DIVISION Irvine, CA Reference: OSH - Tigard FDG Job#12-052 Dear Mr. Ibanez, This letter is a brief description of revisions made to the MEP drawings as Delta 3 & 4. Mechanical Sheet # Response MO.1 Added EF -2 for revised restroom layout. Revised ventilation calc for revised floor plan. Added EF -2 wiring diagram. M2.1 Revised demo plan for revised floor plan. M2.2 Revised floor plan for new office layout, etc. M3.2 Revised roof plan to match new office layout. Plumbing Sheet# Response P0.1 • Added electric water heater schedule. • Revised plumbing fixture schedule to include fixtures for new restroom. P1.0 • Revised location and invert elevation of storm drain coming out of building. P2.1 • Noted that existing restroom and plumbing fixtures shall be removed. P2.2 • Revised locations of AD - in nursery. • Provided POC to existing water and waste utilities for new restrooms, along with associated notes. P3.1 • Detail #1, provided plumbing for new restrooms and break room sink • Added details #2 and 3. PAGE 1 FDG C O N S U L T I N G E N G I N E E R S I N C . Electrical Sheet# Response E0.3 Fixture types BE & 3 added to fixture schedule. Type B modified to 2 lamp fixture. E0.4 Modified energy compliance report. E2.1 Revised lighting: Storefront, Nursery and Office areas. E3.1 Revised power for Office areas. E4.1 Revised circuits in Panels B, D and L. Sincerely, FDG Consulting Engineers s PAGE 2 FOR OFFICE USE ONLY — SITE ADDRESS: This form is recognized by most building departments in the Tri -County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT T Letter T I G A it D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard- or.gov TO: 2 e ,sJ Tt 5c,/ DATE RECEIVED: DEPT: BUILDING DIVISION �1 �1 ETVED FROM: 1 yn/o 2 NOV 26 1 , ao /02-- COMPANY: CITY OFTIGARD BUILDING DIVISI?k PHONE: RE: / ^ e,oi --Sd (Site Address) (Permit Number) a2 e /9 ` (Project name or subdivision name and lot numb r) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor /roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other (explain): /°Ln7 77A/6 -- ( 7/2/1 -% 64---77 Al / /9 REMARKS: FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑ No Fee Description: Amount Due: Special Instructions: Reprint Permit (per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: 1:\Building\ Forms \TransmittalLetter - Revisions.doc 05/25/2012 RECEIVED . . . NOV 26 2012 CITY OFTIGARD TRANSMITTAL �■ ISc ardne Shaping the Future To: Albert Shields Date: 11/26/2012 City of Tigard Project: Orchard Supply 5415 SW Westgate Drive Suite 100 13125 SW Hall Blvd Project* 21299730 Portland, Oregon 97221 USA Tigard, Oregon 97223 Case /File #: '3VP2i'/2 DPI5L) Phone (503) 419 -2500 Fax #: Total Pages: Fax (503) 419 -2600 From: Pat Gaynor www.cardno.com Transmitting Via: Purpose: „ / ❑ UPS ® As Requested _ l (Y Other: Hand Delivery ❑ Other: t 6" Quantity Description / 07 i 2 L1.0 - Planting Plan - Delta 4 , l � 2 L2.0 - Irrigation Plan - Deta 4 1 11/(P l � `� ' vl 11 i r b Comments: Albert, Included are two copies of the Delta 4 set for the Orchard Supply Hardware project. Please let me know if you have any questions or of I can be of any further assistance. Thank you, Signature: C: Kevin Russell - Cardno WRG - Hardcopy Jeff Shoemaker - Cardno WRG - Hardcopy Australia • Belgium • Indonesia • Kenya • New Zealand • Papua New Guinea United Arab Emirates • United Kingdom • United States • Operations in 60 Countries FOR OFFICE USE ONLY - SITE ADDRESS: This form is recognized by most building departments in the Tri -County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter r I G A j r) 131 all Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard- or.gov TO: K DATE RECEIVED: DEPT: B ILDING DIVISION RECEIVED N'fV272012 FROM: t C— SO CITY OFTIGARD COMPANY: --7 25Y - da;c,c. BUILDING DIVISI PHONE: '5' g 2- 0-a 9) 600 O B Y : RE: (y-.l -a-ccO 4 e0 .c..- ( 090 i -DO i 5Zp (Site Address) (Permit Number) 1 0(D3 ( a-nD ° �AS . Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: - Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor /roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other (explain): - REMARKS: ( ,,...Q.7t.4 et--3 I ru -cXwl m--�•o "` - 0 31.4, ,A,_e_a_s, FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑ No Fee Description: Amount Due: $ $ $ $ Special Instructions: Reprint Permit (per PE): ['Yes ❑ No ❑ Done Applicant Notified: Date: Initials: 1:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012 ®i ® BRAD YOUNG & ASSOCIATES Inc. RECEIVED STRUCTURAL ENGINEERING NOV 277012 CITY OF TIGARD Transmittal BUILDING DIVISION BYA Project #: 12109 Date: 11/20/2012 Number of pages including the transmittal: 1 To: City of Tigard Attn: Dan Nelson Cc: From: Ricardo Leal Subject: Orchard Supply Hardware TI -10031 SW Cascade Blvd. Tigard OR. Revision drawings -Delta 4 Comments: Attached are the 3 sets of stamped & signed structural drawings & calculations as requested by architect. Please feel free to call me if you have any questions. Thank You, Ricardo Leal, PE Project Engineer 5070 N. Sixth Street, Suite 132 Fresno, California 93710 • 559- 222 -9600 • 559- 222 -9633 Fax • www.byaengineering.com Location: Record Type: Inspection Type: Comments: Inspection Date: Record ID: Result: City of Tigard 13125 SW Hal Blvd. Tigard, OR 97223 Tel: 503.718.2439 10031 SW CASCADE AVE, TIGARD, OR, 97223 Commercial - Building 299 Final inspection 05/08/2013 00:00 BUP2012-00150 PASS - C of O Violation Summary: Inspector Contractor Location: Record Type: Inspection Type: Comments: Inspection Date: Record ID: Result: Inspection Report 2633 Camino Ramon Dr San Ramon, CA, 94583 Tel: 999-999-9999 10031 SW CASCADE AVE, TIGARD, OR, 97223 Commercial - Building 275 Framing 01/31/2013 00:00 BUP2012-00150 PART Bathrooms only, no hard lid approval recall for hard lid inspection Violation Summary: Inspector Contractor Location: Record Type: Inspection Type: Comments: Inspection Date: Record ID: Result: Inspection Report 2633 Camino Ramon Dr San Ramon, CA, 94583 Tel: 999-999-9999 10031 SW CASCADE AVE, TIGARD, OR, 97223 Commercial - Building 275 Framing 01/31/2013 00:00 BUP2012-00150 PART Bathrooms only, no hard lid approval recall for hard lid inspection Violation Summary: Inspector Contractor Location: Record Type: Inspection Type: Comments: Inspection Date: Record ID: Result: Inspection Report 2633 Camino Ramon Dr San Ramon, CA, 94583 Tel: 999-999-9999 10031 SW CASCADE AVE, TIGARD, OR, 97223 Commercial - Building 275 Framing 01/31/2013 00:00 BUP2012-00150 PART Bathrooms only, no hard lid approval recall for hard lid inspection Violation Summary: Inspector Contractor