Loading...
Permit CITY OF TIGARD BUILDING PERMIT • COMMUNITY DEVELOPMENT Permit #: BUP2009 -00197 T I GARD 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171 Date Issued: 01/07/2010 Parcel: 151260000300 Jurisdiction: TIGARD Site address: 9677 SW WASHINGTON SQUARE DR CO5 Subdivision: Lot: 0 Project: Aeropostale Project Description: 4131 SqFt Interior TI. Owner: FEES PPR WASHINGTON SQUARE LLC Description Date Amount 2235 FARADAY AVE STE #0 Permit Fee - Additions, Alterations, 01/07/2010 $1,975.71 CARLSBAD, CA 92008 Demolition PHONE: Plan Review 10/28/2009 $1,284.21 Plan Review - Fire Life Safety 10/28/2009 $790.28 12% State Surcharge - Building 01/07/2010 $237.09 Contractor: Metro Const. Excise Tax - Commercial 01/07/2010 $292.80 LAKEVIEW CONSTRUCTION INC Use 10505 CORPORATE DR #200 PLEASANT PRAIRIE, WI 53158 PHONE: 262- 857 -3336 FAX. Specifics: Type of Use: COM Class of Work: ALT Dwelling Units: 0 Stories: 1 Height: 0 ft Bedrooms: 0 Bathrooms: 0 Value: $244,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $4,580.09 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Yes Smoke Detectors: No Manual Pull Stations: Yes Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done ' cordance wi - • • roved plans This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days TENTION Oregon law - • wr=: • , u to follow the rules adopted by the Oregon Utility Notification Center Those rules are s forth in OAR 95 - 001 -0010 through OAR 952 -0 • -0100 Yo y obtain a copy of the rules or direct questions to OUNC by calling 503 24 9 0 1.800 . 344 f sued By: � / ` _ ' =L / Permittee Signature: Call 503.639.4175 by 7:00 a.m. for an Inspection that bus e s day. This permit card shall be kept Ina conspicuous place on the Job site until completion of the project. Approved plans are required on the job site at the time of each Inspection. Building Permit Application Commercial RECEIVE". E.I. FOR OFFICE USE ONLY Received U 9 ? • 00 2OO i City of Tigard Date/B . c Permit No T a 13125 SW HaII Blvd., Tigard, OR 97223 Plan Revie '�. Phone. 503.639.4171 Fax: 503.598.1960 0 C T 2 7 2009 Date/B �% �3 " 11 I Other Permit T 1 G A R D Ins Line: 503.639.4175 Date Ready : la See Page 2 for Internet: www tigard- or.gov CITY OF TIGA u I'' Notified/Method t • d � i MOM Supplemental Information BUILDING DIVISION TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all Addition /alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1- and 2- family dwelling Commercial /industrial Valuation: N/ $ Number of bedrooms: / ❑ Accessory building El Multi-family A ❑ Master builder ❑ Other: Number of bathrooms: }I'A JOB SITE INFORMATION AND LOCATION Total number of floors: rA Job site address: WASgt1kr,ToN��4da v\Au-" T 110 {T S W �'�AS�I vv, SQAIA QE u. New dwelling area: ,I iA 1 square feet City /State /ZIP: S0t- 1 oIZ- ° I1 223 Garage/carport area: 1 I A square feet j.ldg. /apt. no.: -0' LO 5 Project name: Aw=MIZIVM' -RUE' Covered porch area: NIA square feet Cross street/directions to job site: Deck area: N/A square feet Other structure area: IA square feet REQUIRED DATA: COMMERCIAL - USE CHECKLIST Subdivision: Lot no.: Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all Tax map /parcel no.: equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ 244 n0(3 1FRo 6sii Q1 C 1,6�KI yCi STO(g lw �1, R \fA7 ta Nt T-'■T40l,IT OF i E)CI,1uAri DL-M ISEn s?Ace \4A �N FKI\TI 0-3 Existing building area: �1 ` square feet i t(■\1 4Z.5 ) OA -. TO'(? -y MALL, New building area: NIA square feet ❑ PROPERTY OWNER 0 TENANT Number of stories: I Name: 1 , ) ?" \ Paf AT A WT) -E (11A Type of construction: ✓2 Address: • 20\ `A\\z )\yThQsA `�\.,J . � F),,i)e. Occupancy groups: M- kl "I (..t" Cit /State /ZIP: \.,�\I Au, ) a \ 3 07 4-10 E xisting: M - n t" nA �,^ M Phone: ( q13) 82 — 142 Fax: ( ) New: l vl ` !V►r AN I I LE APPLICANT p ❑ CONTACT PERSON NOTICE Business name: \ AM Q)(5 \ G n �AtAik ie kEr t €egvc, ..\\A0,. . All contractors and subcontractors are required to be Contact name: b�A�l licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: i`1 g ` - , ‘ ,,1S,SV_ a� A \ � , t� jurisdiction in which work is being performed. If the City /State /ZIP: ( T- r c.�y l u.� \� 1 qh (521 U applicant i is exempt from licensing, the following reasons Phone: (4 \ 243-343o V)'2, Fax:: (411J NI t — t5b l, E -mail: bl-ItN\NSE Z.tl.Eltv\1Ca121) CONTRACTOR Business name: ' L ` &\&.Q v \ tC.J3 0 a f - vm - VuC.f t Cf 0 BUILDING PERMIT FEES* Address: \ U �J- Cm-pared-0, �Z� (Please refer to fee schedule) City /State /ZIP: ( , A r..,4. pree. ()y-,),_e A. .) \ 3‘5 8 Structural plan review fee (or deposit): Phone: (,94,3)-8.5-7.-20-s:3-&, F, 4 ) @l9D Q 5 3-5-A FLS plan review fee (if applicable): -7 CCB lie.: E!j;;: 4_•.,,.d / 1O Total fees due upon application: I Ao Amount received: Authorized signature: permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: MI a 21MME Date: 10 & .01 * Fee methodology set by Tri -County Building Industry 1 Service Board. I: \Building\Permits\BUP -COM PermitApp doe 2/23/07 440- 4613T(11/02 /COM/WEB) 61, orz7 — C/9 7 Commercial Application Checklist City of Tigard ° 13125 SW Hall Blvd., Tigard, OR 97223 Phone: 503.639.4171, Fax: 503.598.1960 i c h ii u Internet address: www.tigard - or.gov PROJECT INFORMATION Project name: Q J s - Date: I 0/2sloct Address: \IkN\ktAci }1'R -C, AU, ' �1�� Asti ( Aci fh l� Cit y :e pJuI ANA State: Qk ZIP: L1 / 7 .3.uA2E 2D Scope of work:AUZ01,OSTA QExA1ti c. 40c, %TU.F.it OAT I1 frcr -Oifr (IF FxAsfla, )F,Iy∎ 6 0 , WAGE I4 EMS ? I N 3 1E:QED M S M4 w Reference no.: Map and tax -lot no.: Contact person name: YJ Quo, I (\i p_ Company: \k4.1 C mAl';�EMEt\r t S VICES ,I�e Phone: (40) 2�� -3��D Fax: (4(2)3 1 5?) ( Cellular phone: E -mail: bv co\ESL@ LA IA I G Et ,03 0,6 P, NOTES AND INSTRUCTIONS • The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan review will not take place until a complete package is submitted. • This checklist can be used for all commercial construction projects, including new construction, additions, alterations and tenant improvements. • For complex projects, applicants should use the "location" space to note the item's location and page number from the plans or the specification book. • It is not necessary to duplicate submittal information, even if it is asked for in multiple sections. • In the checklist, "Required" means that the applicant must provide this information for plan review. • In the checklist, "P" means — • if checked by the applicant — the information is provided for the plan review. • if checked by the plans reviewer — this information is required for the plan review. • In the checklist, "NA" means that the information does not apply. • Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project Data," must be included with each project submitted. PRE - SUBMITTAL PROCESS An applicant may request a pre - submittal meeting with representatives of the jurisdiction in which the project will be built. The meeting may take place during the conceptual, schematic, or in- progress phase, or when the . applicant has completed plans. INDEX OF CHECKLIST SECTIONS 1.0 General project data Page 2 7.0 Mechanical data (Types I and II 2.0 Civil data Page 2 kitchen -hood permits) Page 6 3.0 Architectural data Page 3 8.0 Plumbing data Page 7 4.0 Structural data Page 4 9.0 Electrical data Page 8 5.0 Mechanical data (new construction, tenant 10.0 Fire - suppression data Page 9 improvement, gas - piping permits) Page 5 11.0 Fire - detection and fire -alarm data Page 9 6.0 Mechanical data (additional or replacement 12.0 Re -roof installation data Page 10 rooftop- equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10 This checklist is for building department jurisdictions in Clackamas, Multnomah, and Washington counties. 440 -2734 (8 /01/WEB /COM) I:\ Building \Forms \COM- Checklist.doc 10/23/09 SECTION 1.0' — GENERAL l'ROII'C"I;. DATA Construction documents Location (sheet number or spec section) 1.1 ® Required No. of sets of plans: New: 1 TI: a 1.2 ® Required Cover sheet title block GS 1.3 ® Required Cover sheet vicinity map C5 1.4 ® Required Cover sheet plan index 05 1.5 ■■ P ❑ NA Code summary CS + 1.6 P ID NA Deferred submittal summary o � SAS sehi 1.7 ® P ❑ NA Professional stamp and signature 1p ak. a Iak (k 1.8 ❑ P Z NA Fire and life- safety plan 1.9 ❑ P ® NA Landscape plan 1.10 ❑ P [I NA Landscape specifications Supporting documents Notes 1.20 ❑ P ® NA Land -use or planning actions 1.21 ❑ P ® NA Required fire -flow calculations 1.22 ❑ P ig NA Fire - hydrant flow -test report 1.23 ❑ P i2 NA Fire department or fire district building survey report 1.24 ❑ P ® NA Material safety data sheets (MSDS) SEC llON- 2.0 -- _CI=V_1L- - - DATA__ __ Construction documents Location (sheet number or spec section) 2.1 ® Required Site plan 2.2 ® Required Site utility plan 2.3 ® Required Grading plan 2.4 ® Required Erosion - control plan 2.5 ❑ P ® NA Utility -vault location and details Supporting documents Notes 2.20 ❑ P ►:1 NA Geotechnical/soil engineer report 2.21 ❑ P ® NA Storm -water calculations 2.22 ❑ P ® NA Site retaining -wall structural calculations 2.23 ❑ P ® NA "Assurance of Compliance" with environmental rules 440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 2 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I \Building \Forms \COM- Checklist.doc SECTION 3.0 — A RC I-I I TECTU RA L DATA ti +< Construction documents Location (sheet number or spec section) 3.1 ® Required Floor plan(s) Al 3.2 ® Required Transverse and longitudinal cross sections 3.3 ® Required OSSC Chapter 11 accessibility requirements 3.4 Nj P ❑ NA Interior elevations A7 3.5 ® P ❑ NA Exterior elevations AS . I 3.6 ❑ P IN NA Roof plans 3.7 ® P ❑ NA Exterior wall sections and details ALA 3.8 4 P ❑ NA Reflected ceiling plan(s) , 118_ 3.9 gJ P ❑ NA Fire -rated construction details , 3.10 ❑ P ® NA Energy code compliant construction details and specifications 3.11 P ❑ NA Door schedule 151 3.12 Zi P ❑ NA Glazing schedule IS 1 3.13 P ❑ NA Furniture plan A a Supporting documents Notes 3.20 ❑ P NA Energy code compliance forms /calculations 3.21 ❑ P ® NA Material safety data sheets (MSDS) 3.22 ❑ P NA Hazardous materials inventory statement (HMIS) 3.23 El P l NA Hazardous materials management plan (HMMP) 3.24 El P IN NA Written fire and life- safety evacuation plan for area of rescue assistance 3.25 El P Egi NA Active and passive smoke - control information 440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 3 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i. \Bu i Iding \Forms \COM- Checkl ist.doc SECTION 4.0 — STRUCTURAL. DATA Construction documents Location (sheet number or spec section) 4.1 ® Required Structural cover sheet 4.2 ❑ P ❑ NA Foundation plan : Strvc4u 4.3 ❑ P ❑ NA Under -slab mechanical plan GLeekS to be 4.4 ❑ P ❑ NA Under -slab electrical plan Sobmi vt 4.5 ❑ P ❑ NA Under -slab plumbing plan a kit ak- 4.6 ❑ P ❑ NA Floor framing plan 4.7 ❑ P ❑ NA Roof framing plan 4.8 ❑ P ❑ NA Structural elevations 4.9 ❑ P ❑ NA Structural details and cross sections 4.10 ❑ P ❑ NA Standpipe information 4.11 ❑ P ❑ NA Special inspector /structural observation matrix Supporting documents Notes 4.20 ❑ P ❑ NA Geotechnical /soil engineer report 4.21 ❑ P ❑ NA Site - specific seismic hazard report 4.22 ❑ P ❑ NA Design narrative 4.23 ❑ P ❑ NA Structural calculations 440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 4 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1:\Bui lding \Forms \COM- Checkl ist.doc SECTION 5.0:— MECHANICAL DATA (New construction, tenant improvement, gas pi permits) Construction documents Location (sheet number or spec section) 5.1 ® Required Floor plan M1 5.2 ® Required Equipment schedule M1 5.3 Z P ❑ NA Site plan M1 5.4 ❑ P ® NA Under -slab mechanical plan 5.5 ❑ P ® NA Roof plan 5.6 ❑ P ® NA Fuel gas piping plan 5.7 ® P ❑ NA HVAC equipment and duct plan(s) M1 5.8 ❑ P ® NA Roof access details 5.9 ❑ P ® NA Duct smoke detector plans 5.10 ❑ P ® NA Fire /smoke damper locations 5.11 ❑ P ® NA Smoke control plan 5.12 ❑ P ® NA Outside air (OSA) table 5.13 ❑ P ® NA Refrigeration equipment and piping plan 5.14 ❑ P ® NA Kitchen equipment plan 5.15 ❑ P ® NA Type I and/or Type II kitchen hood plan (see Section 7.0 — Mechanical Data) 5.16 ❑ P ® NA Fume /vapor hood plan 5.17 ❑ P ® NA Process piping/product and/or exhaust - conveying duct plan 5.18 ❑ P ® NA Fire -rated construction details 5.19 ❑ P ® NA Equipment hanger /fastener details Supporting documents Notes 5.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 5.21 ❑ P ® NA Equipment manufacturers' catalog "cut sheets" or specifications 5.22 ❑ P ® NA Outside air (OSA) calculations 5.23 ❑ P ® NA Smoke - control calculations 5.24 ❑ P ® NA Combustion air calculations 5.25 ❑ P ® NA Fuel gas piping sizing calculations 5.26 ❑ P ® NA Make -up air calculations 5.27 ® P ❑ NA Energy code compliance forms 5.28 ❑ P ® NA Boiler information 440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 5 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building\Forms\COM-Checklist.cloc • SECTION 6.0 — MECHANICAL DATA (Additional or replacement rooftop installation: permits) Construction documents Location (sheet number or spec section) 6.1 ❑ Required Roof plan 6.2 ❑ P ® NA Roof framing plan 6.3 ❑ P ® NA Fuel gas piping plan 6.4 ❑ P ® NA Roof access details Supporting documents Notes 6.20 ❑ Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 6.21 ❑ P ® NA Equipment manufacturers' catalog "cut sheets" or specifications 6.22 ❑ P ® NA Fuel gas piping sizing calculations 6.23 ❑ P ® NA Energy code compliance forms SECTION 7.0 MECHANICAL DATA (Type I and Type II kitchen hood permits) Construction documents Location (sheet number or spec section) 7.1 ❑ Required Site plan 7.2 ❑ Required Floor plan(s) 7.3 ❑ Required Kitchen equipment plan 7.4 ❑ Required Kitchen equipment and hood elevations 7.5 ❑ P ® NA Roof plan 7.6 ❑ P ® NA Cross sections through hoods, ducts and shafts 7.7 ❑ P ® NA Fire -rated construction details 7.8 El P ® NA Fire suppression details Supporting documents Notes 7.20 ❑ Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 7.21 ❑ Required Make -up air calculations 7.22 ❑ P ® NA Equipment manufacturers' catalog "cut sheets" or specifications 7.23 ❑ P ® NA Hood/grease extractor listing documentation 7.24 ❑ P ® NA Hood/grease duct sizing calculations 7.25 ❑ P ® NA Fire suppression information 440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 6 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I: \Building \Forms \COM- Checkl ist.doc SECTION 80 = 1 3 LUIti1BING DATA Construction documents Location (sheet number or spec section) 8.1 ® Required Floor plan(s) M1 8.2 ❑ Required Piping and material schedule 8.3 ® Required Equipment layout plan M1 8.4 ® Required Fixture schedule M1 8.5 ❑ P ® NA Site utility plan 8.6 ❑ P ® NA Building cross section 8.7 ❑ P ® NA Rise diagram 8.8 ❑ P ® NA Roof plan 8.9 ❑ P ® NA Back flow prevention location 8.10 ❑ P ® NA Irrigation plan 8.11 ❑ P ® NA Fire -rated construction details 8.12 ❑ P ® NA Under -slab plumbing plan Supporting documents Notes 8.20 ❑ Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 8.21 ❑ P ® NA Equipment manufacturers' catalog "cut sheets" or specifications 8.22 ❑ P ® NA Utility maintenance agreements 8.23 ❑ P ® NA Water supply calculations 8.24 ❑ P ® NA Sanitary system calculations 8.25 ❑ P ® NA Irrigation demand calculations 8.26 ❑ P ® NA Roof drain and storm water calculations 440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 7 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties c\Building\Forms \COM- Checklist doc • SECTION 9:0- ELECTRICAL DATA Construction documents Location (sheet number or spec section) 9.1 ® Required No. of sets of plans: 2 9.2 ® Required Floor plan(s) E2 9.3 ® Required Electrical load calculations EO 9.4 ® Required One line diagram E3 9.5 ® Required Feeder riser diagram E3 9.6 ® Required Available fault current information Existing Equipment 9.7 ® Required Panel schedule(s) EO 9.8 ❑ P ® NA Site electrical plan 9.9 ❑ P ® NA Fire -rated construction details 9.10 ® P ❑ NA Lighting plan E1 9.11 ® P ❑ NA Emergency power system and emergency lighting plan E1 9.12 ® P ❑ NA Under -slab electrical plan E2 Supporting documents Notes 9.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 9.21 ® P ❑ NA Energy code compliance forms and calculations for lighting Separate Forms 9.22 ❑ P ® NA Emergency power system specifications 9.23 ® P ❑ NA Feeder riser information E3 9.24 ® P ❑ NA Lighting equipment manufacturers' catalog "cut sheets" or specifications E1 • 440 - 2734 (8 /0I/WEB /COM) Tri -County Commercial Application Checklist 8 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I.\Buildmg\Forrns \COM- Checklist doc SECTION 111.0 - F11RF SUPPRESSION DATA Construction documents Location (sheet number or spec section) 10.1 ® Required Floor plan(s) 10.2 ® Required Sprinkler piping plan(s) 10.3 ❑ P ❑ NA Site plan 10.4 ❑ P ❑ NA Standpipe information 10.5 ❑ P El NA Back flow prevention information 10.6 ❑ P ❑ NA Reflected ceiling plan(s) 10.7 ❑ P ❑ NA Transverse and longitudinal cross sections 10.8 ❑ P ❑ NA Fire -rated construction details 10.9 ❑ P ❑ NA Specialty fire suppression system plans and list of systems Supporting documents Notes 10.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 10.21 ® Required Equipment manufacturers' catalog "cut sheets" 10.22 El P ❑ NA Hydraulic calculations 10.23 ❑ P ❑ NA Specialty fire suppression system information SECTION 11.0 - FIRE DETECTION AND ALARM= DATA Construction documents Location (sheet number or spec section) 11.1 Required Floor plan(s) 11.2 ❑ P ❑ NA Site plan 11.3 El P ❑ NA Reflected ceiling plan(s) 11.4 ❑ P • ❑ NA Transverse and longitudinal cross sections 11.5 ❑ P ❑ NA Wiring schematic 11.6 ❑ P ❑ NA Elevator recall information 11.7 ❑ P ❑ NA Operational matrix 11.8 ❑ P ❑ NA Fire -rated construction details 11.9 ❑ P ❑ NA Standard electrical notes Supporting documents Notes 11.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 11.21 ® Required Equipment manufacturers' catalog "cut sheets" 11.22 ® Required Installer certification information 11.23 El P ❑ NA Battery calculations 11.24 ❑ P ❑ NA Sample fire alarm log book 11.25 ❑ P ❑ NA Emergency power system specifications 11.26 ❑ P ❑ NA Monitoring station information 11.27 ❑ P ❑ NA Voltage drop calculations 440 - 2734 (8/01 /WEB /COM) Tri -County Commercial Application Checklist 9 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i •\ Buildmg\ \COM- Checklist.doc v SECTION 12.0 RE -ROOF INSTALLATION DATA r Construction documents Location (sheet number or spec section) 12.1 ® Required Site plan or building location map 12.2 ® Required Occupancy classification 12.3 ® Required Type of construction 12.4 ® Required Minimum roof class required 12.5 ® Required Class of roofing to be installed 12.6 ® Required Roof plan 12.7 ❑ P ❑ NA Parapet and scupper cross section(s) Supporting documents Notes 12.20 ® Required Pre -re -roof inspection report 12.21 ® Required Roofing system listing information 12.22 ® Required Roofing manufacturer's catalog "cut sheets" 12.23 ❑ P ❑ NA Structural calculations 12.25 ❑ P ❑ NA Structural engineer's report SECTION 13.0 — JURISDICTIONAL - SPECIFIC 'REQUIREMENTS `!. Construction documents Item Location (sheet number or spec section) 13.1 ❑ P ❑ NA ❑ Required 13.2 ❑ P ❑ NA ❑ Required 13.3 ❑ P ❑ NA ❑ Required 13.4 ❑ P ❑ NA ❑ Required 13.5 ❑ P ❑ NA ❑ Required 13.6 ❑ P ❑ NA ❑ Required 13.7 ❑ P ❑ NA ❑ Required 13.8 ❑ P ❑ NA ❑ Required 13.9 ❑ P ❑ NA ❑ Required 13.10 ❑ P ❑ NA ❑ Required 440 -2734 (8/01 /WEB /COM) Tri- County Commercial Application Checklist 10 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1 \ Building \Fortes \COM- Checklist.doc .,„6_,/,1-e 7 - oz) i 9 7 Transmiticfl Larne Grubb DaLe: December 14, 2009 nos t ,;,,,s , LGA db #: 09260 ,�, .;` : =a�.�= ��;ti;:e'� ifk 100 .tS1 'wWI; ak e Re: Aeropostale # 1083 Washington Square Mall t=;rtc4,Ls -0, Portland, Oregon r ?.24,12-1) "T;): City of Tigard Attn: Permit Center 13125 SW Hall Blvd. Tigard, OR 97223 (503) 639 -4171 RECEIVED � ED Endo,ied: Revised Documents DEC 16 2009 CITY OF TIGARD Foe; Your Re- review for Building Permit BUILDING DIVISION ✓� UPS: Next Day 10:30AM Noon _X_ 3:00 PM 2nd Day US Mail: Hand Deliver: Other: 1 2 Sets of revised Drawings 12/11/09 2 3 Response letters (included Structural Books) 12/07/09 3 3 Sets of revised Structural Calculation Books 12/07/09 Enclosed are two sets of revised plans for your re- review for the Aeropostale store in space # CO5 at Washington Square Mall in order to obtain a Building Permit. At this time, the project has not been awarded to a General Contractor. As soon as the selection is made, the contractor will contact your office. Please let us know if you have any questions or comments. Thank you, Signed: Brian Zimmer /LC ,c: File - _� Y %^ la 7 I. . ✓ r a .,v .1 • Trans ittd Grubb RE CEIVED Date: November 11, 2009 NOV 12 2009 t.ami flnbb CITY OF IGA Job #: 09260 BUILDING DIVIs7X , nay =il,t���,f ON 100 b „tsr Switis1 ale Av Re: Aeropostale #1083 Washington Square Mall Pittsburgh, PA 15218 Portland, Oregon Ph<<t„.: 412.243.1430 Pax: 412.371. •. Sti To: City of Tigard Attn: Permit Center 13125 SW Hall Blvd. Tigard, OR 97223 (503) 639 -4171 Enclosed: Structural Documents For: Your Review in addition to our Building Permit submittal Via: UPS: Next Day 10 :30AM Noon _X_ 3:00 PM 2nd Day US Mail: Hand Deliver: Other: 1 2 Sets of Structural Drawings 11/11/09 2 2 Sets of Structural Calculation Booklets 11/11/09 Remarks: Enclosed are two sets of Structural drawings for your review for the Aeropostale store in space #CO5 at Washington Square Mall. This is an addendum to our Building Permit submittal that was sent on 10/26/09. Per Dan Nelson, this was acceptable to be submitted separately. Please let us know if you have any questions or comments. Thank you, Signed: Brian Zimmer /LC CC: File v A3 °0 —a-0/ Tra, smitgaa Lami Grubb Date: October 26, 2009 C.amr (iruhb 4iana�gctrantSelvi( <, ins. LGA Job #: 09260 100 E.a i s� e,eaEr p c Re: Aeropostale # 1083 Washington Square Mall t°iaNb„ryvn, r}, 152: Portland, Oregon r X )2.:.-73 „y4;;, To: City of Tigard ;`: 412.371.1551,h Attn: Permit Center 13125 SW Hall Blvd. Tigard, OR 97223 (503) 639 -4171 Enclosed: Documents For: Your Review for Building Permit Via: UPS: Next Day 10:30AM Noon _X_ 3:00 PM 2nd Day US Mail: Hand Deliver: Other: 0 � n-erng Quc4fthVy pa; :t 1 2 Sets of Drawings 10/21/09 2 1 Building Permit Application 10/26/09 3 1 Plan Review Fee Check made 10/21/09 out to The City of Tigard in the amount of $1,073.26 Remarks: Enclosed are two sets of plans for your review for the Aeropostale store in space # CO5 at Washington Square Mall in order to obtain a Building Permit. At this time, the project has not been awarded to a General Contractor. As soon as the selection is made, the contractor will contact your office. Please let us know if you have any questions or comments. Thank you, it Signed: Brian Zimmer /LC CC: File lY . 1 e, m A u S LL 3, b . S ] L'.9 L ..