Permit CITY OF TIGARD BUILDING PERMIT
• COMMUNITY DEVELOPMENT Permit #: BUP2009 -00197
T I GARD 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171 Date Issued: 01/07/2010
Parcel: 151260000300
Jurisdiction: TIGARD
Site address: 9677 SW WASHINGTON SQUARE DR CO5
Subdivision: Lot: 0
Project: Aeropostale
Project Description: 4131 SqFt Interior TI.
Owner: FEES
PPR WASHINGTON SQUARE LLC Description Date Amount
2235 FARADAY AVE STE #0 Permit Fee - Additions, Alterations, 01/07/2010 $1,975.71
CARLSBAD, CA 92008 Demolition
PHONE: Plan Review 10/28/2009 $1,284.21
Plan Review - Fire Life Safety 10/28/2009 $790.28
12% State Surcharge - Building 01/07/2010 $237.09
Contractor: Metro Const. Excise Tax - Commercial 01/07/2010 $292.80
LAKEVIEW CONSTRUCTION INC Use
10505 CORPORATE DR #200
PLEASANT PRAIRIE, WI 53158
PHONE: 262- 857 -3336
FAX.
Specifics:
Type of Use: COM
Class of Work: ALT
Dwelling Units: 0
Stories: 1 Height: 0 ft
Bedrooms: 0 Bathrooms: 0
Value: $244,000
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $4,580.09
Required: Required Items and Reports (Conditions)
Fire Sprinkler: Yes Parapet:
Fire Alarm: Yes Protected Corridors: Yes
Smoke Detectors: No Manual Pull Stations: Yes
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done ' cordance wi - • • roved plans This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days TENTION Oregon law - • wr=: • , u to follow the rules adopted by the Oregon Utility Notification Center Those rules are s forth in OAR
95 - 001 -0010 through OAR 952 -0 • -0100 Yo y obtain a copy of the rules or direct questions to OUNC by calling 503 24 9 0 1.800 . 344
f
sued By: � / ` _ ' =L / Permittee Signature:
Call 503.639.4175 by 7:00 a.m. for an Inspection that bus e s day.
This permit card shall be kept Ina conspicuous place on the Job site until completion of the project.
Approved plans are required on the job site at the time of each Inspection.
Building Permit Application
Commercial RECEIVE". E.I. FOR OFFICE USE ONLY
Received U 9 ? • 00 2OO i
City of Tigard Date/B . c Permit No T
a 13125 SW HaII Blvd., Tigard, OR 97223 Plan Revie '�.
Phone. 503.639.4171 Fax: 503.598.1960 0 C T 2 7 2009 Date/B �% �3 " 11 I Other Permit
T 1 G A R D Ins Line: 503.639.4175 Date Ready : la See Page 2 for
Internet: www tigard- or.gov CITY OF TIGA u I'' Notified/Method t • d � i MOM Supplemental Information
BUILDING DIVISION
TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING
❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed.
Indicate the value (rounded to the nearest dollar) of all
Addition /alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1- and 2- family dwelling Commercial /industrial Valuation: N/ $
Number of bedrooms: /
❑ Accessory building El Multi-family A
❑ Master builder ❑ Other: Number of bathrooms: }I'A
JOB SITE INFORMATION AND LOCATION Total number of floors: rA
Job site address: WASgt1kr,ToN��4da v\Au-" T 110 {T S W �'�AS�I vv, SQAIA QE u. New dwelling area: ,I iA 1 square feet
City /State /ZIP: S0t- 1 oIZ- ° I1 223 Garage/carport area: 1 I A square feet
j.ldg. /apt. no.: -0' LO 5 Project name: Aw=MIZIVM' -RUE' Covered porch area: NIA square feet
Cross street/directions to job site: Deck area: N/A square feet
Other structure area: IA square feet
REQUIRED DATA: COMMERCIAL - USE CHECKLIST
Subdivision: Lot no.: Permit fees* are based on the value of the work performed.
Indicate the value (rounded to the nearest dollar) of all
Tax map /parcel no.: equipment, materials, labor, overhead, and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Valuation: $ 244 n0(3
1FRo 6sii Q1 C 1,6�KI yCi STO(g lw �1, R \fA7 ta Nt
T-'■T40l,IT OF i E)CI,1uAri DL-M ISEn s?Ace \4A �N FKI\TI 0-3 Existing building area: �1 ` square feet
i
t(■\1 4Z.5 ) OA -. TO'(? -y MALL, New building area: NIA square feet
❑ PROPERTY OWNER 0 TENANT Number of stories: I
Name: 1 , ) ?" \ Paf AT A WT) -E (11A Type of construction: ✓2
Address: • 20\ `A\\z )\yThQsA `�\.,J . � F),,i)e. Occupancy groups: M- kl "I (..t"
Cit /State /ZIP: \.,�\I Au, ) a \ 3 07 4-10 E xisting: M -
n t" nA �,^ M
Phone: ( q13) 82 — 142 Fax: ( ) New: l vl ` !V►r AN I I LE
APPLICANT p ❑ CONTACT PERSON NOTICE
Business name: \ AM Q)(5 \ G n �AtAik ie kEr t €egvc, ..\\A0,. . All contractors and subcontractors are required to be
Contact name: b�A�l
licensed with the Oregon Construction Contractors Board
under ORS 701 and may be required to be licensed in the
Address: i`1 g ` - , ‘ ,,1S,SV_ a� A \ � , t� jurisdiction in which work is being performed. If the
City /State /ZIP: ( T- r c.�y l u.� \� 1 qh (521 U
applicant i is exempt from licensing, the following reasons
Phone: (4 \ 243-343o V)'2, Fax:: (411J NI t — t5b l,
E -mail: bl-ItN\NSE Z.tl.Eltv\1Ca121)
CONTRACTOR
Business name: ' L ` &\&.Q v \ tC.J3 0 a f - vm - VuC.f t Cf 0 BUILDING PERMIT FEES*
Address: \ U �J- Cm-pared-0, �Z� (Please refer to fee schedule)
City /State /ZIP: ( , A r..,4. pree. ()y-,),_e A. .) \ 3‘5 8 Structural plan review fee (or deposit):
Phone: (,94,3)-8.5-7.-20-s:3-&, F, 4 ) @l9D Q 5 3-5-A FLS plan review fee (if applicable): -7
CCB lie.: E!j;;: 4_•.,,.d / 1O Total fees due upon application: I Ao Amount received:
Authorized signature: permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: MI a 21MME Date: 10 & .01 * Fee methodology set by Tri -County Building Industry
1 Service Board.
I: \Building\Permits\BUP -COM PermitApp doe 2/23/07 440- 4613T(11/02 /COM/WEB)
61, orz7 — C/9 7
Commercial Application Checklist
City of Tigard
° 13125 SW Hall Blvd., Tigard, OR 97223
Phone: 503.639.4171, Fax: 503.598.1960
i c h ii u Internet address: www.tigard - or.gov
PROJECT INFORMATION
Project name: Q J s - Date: I 0/2sloct
Address: \IkN\ktAci }1'R -C, AU, ' �1�� Asti ( Aci fh l� Cit y :e pJuI ANA State: Qk ZIP: L1 / 7
.3.uA2E 2D
Scope of work:AUZ01,OSTA QExA1ti c. 40c, %TU.F.it OAT I1 frcr -Oifr (IF FxAsfla, )F,Iy∎ 6 0 , WAGE I4 EMS ? I N
3 1E:QED M S M4 w
Reference no.: Map and tax -lot no.:
Contact person name: YJ Quo, I (\i p_ Company: \k4.1 C mAl';�EMEt\r t S VICES ,I�e
Phone: (40) 2�� -3��D Fax: (4(2)3 1 5?) (
Cellular phone: E -mail: bv co\ESL@ LA IA I G Et ,03 0,6 P,
NOTES AND INSTRUCTIONS
• The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan
review will not take place until a complete package is submitted.
• This checklist can be used for all commercial construction projects, including new construction, additions,
alterations and tenant improvements.
• For complex projects, applicants should use the "location" space to note the item's location and page
number from the plans or the specification book.
• It is not necessary to duplicate submittal information, even if it is asked for in multiple sections.
• In the checklist, "Required" means that the applicant must provide this information for plan review.
• In the checklist, "P" means —
• if checked by the applicant — the information is provided for the plan review.
• if checked by the plans reviewer — this information is required for the plan review.
• In the checklist, "NA" means that the information does not apply.
• Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project
Data," must be included with each project submitted.
PRE - SUBMITTAL PROCESS
An applicant may request a pre - submittal meeting with representatives of the jurisdiction in which the project
will be built. The meeting may take place during the conceptual, schematic, or in- progress phase, or when the
. applicant has completed plans.
INDEX OF CHECKLIST SECTIONS
1.0 General project data Page 2 7.0 Mechanical data (Types I and II
2.0 Civil data Page 2 kitchen -hood permits) Page 6
3.0 Architectural data Page 3 8.0 Plumbing data Page 7
4.0 Structural data Page 4 9.0 Electrical data Page 8
5.0 Mechanical data (new construction, tenant 10.0 Fire - suppression data Page 9
improvement, gas - piping permits) Page 5 11.0 Fire - detection and fire -alarm data Page 9
6.0 Mechanical data (additional or replacement 12.0 Re -roof installation data Page 10
rooftop- equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10
This checklist is for building department jurisdictions in Clackamas, Multnomah, and Washington counties.
440 -2734 (8 /01/WEB /COM)
I:\ Building \Forms \COM- Checklist.doc 10/23/09
SECTION 1.0' — GENERAL l'ROII'C"I;. DATA
Construction documents Location (sheet number or spec section)
1.1 ® Required No. of sets of plans: New: 1 TI: a
1.2 ® Required Cover sheet title block GS
1.3 ® Required Cover sheet vicinity map C5
1.4 ® Required Cover sheet plan index 05
1.5 ■■ P ❑ NA Code summary CS +
1.6 P ID NA Deferred submittal summary o � SAS sehi
1.7 ® P ❑ NA Professional stamp and signature 1p ak. a Iak (k
1.8 ❑ P Z NA Fire and life- safety plan
1.9 ❑ P ® NA Landscape plan
1.10 ❑ P [I NA Landscape specifications
Supporting documents Notes
1.20 ❑ P ® NA Land -use or planning actions
1.21 ❑ P ® NA Required fire -flow calculations
1.22 ❑ P ig NA Fire - hydrant flow -test report
1.23 ❑ P i2 NA Fire department or fire district building survey report
1.24 ❑ P ® NA Material safety data sheets (MSDS)
SEC llON- 2.0 -- _CI=V_1L- - - DATA__ __
Construction documents Location (sheet number or spec section)
2.1 ® Required Site plan
2.2 ® Required Site utility plan
2.3 ® Required Grading plan
2.4 ® Required Erosion - control plan
2.5 ❑ P ® NA Utility -vault location and details
Supporting documents Notes
2.20 ❑ P ►:1 NA Geotechnical/soil engineer report
2.21 ❑ P ® NA Storm -water calculations
2.22 ❑ P ® NA Site retaining -wall structural calculations
2.23 ❑ P ® NA "Assurance of Compliance" with environmental rules
440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 2
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
I \Building \Forms \COM- Checklist.doc
SECTION 3.0 — A RC I-I I TECTU RA L DATA ti +<
Construction documents Location (sheet number or spec section)
3.1 ® Required Floor plan(s) Al
3.2 ® Required Transverse and longitudinal cross sections
3.3 ® Required OSSC Chapter 11 accessibility requirements
3.4 Nj P ❑ NA Interior elevations A7
3.5 ® P ❑ NA Exterior elevations AS . I
3.6 ❑ P IN NA Roof plans
3.7 ® P ❑ NA Exterior wall sections and details ALA
3.8 4 P ❑ NA Reflected ceiling plan(s) , 118_
3.9 gJ P ❑ NA Fire -rated construction details ,
3.10 ❑ P ® NA Energy code compliant construction details and
specifications
3.11 P ❑ NA Door schedule 151
3.12 Zi P ❑ NA Glazing schedule IS 1
3.13 P ❑ NA Furniture plan A a
Supporting documents Notes
3.20 ❑ P NA Energy code compliance forms /calculations
3.21 ❑ P ® NA Material safety data sheets (MSDS)
3.22 ❑ P NA Hazardous materials inventory statement (HMIS)
3.23 El P l NA Hazardous materials management plan (HMMP)
3.24 El P IN NA Written fire and life- safety evacuation plan for area
of rescue assistance
3.25 El P Egi NA Active and passive smoke - control information
440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 3
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
i. \Bu i Iding \Forms \COM- Checkl ist.doc
SECTION 4.0 — STRUCTURAL. DATA
Construction documents Location (sheet number or spec section)
4.1 ® Required Structural cover sheet
4.2 ❑ P ❑ NA Foundation plan : Strvc4u
4.3 ❑ P ❑ NA Under -slab mechanical plan GLeekS to be
4.4 ❑ P ❑ NA Under -slab electrical plan Sobmi vt
4.5 ❑ P ❑ NA Under -slab plumbing plan a kit ak-
4.6 ❑ P ❑ NA Floor framing plan
4.7 ❑ P ❑ NA Roof framing plan
4.8 ❑ P ❑ NA Structural elevations
4.9 ❑ P ❑ NA Structural details and cross sections
4.10 ❑ P ❑ NA Standpipe information
4.11 ❑ P ❑ NA Special inspector /structural observation matrix
Supporting documents Notes
4.20 ❑ P ❑ NA Geotechnical /soil engineer report
4.21 ❑ P ❑ NA Site - specific seismic hazard report
4.22 ❑ P ❑ NA Design narrative
4.23 ❑ P ❑ NA Structural calculations
440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 4
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
1:\Bui lding \Forms \COM- Checkl ist.doc
SECTION 5.0:— MECHANICAL DATA (New construction, tenant improvement, gas pi permits)
Construction documents Location (sheet number or spec section)
5.1 ® Required Floor plan M1
5.2 ® Required Equipment schedule M1
5.3 Z P ❑ NA Site plan M1
5.4 ❑ P ® NA Under -slab mechanical plan
5.5 ❑ P ® NA Roof plan
5.6 ❑ P ® NA Fuel gas piping plan
5.7 ® P ❑ NA HVAC equipment and duct plan(s) M1
5.8 ❑ P ® NA Roof access details
5.9 ❑ P ® NA Duct smoke detector plans
5.10 ❑ P ® NA Fire /smoke damper locations
5.11 ❑ P ® NA Smoke control plan
5.12 ❑ P ® NA Outside air (OSA) table
5.13 ❑ P ® NA Refrigeration equipment and piping plan
5.14 ❑ P ® NA Kitchen equipment plan
5.15 ❑ P ® NA Type I and/or Type II kitchen hood plan
(see Section 7.0 — Mechanical Data)
5.16 ❑ P ® NA Fume /vapor hood plan
5.17 ❑ P ® NA Process piping/product and/or exhaust - conveying
duct plan
5.18 ❑ P ® NA Fire -rated construction details
5.19 ❑ P ® NA Equipment hanger /fastener details
Supporting documents Notes
5.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
5.21 ❑ P ® NA Equipment manufacturers' catalog "cut sheets"
or specifications
5.22 ❑ P ® NA Outside air (OSA) calculations
5.23 ❑ P ® NA Smoke - control calculations
5.24 ❑ P ® NA Combustion air calculations
5.25 ❑ P ® NA Fuel gas piping sizing calculations
5.26 ❑ P ® NA Make -up air calculations
5.27 ® P ❑ NA Energy code compliance forms
5.28 ❑ P ® NA Boiler information
440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 5
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
i:\Building\Forms\COM-Checklist.cloc
•
SECTION 6.0 — MECHANICAL DATA (Additional or replacement rooftop installation: permits)
Construction documents Location (sheet number or spec section)
6.1 ❑ Required Roof plan
6.2 ❑ P ® NA Roof framing plan
6.3 ❑ P ® NA Fuel gas piping plan
6.4 ❑ P ® NA Roof access details
Supporting documents Notes
6.20 ❑ Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
6.21 ❑ P ® NA Equipment manufacturers' catalog "cut sheets"
or specifications
6.22 ❑ P ® NA Fuel gas piping sizing calculations
6.23 ❑ P ® NA Energy code compliance forms
SECTION 7.0 MECHANICAL DATA (Type I and Type II kitchen hood permits)
Construction documents Location (sheet number or spec section)
7.1 ❑ Required Site plan
7.2 ❑ Required Floor plan(s)
7.3 ❑ Required Kitchen equipment plan
7.4 ❑ Required Kitchen equipment and hood elevations
7.5 ❑ P ® NA Roof plan
7.6 ❑ P ® NA Cross sections through hoods, ducts and shafts
7.7 ❑ P ® NA Fire -rated construction details
7.8 El P ® NA Fire suppression details
Supporting documents Notes
7.20 ❑ Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
7.21 ❑ Required Make -up air calculations
7.22 ❑ P ® NA Equipment manufacturers' catalog "cut sheets"
or specifications
7.23 ❑ P ® NA Hood/grease extractor listing documentation
7.24 ❑ P ® NA Hood/grease duct sizing calculations
7.25 ❑ P ® NA Fire suppression information
440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 6
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
I: \Building \Forms \COM- Checkl ist.doc
SECTION 80 = 1 3 LUIti1BING DATA
Construction documents Location (sheet number or spec section)
8.1 ® Required Floor plan(s) M1
8.2 ❑ Required Piping and material schedule
8.3 ® Required Equipment layout plan M1
8.4 ® Required Fixture schedule M1
8.5 ❑ P ® NA Site utility plan
8.6 ❑ P ® NA Building cross section
8.7 ❑ P ® NA Rise diagram
8.8 ❑ P ® NA Roof plan
8.9 ❑ P ® NA Back flow prevention location
8.10 ❑ P ® NA Irrigation plan
8.11 ❑ P ® NA Fire -rated construction details
8.12 ❑ P ® NA Under -slab plumbing plan
Supporting documents Notes
8.20 ❑ Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
8.21 ❑ P ® NA Equipment manufacturers' catalog "cut sheets"
or specifications
8.22 ❑ P ® NA Utility maintenance agreements
8.23 ❑ P ® NA Water supply calculations
8.24 ❑ P ® NA Sanitary system calculations
8.25 ❑ P ® NA Irrigation demand calculations
8.26 ❑ P ® NA Roof drain and storm water calculations
440 - 2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 7
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
c\Building\Forms \COM- Checklist doc
•
SECTION 9:0- ELECTRICAL DATA
Construction documents Location (sheet number or spec section)
9.1 ® Required No. of sets of plans: 2
9.2 ® Required Floor plan(s) E2
9.3 ® Required Electrical load calculations EO
9.4 ® Required One line diagram E3
9.5 ® Required Feeder riser diagram E3
9.6 ® Required Available fault current information Existing Equipment
9.7 ® Required Panel schedule(s) EO
9.8 ❑ P ® NA Site electrical plan
9.9 ❑ P ® NA Fire -rated construction details
9.10 ® P ❑ NA Lighting plan E1
9.11 ® P ❑ NA Emergency power system and emergency lighting plan E1
9.12 ® P ❑ NA Under -slab electrical plan E2
Supporting documents Notes
9.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
9.21 ® P ❑ NA Energy code compliance forms and calculations
for lighting Separate Forms
9.22 ❑ P ® NA Emergency power system specifications
9.23 ® P ❑ NA Feeder riser information E3
9.24 ® P ❑ NA Lighting equipment manufacturers' catalog
"cut sheets" or specifications E1
•
440 - 2734 (8 /0I/WEB /COM) Tri -County Commercial Application Checklist 8
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
I.\Buildmg\Forrns \COM- Checklist doc
SECTION 111.0 - F11RF SUPPRESSION DATA
Construction documents Location (sheet number or spec section)
10.1 ® Required Floor plan(s)
10.2 ® Required Sprinkler piping plan(s)
10.3 ❑ P ❑ NA Site plan
10.4 ❑ P ❑ NA Standpipe information
10.5 ❑ P El NA Back flow prevention information
10.6 ❑ P ❑ NA Reflected ceiling plan(s)
10.7 ❑ P ❑ NA Transverse and longitudinal cross sections
10.8 ❑ P ❑ NA Fire -rated construction details
10.9 ❑ P ❑ NA Specialty fire suppression system plans
and list of systems
Supporting documents Notes
10.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
10.21 ® Required Equipment manufacturers' catalog "cut sheets"
10.22 El P ❑ NA Hydraulic calculations
10.23 ❑ P ❑ NA Specialty fire suppression system information
SECTION 11.0 - FIRE DETECTION AND ALARM= DATA
Construction documents Location (sheet number or spec section)
11.1 Required Floor plan(s)
11.2 ❑ P ❑ NA Site plan
11.3 El P ❑ NA Reflected ceiling plan(s)
11.4 ❑ P • ❑ NA Transverse and longitudinal cross sections
11.5 ❑ P ❑ NA Wiring schematic
11.6 ❑ P ❑ NA Elevator recall information
11.7 ❑ P ❑ NA Operational matrix
11.8 ❑ P ❑ NA Fire -rated construction details
11.9 ❑ P ❑ NA Standard electrical notes
Supporting documents Notes
11.20 ® Required Structural calculations for vertical loads and lateral
loads for equipment weighing over 400 pounds
11.21 ® Required Equipment manufacturers' catalog "cut sheets"
11.22 ® Required Installer certification information
11.23 El P ❑ NA Battery calculations
11.24 ❑ P ❑ NA Sample fire alarm log book
11.25 ❑ P ❑ NA Emergency power system specifications
11.26 ❑ P ❑ NA Monitoring station information
11.27 ❑ P ❑ NA Voltage drop calculations
440 - 2734 (8/01 /WEB /COM) Tri -County Commercial Application Checklist 9
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
i •\ Buildmg\ \COM- Checklist.doc
v
SECTION 12.0 RE -ROOF INSTALLATION DATA
r
Construction documents Location (sheet number or spec section)
12.1 ® Required Site plan or building location map
12.2 ® Required Occupancy classification
12.3 ® Required Type of construction
12.4 ® Required Minimum roof class required
12.5 ® Required Class of roofing to be installed
12.6 ® Required Roof plan
12.7 ❑ P ❑ NA Parapet and scupper cross section(s)
Supporting documents Notes
12.20 ® Required Pre -re -roof inspection report
12.21 ® Required Roofing system listing information
12.22 ® Required Roofing manufacturer's catalog "cut sheets"
12.23 ❑ P ❑ NA Structural calculations
12.25 ❑ P ❑ NA Structural engineer's report
SECTION 13.0 — JURISDICTIONAL - SPECIFIC 'REQUIREMENTS `!.
Construction documents Item Location (sheet number or spec section)
13.1 ❑ P ❑ NA ❑ Required
13.2 ❑ P ❑ NA ❑ Required
13.3 ❑ P ❑ NA ❑ Required
13.4 ❑ P ❑ NA ❑ Required
13.5 ❑ P ❑ NA ❑ Required
13.6 ❑ P ❑ NA ❑ Required
13.7 ❑ P ❑ NA ❑ Required
13.8 ❑ P ❑ NA ❑ Required
13.9 ❑ P ❑ NA ❑ Required
13.10 ❑ P ❑ NA ❑ Required
440 -2734 (8/01 /WEB /COM) Tri- County Commercial Application Checklist 10
For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties
1 \ Building \Fortes \COM- Checklist.doc
.,„6_,/,1-e 7 - oz) i 9 7
Transmiticfl Larne Grubb
DaLe: December 14, 2009
nos t ,;,,,s ,
LGA db #: 09260 ,�, .;` : =a�.�= ��;ti;:e'� ifk
100 .tS1 'wWI; ak e
Re: Aeropostale # 1083 Washington Square Mall t=;rtc4,Ls -0,
Portland, Oregon r ?.24,12-1)
"T;): City of Tigard
Attn: Permit Center
13125 SW Hall Blvd.
Tigard, OR 97223
(503) 639 -4171 RECEIVED
� ED
Endo,ied: Revised Documents
DEC 16 2009
CITY OF TIGARD
Foe; Your Re- review for Building Permit BUILDING DIVISION
✓� UPS: Next Day 10:30AM Noon _X_ 3:00 PM 2nd Day
US Mail: Hand Deliver: Other:
1 2 Sets of revised Drawings 12/11/09
2 3 Response letters (included Structural Books) 12/07/09
3 3 Sets of revised Structural Calculation Books 12/07/09
Enclosed are two sets of revised plans for your re- review for the Aeropostale
store in space # CO5 at Washington Square Mall in order to obtain a
Building Permit. At this time, the project has not been awarded to a General
Contractor. As soon as the selection is made, the contractor will contact
your office.
Please let us know if you have any questions or comments.
Thank you,
Signed: Brian Zimmer /LC
,c: File
- _� Y %^ la 7 I. . ✓ r a .,v .1
•
Trans ittd Grubb
RE CEIVED
Date: November 11, 2009 NOV 12 2009
t.ami flnbb
CITY OF IGA Job #: 09260 BUILDING DIVIs7X , nay =il,t���,f
ON 100 b „tsr Switis1 ale Av
Re: Aeropostale #1083 Washington Square Mall Pittsburgh, PA 15218
Portland, Oregon Ph<<t„.: 412.243.1430
Pax: 412.371. •. Sti
To: City of Tigard
Attn: Permit Center
13125 SW Hall Blvd.
Tigard, OR 97223
(503) 639 -4171
Enclosed: Structural Documents
For: Your Review in addition to our Building Permit submittal
Via: UPS: Next Day 10 :30AM Noon _X_ 3:00 PM 2nd Day
US Mail: Hand Deliver: Other:
1 2 Sets of Structural Drawings 11/11/09
2 2 Sets of Structural Calculation Booklets 11/11/09
Remarks:
Enclosed are two sets of Structural drawings for your review for the
Aeropostale store in space #CO5 at Washington Square Mall. This is an
addendum to our Building Permit submittal that was sent on 10/26/09. Per
Dan Nelson, this was acceptable to be submitted separately.
Please let us know if you have any questions or comments.
Thank you,
Signed: Brian Zimmer /LC
CC: File
v
A3 °0 —a-0/
Tra, smitgaa Lami Grubb
Date: October 26, 2009
C.amr (iruhb
4iana�gctrantSelvi( <, ins.
LGA Job #: 09260
100 E.a i s� e,eaEr p c
Re: Aeropostale # 1083 Washington Square Mall t°iaNb„ryvn, r}, 152:
Portland, Oregon r X )2.:.-73 „y4;;,
To: City of Tigard ;`: 412.371.1551,h
Attn: Permit Center
13125 SW Hall Blvd.
Tigard, OR 97223
(503) 639 -4171
Enclosed: Documents
For: Your Review for Building Permit
Via: UPS: Next Day 10:30AM Noon _X_ 3:00 PM 2nd Day
US Mail: Hand Deliver: Other:
0 �
n-erng Quc4fthVy pa; :t
1 2 Sets of Drawings 10/21/09
2 1 Building Permit Application 10/26/09
3 1 Plan Review Fee Check made 10/21/09
out to The City of Tigard in the
amount of $1,073.26
Remarks:
Enclosed are two sets of plans for your review for the Aeropostale store in
space # CO5 at Washington Square Mall in order to obtain a Building
Permit. At this time, the project has not been awarded to a General
Contractor. As soon as the selection is made, the contractor will contact
your office.
Please let us know if you have any questions or comments.
Thank you,
it
Signed: Brian Zimmer /LC
CC: File