Report .
t .
Carla ®n Testing ,Inc. ' -.I Bead Mks
8130 SW 1060 Habra 9 RE 630S5OBR0eyRd6 /1
19gnt OR 97523 &dna OR 97301 Berms OR 97705
Phone: (503) 68I -3160 Pharr: (503)589-1252 Pima (311) 330 -9159
. Construction Materials Testing 6 Inspection F�/503)681-0951 Far 150315894309 F�61113349163
Special Inspection
FINAL SUMMARY LETTER
May 20, 2008
T0806705
City of Tigard
13125 SW Hall Blvd
Tigard OR 97223 -8199
Attn: Building Department
Re: Pottery Barn @ Washington Square Remodel
09619 SW Washington Square Rd — Tigard, OR
Permit# BUP2007 -00610
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Installation of Adhesive Anchors
Structural Welding- Shop & Field
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Co de and Standards, as well as the structural engineers
design changes, approvals and verbal instructions.
Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any rther questions regarding this matter, please do not hesitate to contact this office.
Respectful) bmitted,
CARLSON r STING, INC.
James r, ' ietpas
Project - nag er
JF / s
Fisher Development Inc (Portland) — Jose Ayhllon
KPFF — Brad Moyes
Callison Architecture Inc — Michael Larson
.