Loading...
Correspondence City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 f;3;' r' ,, e-2; 01 I'S November 7, 2006 r y 1 1T It tip' A'R Western Design Group Karen Huset 4612 NE Nfinneheha St Vancouver, WA 98661 RE: VAV/ DUCT WORK Project Information Building Permit MEC2006 -00505 Construction Type: II -B Tenant Name: Forever 21 Occupancy Type: M . Address: 9601 SW Washington Sq Occupant Load: 579 Area: 18,329 sq ft Stories: 2 The plan review was performed under the State of Oregon Mechanical Specialty Code (OMSC) 2004 edition. The submitted plans are approved subject to the following. 1. Equipment and appliances shall be installed as required by the terms of their approval, in accordance with the conditions of the listing, the manufacturer's installation instructions and this code. Manufacturer's installation instructions shall be available on the job site at the time of inspection. OMSC 304.1 2. The building or structure shall not be weakened by the installation of mechanical systems. Where floors, walls, ceilings or any other portion of the building or structure are required to be altered or replaced in the process of installing or repairing any system, the building or structure shall be left in a safe structural condition in accordance with the Building Code. The cutting, notching and boring of framing members shall comply with OMSC 302 Sections 302.3.1 through 302.5.3. 3. Smoke detectors shall be installed in return air systems with a design capacity greater than 2000 cfm. Upon activation, the smoke detector shall shut down the air distribution system. Smoke detectors shall be connected to a fire alarm system and shall activate an audible and visible alarm at a constantly attended location. OR In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. OMSC 606. 4. Ducts shall be supported with approved hangers at intervals not exceeding 10 feet or by other approved duct support systems designed in accordance with the Building Code. Flexible and other factory -made ducts shall be supported in accordance with the manufacturer's installation instructions. OMSC 603.10 Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard or.gov • TTY Relay: 503.684.2772 • 5. Metallic Ducts shall be supported in accordance with Sheet Metal & Air Conditioning Contractors National Association, Inc. (SMACNA) — Metal and Flexible. OMSC 603.4 6. Smoke detectors shall be installed in return air systems with a design capacity greater than 2000 cfm. Upon activation, the smoke detector shall shut down the air distribution system. Smoke detectors shall.be connected to a fire alarm system and shall activate an audible and visible alarm at a constantly attended location. OR In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. OMSC 606. 7. Where vibration isolation of equipment and appliances is employed, an approved means of supplemental restraint shall be used to accomplish the support and restraint OMSC 301.10 8. Equipment and appliances regulated by this code requiring electrical connections shall have a positive means of disconnect in accordance with the Electrical Code. OMSC 301.7 9. Appliances shall be accessible for inspection, service, repair or replacement without removal of permanent construction. OMSC 306.1 10. Condensate from cooling coils or evaporators shall be collected and discharged to an approved plumbing fixture or disposal area. OMSC 307.1 Mercury Thermostats. The State of Oregon prohibits the installation of thermostats that contain mercury in commercial and residential buildings. "In accordance with ORS 455.355, the disposal of thermostats that contain mercury shall be in accordance with programs established by thermostat manufacturers, their representative or distributor, or by delivery to sites that will ensure that the mercury does not become part of the solid waste stream or wastewater." Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectful y, Val Henzel, Senior Plans Examiner