Loading...
Permit CITY -CF TIGARD 24-Hour _- BUILDING Inspection Line: (503) 639 -4175 T L, INSPECTION DIVISION Business Line: (503) 639 -4171 s, d BUP ey`D® 666 //1 Received Date Requested �S AM PM BUP Location 9S Z U ) cSa ki7, Suite _ MEC Contact Person Ph ( ) ��{ � PLM Contractor Ph ( ) SWR BUILDING Tenant/Owner ELC Footing Foundation ELC Access: Ftg Drain ELR Crawl Drain Slab Inspection Notes: SIT Post & Beam Shear Anchors Ext Sheath/Shear Int Sheath/Shear Framing Insulation - Drywall Nailing Fire. - ire Sprinkle ire arm Susp'd Ceiling Roof _ Other: . PART FAIL B ING / ,1 Post & Beam v / Under Slab Rough -In Water Service Sanitary Sewer Rain Drains Catch Basin / Manhole Storm Drain Shower Pan Other: Final PASS PART FAIL MECHANICAL Post & Beam Rough -In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough -In UG/Slab . Low Voltage Fire Alarm Final Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd. PASS PART FAIL SITE Please call for reinspection RE: - ❑ Unable to inspect — no access Fire Supply Line ADA I VC/D Approach/Sidewalk Date Inspector Ext �. Other: �. Anal DO NOT REMOVE this inspection record from the job site. PASS PART FAIL