Inspections CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Line: 6;9 -4171 MST
BUP
Date Requested 97— Z/ AM PM BLD •
Location / (19'410 S L 1G 3 Suite MEC
Contact Person Gee Ph ‘3f9 U eG U PLM ,2e, &P-- U ,7 ((
Contractor Ph SWR
BUILDING Tenant/Owner ELC
Retaining Wall ELR
Footing Access:
Foundation 1 FPS
Ftg Drain v " '� � SGN •
Crawl Drain Inspection • s.
Slab / SIT
Post & Beam 1 ga—//
Ext Sheath /Shear
Int Sheath /Shear
Framing
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling
Roof
Final
PASS PART FAIL
UMB
Post & Beam •
Under Slab
Top Out
Water Service _
ain Drains
F• •
PART FAIL
CHANICAL
Post & Beam
Rough In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill /Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA ��
Approach /Sidewalk Date
I n ectoV Z / Ex
Other p
Final
PASS PART FAIL • • 0 NOT REMOVE this inspection record from the job site.