Loading...
Correspondence June 29, 2005 ,.-__ aa • � CITY OF TIGARD Sephora OREGON Tim Schenk 1120E 80 St. Suite 211 Bloomington, MN 55420 RE: MECHANICAL SYSTEM Project Information Building Permit: MEC2005 -00355 Occupancy Type: M Tenant Name: Sephora Construction Type: 1 -B Address: 9329 SW Washington Sq Rd Occupant Load: 149 Area: 5,397 sq ft Stories: 1 The plan review was performed under the State of Oregon Mechanical Specialty Code (OMSC) 2002 edition. The submitted plans are approved subject to the following. I 1. Smoke detectors shall be installed in return air systems with a design capacity greater than . 2000 cfm. Upon activation, the smoke detector shall shut down the air distribution system. Smoke detectors shall be connected to a fire alarm system and shall activate an audible and visible alarm at a constantly attended location. Smoke detectors required by this section shall be installed in accordance with NFPA 72. The required smoke detectors shall be installed to monitor the entire airflow conveyed by the system including return air and exhaust or relief air. Access shall be provided to smoke detectors for inspection and maintenance. 606. OMSC 2. Permanent equipment supported by the structure, 400 lbs and over, shall have their attachments designed in accordance with the Building Code. 301.16 OMSC 3. Equipment and appliances regulated by this code requiring electrical connections shall have a positive means of disconnect in accordance with the Electrical Code. 301.7 OMSC 4. Appliances serving different areas of a building other than where they are installed shall be permanently marked in an approved manner that uniquely identifies the appliance and the area it serves. 304.10 OMSC , 5. Suspended -type unit heaters shall be supported by non - combustible elements that are designed and constructed to accommodate the weight and dynamic loads. 920.2 OMSC 6. Manufacturer's installation instructions shall be available on the jobsite at the time of 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 1 inspection. 304.1 OMSC 7. Ducts shall be supported with approved hangers at intervals not exceeding 10 feet or by other approved duct support systems designed in accordance with the Building Code. Flexible and other factory-made ducts shall be supported in accordance with the manufacturer's installation instructions. 603.10 OMSC 8. The building or structure shall not be weakened by the installation of mechanical systems. Where floors, walls, ceilings or any other portion of the building or structure are required to be altered or replaced in the process of installing or repairing any system, the building or structure shall be left in a safe structural condition in accordance with the Building Code. OMSC 302. The cutting, notching and boring of framing members shall comply with OMSC sections 302.3.1 through 302.5.3. 9. Appliances shall be accessible for inspection, service, repair or replacement without removal of permanent construction. 306.1 OMSC 10. Manufacturer's installation instructions shall be available on the jobsite at the time of inspection. 304.1 OMSC 11. Condensate from cooling coils or evaporators shall be collected and discharged to an approved plumbing fixture or disposal area. 307.1 OMSC 12. Mercury Thermostats. The State of Oregon prohibits the installation of thermostats that contain mercury in commercial and residential buildings. "In accordance with ORS 455.355, the disposal of thermostats that contain mercury shall be in accordance with programs__ established by thermostat manufacturers, the representative or distributor, or by delivery to sites that will ensure that the mercury does not become part of the solid waste stream or wastewater." Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectful Va Henzel, Senior Plans Examiner