Correspondence A\ September 7, 2005 CITY OF TIGARD OREGON Patriot Fire Protection, Inc. Jeff Colins 4708 NE 1Viinnehaha St Vancouver, WA 98661 RE: FIRE SPRINKLER SYSTEM MODIFICATION — JANEVILLE Project Information Building Permit: BUP2005 -00437 Occupancy Type: M Tenant Name: Janeville Construction Type: II-B Address: 9339 SW Washington Sq Occupant Load: 74 Area: 2,787 Sq Ft Stories: 1 Hazard: Ordinary Group II The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition, Oregon Fire Code 2004 edition; and NFPA 13. The submitted plans are approved subject to the following. HYDROSTATIC TESTING Hydrostatic testing of the system shall occur at sprinkler final. The contractor's material and test certificate required by NFPA 13, 16.1 shall be completed and signed by both the installer and building owner. TESTING: - Section 16.2.1 1. Unless permitted by 16.2.1.2 through 16.2.1.6, all piping and attached appurtenances subjected to system working pressure shall be hydrostatically tested at 200 psi (13.8 bar) and shall maintain that pressure without loss for 2 hours. Loss shall be determined by a drop in gauge pressure or visual leakage. The test pressure shall be read from a gauge located at the low elevation point of the system or portion being tested. n WATERFLOW ALARMS: - Section 6.9.1 2. Water flow alarm apparatus shall be listed for the service and so constructed and installed that any flow of water from a sprinkler system equal to or greater than that from a single automatic sprinkler of the smallest orifice size installed on the system will result in an audible alarm on the premises within 5 minutes after such flow begins and until such flow stops. 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 SPRINKLER SYSTEM MONITORING:. OSSC 901.6. - NFPA 72 3. All valves controlling the water supply for automatic sprinkler systems and water -flow switches on all sprinkler systems shall be electrically monitored where the number of sprinklers are less than 20 HANGERS: 4. The maximum distance between hangers shall not exceed that specified in Table 9 -2.2. 5. The maximum distance between hangers for listed nonmetallic pipe shall be modified as specified in the individual product listings. SWAY BRACING: - Section 9.3.5 - 9.3.5.8 6. The system piping shall be braced to resist both lateral and longitudinal horizontal seismic loads and to prevent vertical motion resulting from seismic loads. The structural components to which bracing is attached shall be determined to be capable of carrying the added applied seismic loads. Sway braces shall be designed to withstand forces in tension and compression. Bracing shall be attached directly to feed and cross mains. SPARE SPRINKLERS: - Section 6.2.9 7. The stock of spare sprinklers shall include all types and ratings installed and shall be as follows: a. For systems having less than 300 sprinlders, not fewer than six sprinklers Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.3.1 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respect ly, al Henzel, Senior Plans Examiner