Loading...
Correspondence kmeV gripgz l r June 23, 2005 CITY OF TIGARD The Cheesecake Factory OREGON Doug Middleton 17701 Mitchell North Irvine, Ca 92614 RE: REVIEW - TENANT ALTERATION Project Information Building Permit: BUP2005 -00198 Construction Type:II B Tenant Name: The Cheesecake Factory Occupancy Type: A -2 Address: 9309 SW Washington Sq Occupant Load: 439 Area: 12455 Sq Ft Stories: 2 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition; and 2003 International Fire Code as amended by TVF &R The submitted plans are approved subject to the following conditions. 1. Provide insignia of compliance information to building inspector on foam core panels used for cooler /freezer and storage areas, showing panels meet the State of Oregon regulation under Oregon Revised Statue 455.705 and Oregon Administrative Rule 918- 674. For more information please contact State of Oregon Building Codes Division at 503.378.4133 and ask for prefabricated structures program. 2. Special Inspection: Special inspection is required for welding, expansion anchors, bolts epoxyed, and spray on fire proofing. The special inspection agency shall • furnish inspection reports to the Engineer of Record James J Lascola, the General Contractor, and the City of Tigard, Building Division, attention Hap Watkins. All discrepancies shall be brought to the immediate attention of the general contractor for correction. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with the approved plans and specifications and the applicable workmanship provisions of the code. 1704 OSSC 3. The main exit shall be provided with signage indicating "THIS DOOR MUST REMAIN UNLOCKED DURING BUSINESS HOURS" Section 1008.1.8 OSSC 4. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. 1011.1 OSSC 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 • Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. 1011.1 OSSC Where not all means of egress are accessible, directional signs shall be provided at nonaccessible exits to indicate the route to the nearest accessible exit or area of rescue assistance, as required in Sections 1108.4.12, 1109.15.2, 1109.15.3 and 1109.15.4. (1107.5 OSSC) 5. All exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. 1008.1.8 OSSC 6. Exit signs shall be illuminated at all times and shall be provided with a second source of power that will provide 1 '/2 hours of illumination in case of primary power loss. 1006.3 OSSC FYI Additional exit signs may be required by the city field inspector to clearly indicate the path of egress. 7. The means of egress shall be provided with illumination of not less than 1 foot candle at the floor level anytime the building is occupied. The means of egress illumination shall be provided with a second source of power in case of primary power loss. 1006.2 OSSC 8. Deferred submittals such as Fire Alarm, Fire Sprinkler, Truss Joist Shop Drawings, etc, will be charged a deferred submittal fee based on the valuation of the portion of the work being deferred. The minimum fee shall be $200.00. 9. NOT PART OF THIS REVIEW: • Fire Sprinklers • Mechanical System • Plumbing • Electrical . 10. Safety glazing including but not limited to: the following locations: Each unit of glazing shall be permanently identified by the manufacturer. 2406 OSSC. Some of these locations are as follows: a. Glazing in ingress and means of egress doors. b. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge is within a 24" arc of the door in a closed position and whose bottom edge is less than 60" above the floor or walking surface except when there is an intervening wall or other permanent barrier between the door and the glazing. c. Glazing that meets all the following conditions: In lieu of safety . glazing, protective bar (1 ' /2" height minimum) may be installed on the accessible side(s) of the glazing 36" ± 2" above the floor. The bar shall be capable of withstanding a horizontal load of 50 plf without contacting the glass. Sec. 308.4 J . 11. American with Disabilities Act (ADA): It shall be the responsibility of the Architect, Engineer, Designer, Contractor, Owner and Lessee to research the applicability of the ADA requirements for the structure. The City of Tigard reviews the plans and inspects the structure only for compliance with Chapter 11 of the OSSC, which may not include all of the requirements of the ADA. STORAGE AREA 12. Storage rooms; Where Table 302.1.1 permits an automatic fire - extinguishing system without a fire barrier, the incidental use area shall be separated by construction capable of resisting the passage of smoke. The partitions shall extend from the floor to the underside of the fire - resistance -rated floor /ceiling assembly or fire- resistance -rated roof/ceiling assembly or to the underside of the floor or roof deck above. Doors shall be self - closing or automatic - closing upon detection of smoke. Doors shall not have air transfer openings and shall not be undercut in excess of the clearance permitted in accordance with NFPA 80. 13. Live Loads Posted: The live loads for which each floor has been designed to exceed 50 psf shall be conspicuously posted by the owner in that part of each story in which they apply, using durable metal signs, and it shall be unlawful to remove or deface such notices. The occupant of the building shall be responsible for keeping the actual load below the allowable limits. 1603.3 OSSC Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.3.1 OSSC Certificate of Occupancy: No building or structure shall be used or occupied until the Building Official has issued a certificate of occupancy 110.1 OSSC Premises Identification: Approved numbers or addresses shall be provided for all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. When submitting revised drawings or additional information, please attach a copy of the enclosed City of , Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Res ec , al He e Senior Plans Examiner /, 4 ARCHITECTS A ' June 7, 2005 D E S I G N CONSORTIUM RESPONSE TO CORRECTION LETTER PREPARED BY VAL HENZEL, 1920 E Katella Ave Suite s PLANS EXAMINER Orange, CA 92867 Tel (714) 997 -9734 Fax (714) 997 -7193 The Cheesecake Factory Restaurant 9309 Washington Square Rd. Tigard, Oregon 97223 Plan Check No. BUP2005 -00198 This letter, along with its attachments, are the response summary to the review comments for the above project. Changes and/or revisions made in response to a review comment have been clouded under "Delta 1". Responses listed below are numbered and correspond to the number indicated for each review comment. . See sheet A2.1: `� Legend is modified to show 2 -hour wall with reference to detail g Y � 10/A2.1. /A2.1 is added showing UL wall type U -411 ( b). Detail 10/ a . Wall Le y k c). Second floor plan is modified to show 2 -hour walls. 2. See sheet A3.1: 7z a-) v . Incorrect Note #3 is erased. b). Ceiling Framing Key Note #4 is the note calling out suspended gypsum board ceiling. 3. See sheets A8.0, A8.3: z a'r Details #16, 17, 21, 22 on sheet A8.0 are omitted. Attachment to structure is shown on structural drawings. . " Details #26, 27, 31 on sheet A8.0 are modified to call out `attachment to structure per structural drawings'. ,/,' . Detail #6 on sheet A8.3 is modified to call out `steel beam per structural drawings'. • 6/7/2005 Page 2 PC Responsel.doc 4. See beet A2.1: a). Grid lines on Second Floor Reflected Ceiling Plan are corrected. 5. See ets TS and A6.1: a). `K' drawings were included last time. I will include them again for your review. . A6.1 is a new sheet added to the set showing section from mall to Factory entrance. yheesecake heets A7.4, S1.1, S7, and S8 are not included in the set and are removed om the sheet index on sheet TS. Please call me at (714) 997 -9734, extension 22, if you have any questions. Sincerely, Dale Bradbury, Project Manager Architects Design Consortium, Inc. f: \0 \0412 \windoc \plan check \plan check - building - response.doc May 24, 2005 if CITY OF TIGARD The Cheesecake Factory OREGON Doug Middleton 17701 Mitchell North Irvine, Ca 92614 RE: REVIEW - TENANT ALTERATION Project Information Building Permit: BUP2005 -00198 Construction Type:II B Tenant Name: The Cheesecake Factory Occupancy Type: A -2 Address: 9309 SW Washington Sq Occupant Load: 380 + The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2004 edition; and 2003 International Fire Code as amended by TVF &R The following information is required in order to complete the review. 1. Submit details on a tested, listed and approved two hour assembly separation between the A2 and S1 (storage). NOTE: A three hour separation is required between the A2 and S 1 (storage) per table 302.3.2, and when an approved sprinkler system is provided per 903.3.1.1 the fire resistance rating can be reduces by one hour. OSSC 302.3.2 exception 2. Sheet A3.1 references detail 30/A8.1 as suspended ceiling system detail belongs to lavatory support provide the suspended ceiling detail. 3. Provide details clearing up conflicts between sheet A8.0, A8.3 and sheet S 1 for attachments. 4. Provide detail clearing up conflict on sheet A2.1 grid line deflected differently. 5. Provide all missing sheets as noted "K", A6.1 & A7.4, S1.1, S7 & S8 Please provide an item by item response. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Val Henzel, Senior Plans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772