Specifications 2 1 o - CJ a7 t iar 93� , / R0( Built Up Roofing Specifications ,Jo s Manville S hn Manvill Specification 4GIS p Four Ply Smooth Surfaced Fiber Glass Built -Up Roof. For use over JM insulation, approved decks or other approved Non- Nailable Deck or Approved Insulation insulations, on inclines of up to 6 , r per foot (500 mm/m). Concrete Primer For Regions 1, 2 and 3 (If Required) Materials per 100 sq. ft. (9.3 m') of Roof Area Asphalt Concrete Primer (If required): 1 gallon (3.8 liters) 2" Felts: GlasPly Premier or GlasPly IV 4 plies a Asphalt (Interply): Trumbull or other JM Approved Asphalt — — V.V I - Incline per foot Asphalt Nominal Weight ° Up to 1" (25 mm) 170 °F, Type II, Flat 92 lbs. (42 kg) 1" to 3" (25 to 76 mm) 190 °F, Type III, Steep 92 lbs. (42 kg) n 8 i /z" Exposure t 3" to 6" (76 to 152 mm) 220 °F, Type IV, Special Steep 92 lbs. (42 kg) GlasPly Premier or 0 to 6" (0 to 152 mm) PermaMop 92 lbs. (42 kg) m N GlasPly IV Surfacing: VI I Surfacing Topgard Type A 1 - 2 gallons (6.6 - 7 6 liters) + Topgard Type B — Fibrated 2 - 3 gallons (7.6 - 11.4 liters) 4GIS Asphalt (Type consistent with slope) 15 lbs. max (6.8 kg) Fibrated Aluminum Roof Coating* 2 gallons (7 6 liters) Application Approximate installed weight 112 - 160 lbs. (51 - 73 kg) Note: On roof decks with slopes up to 2" per foot (166.6 mm /m), the roofing * For immediate application of Fibrated Aluminum Roof Coating, apply over felts may be installed either perpendicular or parallel to the roof incline. • Topgard Type B which has been allowed to dry Otherwise, apply over asphalt surfacing which has been weathered over one season On slopes over 2" per foot (166.6 mm /m), refer to Paragraph 6.11 of this section for special requirements General Using GlasPly Premier or GlasPly IV, apply a piece 9" (229 mm) wide, then over that, one 18" (457 mm) wide, then over that, one 27" (686 mm) wide. This specification is for use over any type of approved structural deck Over these 3 partial sheets, install a full width 36" (914 mm) piece. The which is not nailable and which offers a suitable surface to receive the following felts are to be applied full width, overlapping the preceding felts roof. Poured and pre -cast concrete decks require priming with JM by 27 (699 mm) so that at least 4 plies of felt cover the substrate at all Concrete Primer prior to application of hot asphalt. locations. Install each felt so that it is firmly and uniformly set, without This specification is also for use over JM roof insulations or other voids, into the hot asphalt (within ±25 °F [ ±14 °C] of the EVT) applied just approved rigid roof insulations, which are not nailable and which offer a before the felt at a nominal rate of 23 lbs. per square (1.1 kg/m') , over the suitable surface to install the roof. Specific written approval is required entire surface. Installation over porous substrates such as roof insulation for any roof insulation not manufactured or supplied by JM. Insulation may require up to 33 lbs of hot asphalt per square (1 6 kg /m should be installed in accordance with the appropriate JM Insulation Specification detailed in the current JM Commercial /Industrial Roofing Surfacing Systems Manual. This specification can also be used in certain reroofing Finish the entire membrane surface with a uniform application of the situations. Refer to the "Reroofing" section of the JM Commercial/ selected coating. Refer to Paragraph 6.9.3 of this section for more specific Industrial Roofing Systems Manual. This specification is not to be used information regarding the particular coating. Pay particular attention to directly over poured or pre -cast gypsum or lightweight, insulating the installation directions printed on the label of the container for the concrete fills. chosen coating. Design and installation of the deck and /or substrate must result in the Asphalt roof draining freely and to outlets numerous enough and so located as to remove water promptly and completely. Areas where water ponds for Asphalt should meet the requirements of ASTM D 312. more than 24 hours are unacceptable and are not eligible to receive a JM Guarantees require the use of Trumbull asphalt or another JM JM Roofing Systems Guarantee. Approved Asphalt. The Contractor must provide an Asphalt Confirmation Note: All general instructions contained in the current JM Commercial/ Number (ACN) on projects which require a JM Guarantee. The ACN will Industrial Roofing Systems Manual should be considered part of this indicate that the asphalt was registered with the approved asphalt specification. source Check with a JM Technical Services Specialist for special asphalt Flashings requirements in hot climates. Flashing details can be found in the "Bituminous Flashings" section of the JM Commercial /Industrial Roofing Systems Manual. For an identical copy of this specification, ask for RS -2030. 6 -11