Loading...
Permit T . l, „( - CITY OF TIGARD BUILDING PERMIT - t t o COMMUNITY DEVELOPMENT Permit #: BUP2009 -00167 Date Issued: 10/13/2009 T 1 GARD 13125 SW Hall Blvd , Tigard OR 97223 503 639.4171 Parcel: 2S101 CA00200 Jurisdiction: Tigard Site address: 7904 SW HUNZIKER RD Subdivision: Lot: 0 Project: PIas2Fuel Project Description: TI Owner: FEES WALL STREET INDUSTRIAL LLC & Description Date Amount A RICHARD VIAL EXEC CENTER LLC, 7000 SW Permit Fee - COM 10/13/2009 $687 70 VARNS ST 12% State Surcharge - Building 10/13/2009 $82 52 PHONE Metro Const Excise Tax - Commercial 10/13/2009 $150.00 Use Plan Review 09/10/2009 $447.01 Contractor: Plan Review - Fire Life Safety 09/10/2009 $275.08 VIAL & PHAM LLC Erosion Control 10/13/2009 $64 00 7145 SW VARNS ST Erosion Plan Review CWS 10/13/2009 $20 80 TIGARD, OR 97223 Erosion Plan Review COT 10/13/2009 $20.80 PHONE 503 - 597 -2425 CDC Bldg Review, COM 10/13/2009 $143 50 FAX 503 - 297 -2428 CDC Plan Review, COM 10/13/2009 $143.50 CDC Plan Review, COM - LRP 10/13/2009 $42 00 Specifics: Type of Use: COM Class of Work: ALT Dwelling Units: 0 Stories: 2 Height: 0 ft Bedrooms: 0 Bathrooms: 0 t. Value: $125,000 Floor Areas: Total Area 0 Accessory Struct 0 Basement 0 Carport 0 Covered Porch 0 Deck 0 Garage. 0 Mezzanine 0 Total $2,076 91 Required: Required Items and Reports (Conditions) 1 BUP Structural Welding Fire Sprinkler Yes Parapet 2 BUP Bolts in Concrete Fire Alarm: No Protected Corridors: 3 BUP Reinforced Concrete Smoke Detectors Manual Pull Stations: 4 BUP Ersn Cntrl 681 -4444 Accessible Parking 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR Specialty Codes and all other applicable law. All work will be in acco • - - - with approved plans This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 ays ATTENTION Orego -w requ - s you to follow the rules adopted by the Oregon Utility Notification Center Those r -s are set forth in OAR 952 - 001 -0010 through OAR 9 • .11 -0 I • You may obtain a copy of the rules or direct questions to OUNC by calli .• 5 • 246 6699 or 1 800 344 Issued By: / /iAt ' Permittee Signature: 1 ! 1 ' - /1 Call 503.639.4175 by 7:00 a.m, for an inspection that business day. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. i � 5 . ' Builn;ng Permit Application `I s•D Commercial CE.' FOR OFFICE lISh: ONLY ' 114 City of Tigard p �` O 1° Received DateB , ff/ Permit No , 0 �I� lee)/ ° 13125 SW Hall Blvd , Tigard, OR 97223 �Q Plan Review ' \l ` ' 0 Phone: 503.639 4171 FaX 503 598 1960 GF RIGA `, �� .'ic� � . Y Other Permit / , DateB �+ • I I G n R D Inspection Line 503 639.4175 0 ' ION \b‘‘- Date Rea.l:" 1 I a ® See Page 2 for Internet• www tigard -or gov !UK\ p ,`t Notified/Method 3 O 1 Supplemental Information TYPE OF W REQUIRED DATA: I- AND 2- FAMILY DWELLING El New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all Addition/alteration/replacement 0 equipment, materials, labor, overhead, and the •rofit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1- and 2- family dwelling Commercial /industrial Valuation: $ ❑ Accessory building ❑ Multi- family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION , Total number of floors: Job site address: q q 04. 6 , ilun Ku- New dwelling area square feet City /State /ZIP: 'l Gi L. J 09_ Q :223 Garage /carpo : ea: square feet r . ‘ Suite/bldg. /apt. no.: Project name: R A52 � Poe! VD 0 Ni Covered p• ch area: square feet Cross street/directions to job site: Deck , a: square feet Tit 1/3 all SIMA C PA yak-) a.,-S. Run2;Ker etTeef - Oth• structure area: square feet Q7 I?414 9+ mad . REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: Lot no.: 200 Permit fees* are based on the value of the work performed. Tax map /parcel no.: x kl A P 2S I Ol CA Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK _ I. f1 S +GNU a_�i all of PIc�s2 �tP�l P�c.2sSin� work indicated on this application. V aluation: $ /g J a00 I �i u i pAl //And S Existing building area: za coo square feet -4 j e, New building area: square feet ❑ PROPERTY OWNER 1`; TENANT Number of stories: /1 l_ Name: Nose i e .J Ca ()calico Type of construction: e(, Address: I-904 // AVM.; 5 Occupancy groups: r. I / 5. I / g 3 City/State/ZIP: I (GA QO 0,(2_ / � 2 " " IZZ 3 Z 11 Existing: ✓ Phone: (3W) °n1. , 5051. Fax: (3(00) S�'�' .01 16 New: N. /A APPLICANT C ONTACT P ERSON = °NOTICE Business name: rj 2 IL( CO�Qur oYl All contractors and subcontractors are required to be Contact name: licensed with the Oregon Construction Contractors Board 16104 r " ` � under ORS 701 and may be required to be licensed in the Address: t O. Huf KQ( 5treol. jurisdiction in which work is being performed. If the City /State /ZIP: 6ARo to R 22 3 applicant is exempt from licensing, the following reasons �y� apply: Phone: (20(0)2 Q II' gvic, 0 F ax:: (3Q) `Jf — 44'01 15 E -mail: 1 S61 Q pla.52&6I, Ml\ CONTRACTOR r - • Business name: V p. d � {�M ( liL BUILDING PERMIT FEES* (Please refer to fee schedule) Address: 74 c. sr,�) a( Z� I � 5-7- ,c/i/ plan review fee (or deposit): ,c/i/ o i � City /State /ZIP: l [ c„,_A cjfk il 2Z 3 f � �5. Phone: (S`9) 24 2_5 7 _ 2 Fax: (503 ) ) — c� t CCB lic.: " 2 FLS plan review fee (if applicable): � ,.,p l 6 Z q r se-8 '7 .� 8 Total fees due upon application: ` - r Amount received 12.4.6 tr Authorized signature: A-, pllfc s S Vi 42,-- This permit application expires if a permit is not obtained Cr Print name: G / .- Date: q/ /d * within 180 days after it has been accepted as complete. Fee methodology set by Tn- County Building Industry Service Board I: \Building\Permtts\BUP -COM PermttApp doc 2/23/07 440- 613T(I1/02 /COM/WEB) Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification. to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,'priority shall be given , to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex • restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains: and, • $ (g) When possible, additional accessible elements such as storage and alarms: $ • TOTAL (shall equal line [2] of Valuation Computation): $ I. \Building \ Permits \BUP -COM PermitApp doc 06/25/08 :I" A 4 ° Building Division Plan Submittal Requirements T G A R D Commercial & Multi- Family - New, Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ❑ map & tax lot # ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking, including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape -ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit - based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey, and full set of architecture drawings. I: \Building \Pemuts \BUP -COM PemutApp.doc 06/25/08 Building Division Plan Submittal Requirement Matrix T G A R D Commercial & Multi- Family - New, Additions or Alterations Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 2 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 2 Fire Protection System 2 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington County, and Tualatin Valley Fire & Rescue) I: \Building \Permits \BUP -COM PermitApp doc 06/25/08 HAZARDOUS MATERIALS INVENTORY STATEMENT PIas2Fuel Corporation, 7409 SW Hunziker Way, Tigard, OR Preparation Date: September 3, 2009 Physical Material Situation NFPA 704 Rating Material CAS No. State Location Storage Use - Closed Use -Open OSFC Hazard Class H F R SpecHaz Acetylene 74 -86 -2 Gas Maintenance 300 Ft. 300 Ft. FCG; Class 2 UR 0 4 2 Sodium Hydroxide 1310 -73 -3 Solid Maintenance 100 Lb. CORR 3 0 0 COR Parts Cleaning Solution Mixture Liquid Maintenance 25 Gal 5 Gal NonHaz 0 0 0 Degreaser Mixture Liquid Maintenance 10 Gal 10 Gal CORR 3 0 1 COR Denatured Alcohol Mixture Liquid Maintenance 55 Gal 1 Gal FL1B 1 3 0 37% Hydrochloric Acid 7647 -01 -0 Liquid Maintenance 55 Gal 1 Gal CORR 3 0 0 COR Compressed Nitrogen 7727 -37 -9 Gas Production 6,200 Ft. 6,200 Ft. ING 0 0 0 SA Synthetic Crude Oil Mixture Liquid Production 40 Gal FL1B 1 3 0 Synthetic Crude Oil Mixture Liquid Outdoor 12,700 Gal FL1B 1 3 0 Compressed Oxygen 7782 -44 -7 Gas Maintenance 504 Ft. 504 Ft. COG 0 0 0 OXY LP -Gas 74 -98 -6 Gas Maintenance 20 Lb. FLCG 1 4 0 Solid carbon char 7440 -44 -0 Solid Production 10,000 Lb. NonHaz 0 0 0 50% Sulfuric Acid 7664 -93 -9 Liquid Maintenance 5.6 Gal CORR; Class 1 WR; TOX 3 0 2 Oreeon State Fire Code Hazard Classification COG: Compressed Oxidizing Gas; CORR: Corrosive; FCG: Flammble Compressed Gas; FLCG: Flammable Liqueifed Compressed Gas; FL1B: Class IB Flammable Liquid; ICG: Inert Compressed Gas; NonHaz: Non hazardous material; TOX: Toxic material; Class 2 UR: Class 2 Unstable (Reactive) material; Class 1 WR: Class 1 Water Reactive material. u Pao - o ? -&co 1!07 Commercial Application Checklist City of Tigard ° 13125 SW Hall Blvd. Tigard, OR 97223 Phone: 503.639.4171, Fax: 503.598.1960 T I G A R D Internet address: www.tigard - or.gov PROJECT INFORMATION Project name: Pla2 Fuel Cor lac- o>n Date: OGI _ DGi , oq Address: Gi 6.1A), Nunlike( 5Free4 City: II. aal State: ZIP: cj'42.23 Scope of work: Tp,{1Cte1h Il11•rry , e45 AI- terahauls Reference no.: Map and tax -lot no.: 25 101 cA - Lo+ ZOO Contact person name: ''A 14AJ Sp b Company: PIas 2 Fu& COC' Urra M Phone: 20 ( .29I- 320(D Fax: 3(e0.54 -- 0115' Cellular phone: 2.0 • Zq I - g20(9 E -mail: rhaXisen e, i Ial 2 �u �1 (Awn NOTES AND INSTRUCTIONS • The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan review will not take place until a complete package is submitted. • This checklist can be used for all commercial construction projects, including new construction, additions, alterations and tenant improvements. • • For complex projects, applicants should use the "location" space to note the item's location and page number from the plans or the specification book. • It is not necessary to duplicate submittal information, even if it is asked for in multiple sections. • In the checklist, "Required" means that the applicant must provide this information for plan review. • In the checklist, "P" means — • if checked by the applicant — the information is provided for the plan review. • if checked by-the plans reviewer — this information is required for the plan review. • In the checklist, "NA" means that the information does not apply. • Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project Data," must be included with each project submitted. PRE- SUBMITTAL PROCESS An applicant may request a pre - submittal meeting with representatives of the jurisdiction in which the project will be built. The meeting may take place during the conceptual, schematic, or in- progress phase, or when the applicant has completed plans. INDEX OF CHECKLIST SECTIONS 1.0 General project data Page 2 7.0 Mechanical data (Types I and II 2.0 Civil data Page 2 kitchen -hood permits) Page 6 3.0 Architectural data Page 3 8.0 Plumbing data Page 7 4.0 Structural data Page 4 9.0 Electrical data Page 8 5.0 Mechanical data (new construction, tenant 10.0 Fire - suppression data Page 9 improvement, gas - piping permits) Page 5 11.0 Fire - detection and fire -alarm data Page 9 6.0 Mechanical data (additional or replacement 12.0 Re -roof installation data Page 10 rooftop- equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10 This checklist is for building department jurisdictions in Clackamas, Multnomah, and Washington counties. 440 -2734 (8 /O1/WEB /COM) 1.\Bu,lding\Forms \COM- Checklist doc 02/26/07 • SECTION. 1.0 =. GENERAL PROJECT DATA • . Construction documents Location (sheet number or spec section) 1.1 ® Required No. of sets of plans: New: 1 TI: 2 1.2 ® Required Cover sheet title block 1.3 ® Required Cover sheet vicinity map 1.4 ® Required Cover sheet plan index 1.5 „ ❑ P . ❑ NA Code summary 1.6 ❑ P ❑ NA Deferred submittal summary • 1.7 • '❑ P ❑ NA • Professional stamp and signature ' , : • • ' 1.8 ❑ P ❑ NA Fire and life- safety plan ;,.; °' 1.9 , ❑ P ❑ NA .. Landscape plan 1.10 ❑ P ❑ NA Landscape specifications Supportin ! Notes 1.20 V P ❑ NA :'Land -use or,planning actions • <= 1.21., P, ,❑ •NA Required,fire -flow calculations 1.22 ❑ P ❑ NA Fire- hydrant flow test report 1.23 ❑ P ❑ NA Fire department or fire district building survey report 1.24 r, P ❑ NA Material safety data sheets (MSDS) SECTION 2.0 — CIVIL DATA - • Construction documents Location (sheet number or spec section) 2.1 ® Required Site plan 2.2 ® Required Site utility plan 2.3 ® Required Grading plan 2.4 ® Required Erosion - control plan 2.5 ❑ P ❑ NA Utility -vault location and details Suppo ' i g documents Notes 2.20 ►'� P ❑ NA Geotechnical /soil engineer report 2.21 ❑ P ❑ NA Storm -water calculations 2.22 ❑ P ❑ NA Site retaining -wall structural calculations 2.23 ❑ P ❑ NA "Assurance of Compliance" with environmental rules .: • 440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 2 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1 \Buddmg\Forms \COM- Checklist.doc SECTION 3.0' - ARCHITECTURAL DATA Construction documents Location (sheet number or spec section) 3.1 ® Required Floor plan(s) 3.2 ® Required Transverse and longitudinal cross sections 3.3 ® Required OSSC Chapter 11 accessibility requirements 3.4 ❑ P ❑ NA Interior elevations 3.5 ❑ P ❑ NA Exterior elevations 3.6 ❑ P ❑ NA Roof plans 3.7 ❑ P ❑ NA Exterior wall sections and details 3.8 ❑ P ❑ NA Reflected ceiling plan(s) 3.9 ❑ P ❑ NA Fire -rated construction details 3.10 ❑ P ❑ NA Energy code compliant construction details and specifications 3.11 ❑ P ❑ NA Door schedule 3.12 ❑ P ❑ NA Glazing schedule 3.13 ❑ P ❑ NA Furniture plan Supporting documents Notes 3.20 ❑ P ❑ NA Energy code compliance forms /calculations 3.21 P ❑ NA Material safety data sheets (MSDS) 3.22 P ❑ NA Hazardous materials inventory statement (HMIS) 3.23 P ❑ NA Hazardous materials management plan (HMMP) 3.24 ❑ P ❑ NA Written fire and life- safety evacuation plan for area of rescue assistance . 3.25 ❑ P ❑ NA Active and passive smoke - control information 440 -2734 (8 /01/WEB /COM) Tri- County Commercial Application Checklist 3 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties r \Buddmg\Forms \COM- Checklist doc SECTION 4:0. — STRUCTURAL DATA r , Construction documents Location (sheet number or spec section) 4.1 ® Required Structural cover sheet 4.2 ❑ P ❑ NA Foundation plan 4.3 ❑ P ❑ NA Under -slab mechanical plan 4.4 ❑ P ❑ NA Under -slab electrical plan 4.5 ❑ P El NA Under -slab plumbing plan 4.6 ❑ P ❑ NA Floor framing plan 4.7 ❑ P ❑ NA Roof framing plan 4.8 El P El NA Structural elevations 4.9 ❑ P ❑ NA Structural details and cross sections 4.10 ❑ P El NA Standpipe information 4.11 ❑ P ❑ NA Special inspector /structural observation matrix Supporting documents Notes 4.20 P El NA Geotechnical /soil engineer report 4.21 P ❑ NA Site - specific seismic hazard report 4.22 ❑ P ❑ NA Design narrative 4.23 ❑ P ❑ NA Structural calculations • 440 - 2734 (8 /0l/WEB /COM) Tri -County Commercial Application Checklist 4 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1 \Budding \Forms \COM - Checklist doc SECTION 5.0 — MECHANICAL DATA (New construction, tenant improvement, gas piping permits) Construction documents Location (sheet number or spec section) 5.1 ® Required Floor plan 5.2 ® Required Equipment schedule 5.3 P ❑ NA Site plan 5.4 � P ❑ NA Under -slab mechanical plan 5.5 ❑. P ❑ NA Roof plan 5.6 P ❑ NA Fuel gas piping plan 5.7 P ❑ NA HVAC equipment and duct plan(s) 5.8 ❑ P ❑ NA Roof access details 5.9 ❑ P ❑ NA Duct smoke detector plans 5.10 ❑ P ❑ NA Fire /smoke damper locations 5.11 ❑ P ❑ NA Smoke control plan . • 5.12 ❑ P ❑ NA Outside air (OSA) table 5.13 ❑ P ❑ NA Refrigeration equipment and piping plan 5.14 ❑ P ❑ NA Kitchen equipment plan 5.15 ❑ P ❑ NA Type I and/or Type II kitchen hood plan (see Section 7.0 — Mechanical Data) 5.16 ❑ P ❑ NA Fume /vapor hood plan 5.17 ( P ❑ NA Process piping/product and/or exhaust - conveying duct plan 5.18 ❑ P ❑ NA Fire -rated construction details 5.19 ❑ P ❑ NA Equipment hanger /fastener details Supporting documents Notes 5.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 5.21 P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 5.22 ❑ P ❑ NA Outside air (OSA) calculations 5.23 ❑ P ❑ NA Smoke - control calculations 5.24 P ❑ NA Combustion air calculations 5.25 P ❑ NA Fuel gas piping sizing calculations 5.26 1 P ❑ NA Make -up air calculations 5.27 ❑ P ❑ NA Energy code compliance forms 5.28 ❑ P ❑ NA Boiler information 440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 5 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i \Building\Forms \COM- Checklist doc SECTION. 6:0 MECHANICAL DATA (Additional or replacement:rooftop: installation permits) Construction documents Location (sheet number or spec section) 6.1 Z Required Roof plan 6.2 ❑ P ❑ NA Roof framing plan 6.3 ❑ P ❑ NA Fuel gas piping plan 6.4 ❑ P ❑ NA Roof access details Supporting documents Notes 6.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 6.21 [yl P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 6.22 P ❑ NA Fuel gas piping sizing calculations 6.23 ❑ P ❑ NA Energy code compliance forms SECTION 7.0 — MECHANICAL DATA (Type 1 and Type H kitchen hood permits) Construction documents Location (sheet number or spec section) 7.1 ® Required Site plan 7.2 ® Required Floor plan(s) 7.3 ® Required Kitchen equipment plan 7.4 ® Required Kitchen equipment and hood elevations . . 7.5 ❑ P ❑ NA Roof plan 7.6 ❑ P ❑ NA Cross sections through hoods, ducts and shafts 7.7 ❑ P ❑ NA Fire -rated construction details 7.8 ❑ P ❑ NA Fire suppression details Supporting documents Notes 7.20 Z Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 7.21 ® Required Make -up air calculations 7.22 P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications 7.23 ❑ P ❑ NA Hood/grease extractor listing documentation 7.24 ❑ P ❑ NA Hood/grease duct sizing calculations 7.25 ❑ P ❑ NA Fire suppression information 440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 6 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I \Building \Fortes \COM - Checklist doc SECTION 8.0 PLUMBING DATA Construction documents Location (sheet number or spec section) 8.1 ® Required Floor plan(s) 8.2 ® Required Piping and material schedule 8.3 ® Required Equipment layout plan 8.4 ® Required Fixture schedule 8.5 ❑ P ❑ NA Site utility plan 8.6 ❑ P ❑ NA Building cross section 8.7 ❑ P ❑ NA Rise diagram 8.8 ❑ P ❑ NA Roof plan R .. r .. 8.9 ❑ P ❑ NA Back flow prevention loca • In 8.10 ❑ P El NA Irrigation plan 8.11 ❑ P ❑ NA Fire -rated constructi. details 8.12 ❑ P ❑ NA Under -slab plum.' g plan Supporting documents Notes 8.20 ® Required Structural . lculations for vertical loads and lateral loads fo equipment weighing over 400 pounds 8.21 ❑ P ❑ NA Equi s ent manufacturers' catalog "cut sheets" or •.ecifications • 8.22 ❑ P ❑ NA . tility maintenance agreements 8.23 ❑ P ON' Water supply calculations 8.24 ❑ P ❑ ■ A Sanitary system calculations 8.25 ❑ P ❑ A Irrigation demand calculations - - 8.26 ❑ P ❑ NA Roof drain and storm water calculations 440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 7 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building \Forms \COM - Checklist doc SECTION 9.0 ELECTRICAL DATA Construction documents Location (sheet number or spec section) 9.1 ® Required No. of sets 'of plans: 2 9.2 ® Required Floor plan(s) 9.3 ® Required Electrical load calculations 9.4 ® Required One line diagram 9.5 ® Required Feeder riser diagram 9.6 ® Required Available fault current information • 9.7 ® Required Panel schedule(s) 9.8 P El NA Site electrical plan 9.9 P ❑ NA Fire -rated construction details 9.10 ❑ P ❑ NA Lighting plan 9.11 ❑ P ❑ NA Emergency power system and emergency lighting plan 9.12 ❑ P ❑ NA Under -slab electrical plan Supporting documents Notes 9.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 9.21 ❑ P ❑ NA Energy code compliance forms and calculations for lighting 9.22 P ❑ NA Emergency power system specifications 9.23 ❑ P ❑ NA Feeder riser information 9.24 ❑ P ❑ NA Lighting equipment manufacturers' catalog "cut sheets" or specifications 440 -2734 (8 /O1/WEB /COM) Tri -County Commercial Application Checklist 8 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1 \ Building \Fortes \COM- Checklist.doc • • SECTION 10.0 - FIRE SUPPRESSION DATA Construction documents Location (sheet number or spec section) 10.1 ® Required Floor plan(s) 10.2 ® Required Sprinkler piping plan(s) 10.3 ❑ P ❑ NA Site plan 10.4 ❑ P ❑ NA Standpipe information 10.5 ❑ P ❑ NA Back flow prevention information 10.6 ❑ P ❑ NA Reflected ceiling plan(s) 10.7 ❑ P ❑ NA Transverse and longitudinal cross sections 10.8 ❑ P ❑ NA Fire -rated construction details 10.9 ❑ P LI NA Specialty fire suppression system plans and list of systems Supporting documents Notes 10.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 10.21 ® Required Equipment manufacturers' catalog "cut sheets" 10.22 ❑ P ❑ NA Hydraulic calculations 10.23 LI P ❑ NA Specialty fire suppression system information SECTION 11.0 - FIRE DETECTION AND ALARM DATA Construction documents Location (sheet number or spec section) 11.1 Required Floor plan(s) 11.2 ❑ P ❑ NA Site plan 11.3 ❑ P ❑ NA Reflected ceiling plan(s) 11.4 ❑ P ❑ NA Transverse and longitudinal cross sections 11.5 ❑ P ❑ NA Wiring schematic 11.6 ❑ P ❑ NA Elevator recall information 11.7 ❑ P ❑ NA Operational matrix 11.8 ❑ P ❑ NA Fire -rated construction details 11.9 ❑ P ❑ NA Standard electrical notes Supporting documents Notes 11.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 11.21 ® Required Equipment manufacturers' catalog "cut sheets" 11.22 ® Required Installer certification information 11.23 LI P ❑ NA Battery calculations 11.24 ❑ P ❑ NA Sample fire alarm log book 11.25 ❑ P ❑ NA Emergency power system specifications 11.26 LI P ❑ NA Monitoring station information 11.27 ❑ P ❑ NA Voltage drop calculations 440 -2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 9 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties \Building\Forms \COM- Checklist doc SECTION 12.0 — RE -ROOF INSTALLATION DATA -, Construction documents Location (sheet number or spec section) 12.1 ® Required Site plan or building location map 12.2 ® Required Occupancy classification 12.3 ® Required Type of construction 12.4 ® Required Minimum roof class require 12.5 ® Required Class of roofing to be ins . led N/A 12.6 ® Required Roof plan ' 12.7 ❑ P ❑ NA Parapet and scuppe - cross section(s) Supporting documents Notes 12.20 ® Required Pre -re -roof • • pection report 12.21 ® Required Roofing stem listing information 12.22 ® Required Roofing manufacturer's catalog "cut sheets" 12.23 ❑ P ❑ NA Structural calculations 12.25 ❑ P ❑ NA Structural engineer's report SECTION 13.0 - JURISDICTIONAL – SPECIFIC REQUIREMENTS Construction documents Item Location (sheet number or spec section) 13.1 ❑ P ❑ NA ❑ Required 13.2 ❑ P ❑ NA ❑ Required 13.3 ❑ P ❑ NA ❑ Required 13.4 ❑ P ❑ NA ❑ Required 13.5 ❑ P ❑ NA ❑ Required 13.6 ❑ P ❑ NA ❑ Required 13.7 ❑ P ❑ NA ❑ Required 13.8 ❑ P ❑ NA ❑ Required 13.9 ❑ P ❑ NA ❑ Required 13.10 ❑ P ❑ NA ❑ Required 440 - 2734 (8 /01/WEB /COM) Tri -County Commercial Application Checklist 10 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1.\Buildmg\Forms \COM- Checkl ist.doc This form is recognized by most Building Departments in the Tri- County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. 1 1 4 q BUILDING DIVISION C TIGARD TRANSMITTAL LETTER a D a, 1 0S-ft. DATE RECEIVED: DEPT: BUILDING DIVISION RECENFO FROM: OCT 2 0 2009 - 1f 3 Zr Cot �, ��, CITY NG TIGARD COMPANY: � 2 � BUILDING DIVISION PHONE: 2,0 (0 - - J 2L7(0' (C,e ) B Y — RE: Lip Z001- ) (07 (Site Address) ( Case Number) (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor /roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other (explain): REMARKS: FOR OTFI E USE ONLY Routed to Permit Technician: Date: (0 /Ct Initial Fees Due: ❑ Yes LICo Fee Description: Amount ue: Special Instructions: Reprint Permit (per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: I \Building\ Forms \TransmittalLetter - Revisions doc 4/4/07